Tender Results of Bagherpara Paurashava

Tender Results of Bagherpara Paurashava

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date14 Jul 2024
Contract AmountBDT 2 Million (USD 17.3 K)
1.Improvement of Open Speace near Poultry and Meat Market by BFS at Bagherpara Bazar. In Ward No.-03, 2. Repair and maintenance of Pourashava Kitchen and Meat Tin Shade at Bagherpara Bazar, In Ward No.-03, 3. Construction of Brick drain with Cover slab and 02 Nos Brick Pit of Pourashava Kitchen and Meat Tin Shade at Bagherpara Bazar, In Ward No.-03, 4. Improvement of Road PART-A=Degree College Road to H/O Alomgir (Ch.0-45),PART-B=BC Road to H/O Bilal (Ch.0-21),PART-C= Near H/O Farique (Ch.0-09),PART-D= Sarder Bari BC Road to H/O Alomgir(Ch.0-09), PART-E= Existing BFS Road to H/O Nisar (Ch.0-67),PART-F=Existing CC Road to H/O Tobibor (Ch.0-27),PART-G= H/O Mojibul to H/O Sohidul (Ch.0-9.5), PART-H=H/O Atihar to H/O Nur Islam (Ch.0-12.5), PART-I=Degree College Road to H/O Kamrul (Ch.0-15),PART-J= Degree College Road to H/O Rahina Khatun(Ch.0-15), PART-K= Degree College Road to H/O Jillur (Ch.0-15.0), PART-L=Earth Filling Work for Sarder Bari Jami Mosque back side pond PART-M=Boldaghata road to H/O Mojid Biswash (Ch.0-22) at Dohakhula, In Ward No-06, and 5. PART-A=Fitting and Fixing Thai Glass window and Tiles work in Dohakhola Mollah Bari Mosque & PART-B= Construction Rcc Lintle work Mollah Bari (Uttor Para) Zami Mosque. In Ward no-05, Total Length-267.0m, ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date14 Jul 2024
Contract AmountBDT 2.2 Million (USD 19.3 K)
1. Repair and Maintenance of (Ground Floor) Bagherpara Sub Regisrty Office Dohakhola in Word No-04, 2. Construction of Brick Drain (Ch.0-20) and Improvement of Road by BFS (Ch.0-35) near Pollibiddut Office In Ward No-09, 3. Construction of RCC Road From Degree College Road to H/O Shontos Adhakori (Ch.0-24) at Dohakhola in Word No-06, 4. Supplying & fittings PART-A=Wall Tiles for Dohakhola Kouami Madrasha at Dohakhola In Ward No-05, PART-B=Floor Tiles for Bagherpara Upzila Health Complex Ozu Khana and Tin Shade for Mosque verandah, In Ward No-08, PART-C= Tin Shade for roofing Stair casr of Koraitola Zami Moszid, In Ward No-08,PART-D=Roof Patten Stone casting and 2 Ton Air Condition for Khankh Shorif Zami Mosque, In Ward No-02, PART-E= Cement Plastering for Bagherpara Mollah Bari Graveyard Boundary Wall at Word No-02 ,4. Construction of RCC Stage (Extention) for Bagherpara Thana compound. In Ward No-03and 5. Construction of CC Floor & Plaster of Talbaria Darus Sunnah Madrasha at Ward No-04 Under Bagherpara Pourashava,Jadhore, ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date11 Jul 2024
Contract AmountBDT 2.2 Million (USD 19.2 K)
(1) Improvement/Construction of road by BFS PART-A= H/O Faisal Councilor -27.0m, PART-B=H/O Rashid-25.00m, PART-C= Mandir to H/O Santosh Debnath -23.0m, PART-D= Raipur Road to H/O Bijan Debnath-50.0m, PART-E= Mandir to H/O Narayan-18.0m,PART-F= Mandir road to H/O Gopal-14.00m,PART-G=Mandir road to H/O Subas Debnath- 23.0m,PART-H=Graveyard B/W=33.0m Beside Raipur Road,Total Length=180.0m. In Ward No-01, (2) Improvement of road by BFS PART-A=BC Road to H/O Mustafa-30.m, Khanka Sharif road PART-B=to H/O Elias -23.0m, PART-C= H/O Liton-20.0m,PART-D= H/O Shorif Bari Soling Road-14.0m, PART-E= to Nurnabi Bari Road -40.0m, PART-F= H/O Mohid to Shaheen's land-32.0m, PART-G= Near H/O Firoz-6.0m, PART-H=H/O Montu mia to Mostak-22.0m, PART-I=H/O Billal Sheikh-15.0m,PART-J=Near H/O Shoriful-12.0m,PART-K=H/O Taleb to Taijul -15.0m, PART-L=from Al Helal Trust to H/O Al Amin-35.0m,PART-M=from H/O Kabir to Tito-15.0m,PART-N=BC Road to H/O Masud Kabir-21.0m, PART-O=from H/O Aiub Ali to Mostak -37.0m, PART-P=from Raipur Road to H/O Arzan -28.0m Total Length=365.0m In Ward No-02, (3) Improvement of road by BFS PART-A= from Balia Danga BC Road to H/O EX Mayor Abdul Hai(-23.0m),PART-B=to H/O Abjal -6.0m, PART-C=Shasun Road to H/O Mohid -13.0m, PART-D=from Balia Danga Road to H/O Jillur-33.0m, PART-E=to H/O Masud Via Julfikkar -75.m, PART-G=to H/O Rabeya khatun -16.0m, PART-H=from Bir Danga Road to H/O Goffar -24.0m, PART-I= to H/O Jogodis -55.0m, PART-J= to H/O Dr. Uttom-30.0m, PART-k=H/O Guru das to Narod -40.0m, PART-M=Tin shade with door & window for Aatgram Moha Shosan Kali Mondir & PART-N=H/O Humayun to Bilal -10.0m Total Length=325.0m In Ward No 04 and (4)Maintanance of Brick Drain Beside Sampa Counsilor House(Ch.40-112.0m) Repair & (New) Drain Ch-112 to 127m at Word No-02, Total Length-870.0m Under Bagherpara Pourashava,Jashore, ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date11 Jul 2024
Contract AmountBDT 2.6 Million (USD 22.5 K)
(1) Improvement of Brick Flat Soling PART-A=H/O Mahabur to Mujibar-17.0m,PART-B=BC road to H/O Monirul -19.0m,PART-C= BC road to H/O Nuruzzaman-61.0m,PART-D=to H/O Zaker-25.0m,PART-E=to H/O Aminur-21.0m,PART-F=to H/O Late Mohor Ali-10.0m,PART-G=to H/O Masud-20.0m, at Mohiron In Ward No.09 (2) Improvement of BFS Road from Govt Graveyard Road to PART-A= Uttor Para Jami Mosque -102.0m,PART B=H/O Majedul land-153.0m at Mohiron, In Ward No-07,(3)Improvement BFS Road From Koraitala Main BC Road to PART-A= H/O Jahangir- 14.0m, PART-B= H/O Noyon-17.0m,PART-C= Near H/O Shamsur- 6.0m,PART-D= Near H/O Abdus salam-30.0m,PART-E=from H/O Omar to Razzak-25.0m,PART-F=from Koroitola BC Road to H/O Salim-32.0m,PART-G=Post Office BC Road to H/O Saheen-20.0m,PART-H=BC Road to H/O Ismail Hossain-8.0m, In Ward No.8,(4)PART-A=Supplying & Fitting of Steel Door,Window and Tin B/W for Bornomoy Kinder Garten School and PART-B= Installation thai glass window for Koumi Islamia Madrasha,PART-C= Improvement/Maintenance BFS road from Shershah Main Road to H/O Murshid -157.0m,PART-D=H/O Mursud to Rashmi-22.0m ,PART-E=Wall Tiles for Mohiran Uttor Para Jami Mosque Ozu Khana at Word No-07,(5)Improvement of BFS Road PART-A=BC road to H/O Zulfiqar-7.0m,PART-B=BC road to H/O Shoriful-13.0m,PART-C=BC road to H/O Mizanur-10.0m,PART-D=BC road to H/O Foridul-16.0m,PART-E=Qawmi Madrasa to Yatimkhana-40.0m,PART-F=BC Road to H/O Olear Coouncilor-8.0m, Madhyapalli Govt. School Road PART-G= H/O Showkat-30.0m,PART-H= Madhyapalli Govt. School Road-27.0m,PART-I= H/O Oliar(Ch.0 to 21.00m),PART-J=H/O Assab Ali to Madhyapalli Govt. School road-15.0m,PART-K=H/O Masud to Madhyapalli Govt. School road-13.0m,PART-L= H/O Mokles to college road-44.0m,PART-M=BC road to H/O Rimi-23.0m,PART-N=H/O Animesh to BC road-8.0m,PART-O=H/O Joynal to BC road-35.0m,PART-P= H/O Suri to H/O Aminur-40.0m, PART-Q=H/O Aslam to BC road-17.0m, Package No-02 Total Length-1169.0m In ward No-05 Under Bagherpara Pourashava,Jashore, ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date10 Jul 2024
Contract AmountBDT 483 K (USD 4.1 K)
1. Improvement/Butification PART-A=BFS inside of Health Complex Parking Area, PART-B=BFS Infront of Mosque Bagherpara Health Complex and PART-A=Reparing of Tin Shade for Bagherpara Central Mondir at Mohiran Word No-08,PART-B= Soling Road From Atgram Moha Soshan road to Mustafiz House (Ch.0-30.0)m at Dohakhola Word No-04 , PART-C= Soling Road From Sashan BC Road to H/O Mohid (Ch.0-13) at Dohakhola Ward No-04, PART-D=H/O Humayun to H/O Billal(Ch.0-10) at Dohakhola,Package Total Road Length=53.0m In Ward No-04 Under bagherpara Pourashava, Jashore., ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date10 Jul 2024
Contract AmountBDT 941.3 K (USD 8 K)
Improvement of road by BFS PART-A=H/O freedom fighter Mannan to H/O Journalist Iqbal (Ch.0-116) Total Length=116.0m at Dohakhola.In Ward No 04.and 2. Improvement of road by BFS PART-A=Near H/O Imran (Ch.0-57) at Mohiran in Ward No.9, PART-B=BC Road to H/O Abdur Salam (Ch.0-30.50) at Mohiran In Ward No. 07, PART-C=Near H/O Ashrafun Nahar(Ch.0-29) at Mohiran In Ward No. 07,( PART-D= Govt. Graveyard Road to H/O Ahad(Ch.0-44) at Mohiran In Ward No. 07, PART-E=Govt. Posu Hospital Road to H/O Shaheen(Ch.0-22) at Mohiran In Ward No. 07, PART-F=Construction of Brick Drain from H/O Rajul Haque to H/O Haque master (Ch.0-18.50)at Mohiran In Ward No-07, PART-G= Main BC Road to Mohiran Central Temple,(Ch.0-32) at Mohiran In Ward No-08, PART-H=Koraitala Main BC Road to H/O Amal,(Ch.0-19) at Mohiran In Word No-08, PART-I=Near H/O Moyen to H/O Togar,(Ch.0-63)at Koraitola In Ward No-08 , PART-J=Near H/O Mihir (Ch.0-18.5)at Mohiran In Ward No-07, PART-K=Govt.Grveyard Road to H/O Jahidul Islam (Ch.0-63) Total Length-396.0m at Mohiran Ward No-07, Under Bagherpara Pourashava, Jashore , ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date10 Jul 2024
Contract AmountBDT 1.5 Million (USD 12.9 K)
Repair and Maintanance of Existing (120 Nos) Solar Street Light(Old) for Different Location Under Bagherpara Pourashava,Bagherpara Jashore, ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date7 Jul 2024
Contract AmountBDT 1.2 Million (USD 10.4 K)
PART-A=Construction of RCC Main Gate with Boundary wall for Bagherpara Govt. Graveyard at Ward No-07,PART-B= BFS Road From Boharampur Main BC Road to Land of EX.Mayor Abdul Hai Mona (Ch.0-72) Total Road Length=72.0m at Ward No-05 Under Bagherpara Pourashava, Jashore, , ADP FY=2023-24

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Contract Date4 Jul 2024
Contract AmountBDT 3.2 Million (USD 28 K)
(1) Maintenance work for Bagherpara Pourashava Office Compaund (Part-A) Bathroom Reparing works 04 Nos Common Toilet & Mayor Room Toilet,(Part-B) Reparing of Pipe Line for Toilet, (Part-C) Floor Tiles General Section,(Part-D) Scharting Work Building Roof,(Part-E) Supplying 03 Nos Waiting Chair,15 Nos Visitor Chair (Part-F) Tin Shade Track Gurage ,(Part-G)Parking Tiles For Motor Cycel Gurage (Part-H) 12 Nos Dustbin for Different Location of Pourashava Area.(Part-I) Butyfication of Pourashava area,(Part-J) 03 Nos Cover Slab Infront of Mojid Market Rcc Drain (Part-K) 2 Ton AC For Metting Room, (2)Improvement of road by BFS PART-A= From Raipur BC Road to H/O Dulal(Ch.0-40). In ward no-01 ,PART-B= From Raipur Mondir Road to H/O Tapos (Ch.0-74) at word no-01, PART-C= From Raipur Road to H/O Akbor (Ch.0-16) at word no-01,PART-D= From Mill Road to H/O Samad (Ch.0-68) at word no-02 ,PART A=From Mirpur Road to H/O Ashraf (Ch.0-12) at word No-03,PART-F=From Boharampur BC Road to H/O Soukot (Ch.0-57.0) at word No-05,PART-G=From Boharampur BC Road to H/O Torikul (Ch.0-28) at word No-05,PART-H= From Boharampur BC Road to H/O AZIM (Ch.0-40) at word No-05, PART-I= From Koraitola BC Road to H/O Nirmol (Ch.0 75) at word No-08,PART-J= From Koraitola BC Road to H/O Mostofa (Ch.0-24) at word No-08,PART-K= From Koraitola BC Road to H/O Shoriful (Ch.0-33) at word No-08,PART L=From Koraitola BC Road to H/O khadim (Ch.0-35) at word No-08,PART-M= From Sher Sha Road to H/O Johar Sorder (Ch.0-41) at word No-09,PART-N= From Mill Road to H/O Bliat (Ch.0-28) at word No-09,PART-O= Mill Road to H/O Ripon (Ch.0-41) at word No-09,PART-P=From H/O Bahauddin to H/O Asharaf (Ch.0-58) at word No-09,PART Q=Near H/O Rojibul to H/O Hakim (Reparing) (Ch.0-23(New) (Ch.23-36) Total Length=683.0m at word No-09 (3)PART-A=Installation 50 Nos Sallow Tubewell & PART-B= 50 Sets Ring with RCC Cover Slab for Different Location of Bagherpara Pourashava, Jashore, ADP FY=2023-24