Tender Results of Bagherpara Paurashava

Tender Results of Bagherpara Paurashava

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
1.Improvement of Open Speace near Poultry and Meat Market by BFS at Bagherpara Bazar. In Ward No.-03, 2. Repair and maintenance of Pourashava Kitchen and Meat Tin Shade at Bagherpara Bazar, In Ward No.-03, 3. Construction of Brick drain with Cover slab and 02 Nos Brick Pit of Pourashava Kitchen and Meat Tin Shade at Bagherpara Bazar, In Ward No.-03, 4. Improvement of Road PART-A=Degree College Road to H/O Alomgir (Ch.0-45),PART-B=BC Road to H/O Bilal (Ch.0-21),PART-C= Near H/O Farique (Ch.0-09),PART-D= Sarder Bari BC Road to H/O Alomgir(Ch.0-09), PART-E= Existing BFS Road to H/O Nisar (Ch.0-67),PART-F=Existing CC Road to H/O Tobibor (Ch.0-27),PART-G= H/O Mojibul to H/O Sohidul (Ch.0-9.5), PART-H=H/O Atihar to H/O Nur Islam (Ch.0-12.5), PART-I=Degree College Road to H/O Kamrul (Ch.0-15),PART-J= Degree College Road to H/O Rahina Khatun(Ch.0-15), PART-K= Degree College Road to H/O Jillur (Ch.0-15.0), PART-L=Earth Filling Work for Sarder Bari Jami Mosque back side pond PART-M=Boldaghata road to H/O Mojid Biswash (Ch.0-22) at Dohakhula, In Ward No-06, and 5. PART-A=Fitting and Fixing Thai Glass window and Tiles work in Dohakhola Mollah Bari Mosque & PART-B= Construction Rcc Lintle work Mollah Bari (Uttor Para) Zami Mosque. In Ward no-05, Total Length-267.0m, ADP FY=2023-24
Contract Date14 Jul 2024
Contract AmountBDT 2 Million (USD 17.3 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
1. Repair and Maintenance of (Ground Floor) Bagherpara Sub Regisrty Office Dohakhola in Word No-04, 2. Construction of Brick Drain (Ch.0-20) and Improvement of Road by BFS (Ch.0-35) near Pollibiddut Office In Ward No-09, 3. Construction of RCC Road From Degree College Road to H/O Shontos Adhakori (Ch.0-24) at Dohakhola in Word No-06, 4. Supplying & fittings PART-A=Wall Tiles for Dohakhola Kouami Madrasha at Dohakhola In Ward No-05, PART-B=Floor Tiles for Bagherpara Upzila Health Complex Ozu Khana and Tin Shade for Mosque verandah, In Ward No-08, PART-C= Tin Shade for roofing Stair casr of Koraitola Zami Moszid, In Ward No-08,PART-D=Roof Patten Stone casting and 2 Ton Air Condition for Khankh Shorif Zami Mosque, In Ward No-02, PART-E= Cement Plastering for Bagherpara Mollah Bari Graveyard Boundary Wall at Word No-02 ,4. Construction of RCC Stage (Extention) for Bagherpara Thana compound. In Ward No-03and 5. Construction of CC Floor & Plaster of Talbaria Darus Sunnah Madrasha at Ward No-04 Under Bagherpara Pourashava,Jadhore, ADP FY=2023-24
Contract Date14 Jul 2024
Contract AmountBDT 2.2 Million (USD 19.3 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
(1) Improvement/Construction of road by BFS PART-A= H/O Faisal Councilor -27.0m, PART-B=H/O Rashid-25.00m, PART-C= Mandir to H/O Santosh Debnath -23.0m, PART-D= Raipur Road to H/O Bijan Debnath-50.0m, PART-E= Mandir to H/O Narayan-18.0m,PART-F= Mandir road to H/O Gopal-14.00m,PART-G=Mandir road to H/O Subas Debnath- 23.0m,PART-H=Graveyard B/W=33.0m Beside Raipur Road,Total Length=180.0m. In Ward No-01, (2) Improvement of road by BFS PART-A=BC Road to H/O Mustafa-30.m, Khanka Sharif road PART-B=to H/O Elias -23.0m, PART-C= H/O Liton-20.0m,PART-D= H/O Shorif Bari Soling Road-14.0m, PART-E= to Nurnabi Bari Road -40.0m, PART-F= H/O Mohid to Shaheen's land-32.0m, PART-G= Near H/O Firoz-6.0m, PART-H=H/O Montu mia to Mostak-22.0m, PART-I=H/O Billal Sheikh-15.0m,PART-J=Near H/O Shoriful-12.0m,PART-K=H/O Taleb to Taijul -15.0m, PART-L=from Al Helal Trust to H/O Al Amin-35.0m,PART-M=from H/O Kabir to Tito-15.0m,PART-N=BC Road to H/O Masud Kabir-21.0m, PART-O=from H/O Aiub Ali to Mostak -37.0m, PART-P=from Raipur Road to H/O Arzan -28.0m Total Length=365.0m In Ward No-02, (3) Improvement of road by BFS PART-A= from Balia Danga BC Road to H/O EX Mayor Abdul Hai(-23.0m),PART-B=to H/O Abjal -6.0m, PART-C=Shasun Road to H/O Mohid -13.0m, PART-D=from Balia Danga Road to H/O Jillur-33.0m, PART-E=to H/O Masud Via Julfikkar -75.m, PART-G=to H/O Rabeya khatun -16.0m, PART-H=from Bir Danga Road to H/O Goffar -24.0m, PART-I= to H/O Jogodis -55.0m, PART-J= to H/O Dr. Uttom-30.0m, PART-k=H/O Guru das to Narod -40.0m, PART-M=Tin shade with door & window for Aatgram Moha Shosan Kali Mondir & PART-N=H/O Humayun to Bilal -10.0m Total Length=325.0m In Ward No 04 and (4)Maintanance of Brick Drain Beside Sampa Counsilor House(Ch.40-112.0m) Repair & (New) Drain Ch-112 to 127m at Word No-02, Total Length-870.0m Under Bagherpara Pourashava,Jashore, ADP FY=2023-24
Contract Date11 Jul 2024
Contract AmountBDT 2.2 Million (USD 19.2 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
(1) Improvement of Brick Flat Soling PART-A=H/O Mahabur to Mujibar-17.0m,PART-B=BC road to H/O Monirul -19.0m,PART-C= BC road to H/O Nuruzzaman-61.0m,PART-D=to H/O Zaker-25.0m,PART-E=to H/O Aminur-21.0m,PART-F=to H/O Late Mohor Ali-10.0m,PART-G=to H/O Masud-20.0m, at Mohiron In Ward No.09 (2) Improvement of BFS Road from Govt Graveyard Road to PART-A= Uttor Para Jami Mosque -102.0m,PART B=H/O Majedul land-153.0m at Mohiron, In Ward No-07,(3)Improvement BFS Road From Koraitala Main BC Road to PART-A= H/O Jahangir- 14.0m, PART-B= H/O Noyon-17.0m,PART-C= Near H/O Shamsur- 6.0m,PART-D= Near H/O Abdus salam-30.0m,PART-E=from H/O Omar to Razzak-25.0m,PART-F=from Koroitola BC Road to H/O Salim-32.0m,PART-G=Post Office BC Road to H/O Saheen-20.0m,PART-H=BC Road to H/O Ismail Hossain-8.0m, In Ward No.8,(4)PART-A=Supplying & Fitting of Steel Door,Window and Tin B/W for Bornomoy Kinder Garten School and PART-B= Installation thai glass window for Koumi Islamia Madrasha,PART-C= Improvement/Maintenance BFS road from Shershah Main Road to H/O Murshid -157.0m,PART-D=H/O Mursud to Rashmi-22.0m ,PART-E=Wall Tiles for Mohiran Uttor Para Jami Mosque Ozu Khana at Word No-07,(5)Improvement of BFS Road PART-A=BC road to H/O Zulfiqar-7.0m,PART-B=BC road to H/O Shoriful-13.0m,PART-C=BC road to H/O Mizanur-10.0m,PART-D=BC road to H/O Foridul-16.0m,PART-E=Qawmi Madrasa to Yatimkhana-40.0m,PART-F=BC Road to H/O Olear Coouncilor-8.0m, Madhyapalli Govt. School Road PART-G= H/O Showkat-30.0m,PART-H= Madhyapalli Govt. School Road-27.0m,PART-I= H/O Oliar(Ch.0 to 21.00m),PART-J=H/O Assab Ali to Madhyapalli Govt. School road-15.0m,PART-K=H/O Masud to Madhyapalli Govt. School road-13.0m,PART-L= H/O Mokles to college road-44.0m,PART-M=BC road to H/O Rimi-23.0m,PART-N=H/O Animesh to BC road-8.0m,PART-O=H/O Joynal to BC road-35.0m,PART-P= H/O Suri to H/O Aminur-40.0m, PART-Q=H/O Aslam to BC road-17.0m, Package No-02 Total Length-1169.0m In ward No-05 Under Bagherpara Pourashava,Jashore, ADP FY=2023-24
Contract Date11 Jul 2024
Contract AmountBDT 2.6 Million (USD 22.5 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
1. Improvement/Butification PART-A=BFS inside of Health Complex Parking Area, PART-B=BFS Infront of Mosque Bagherpara Health Complex and PART-A=Reparing of Tin Shade for Bagherpara Central Mondir at Mohiran Word No-08,PART-B= Soling Road From Atgram Moha Soshan road to Mustafiz House (Ch.0-30.0)m at Dohakhola Word No-04 , PART-C= Soling Road From Sashan BC Road to H/O Mohid (Ch.0-13) at Dohakhola Ward No-04, PART-D=H/O Humayun to H/O Billal(Ch.0-10) at Dohakhola,Package Total Road Length=53.0m In Ward No-04 Under bagherpara Pourashava, Jashore., ADP FY=2023-24
Contract Date10 Jul 2024
Contract AmountBDT 483 K (USD 4.1 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Improvement of road by BFS PART-A=H/O freedom fighter Mannan to H/O Journalist Iqbal (Ch.0-116) Total Length=116.0m at Dohakhola.In Ward No 04.and 2. Improvement of road by BFS PART-A=Near H/O Imran (Ch.0-57) at Mohiran in Ward No.9, PART-B=BC Road to H/O Abdur Salam (Ch.0-30.50) at Mohiran In Ward No. 07, PART-C=Near H/O Ashrafun Nahar(Ch.0-29) at Mohiran In Ward No. 07,( PART-D= Govt. Graveyard Road to H/O Ahad(Ch.0-44) at Mohiran In Ward No. 07, PART-E=Govt. Posu Hospital Road to H/O Shaheen(Ch.0-22) at Mohiran In Ward No. 07, PART-F=Construction of Brick Drain from H/O Rajul Haque to H/O Haque master (Ch.0-18.50)at Mohiran In Ward No-07, PART-G= Main BC Road to Mohiran Central Temple,(Ch.0-32) at Mohiran In Ward No-08, PART-H=Koraitala Main BC Road to H/O Amal,(Ch.0-19) at Mohiran In Word No-08, PART-I=Near H/O Moyen to H/O Togar,(Ch.0-63)at Koraitola In Ward No-08 , PART-J=Near H/O Mihir (Ch.0-18.5)at Mohiran In Ward No-07, PART-K=Govt.Grveyard Road to H/O Jahidul Islam (Ch.0-63) Total Length-396.0m at Mohiran Ward No-07, Under Bagherpara Pourashava, Jashore , ADP FY=2023-24
Contract Date10 Jul 2024
Contract AmountBDT 941.3 K (USD 8 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
Repair and Maintanance of Existing (120 Nos) Solar Street Light(Old) for Different Location Under Bagherpara Pourashava,Bagherpara Jashore, ADP FY=2023-24
Contract Date10 Jul 2024
Contract AmountBDT 1.5 Million (USD 12.9 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
PART-A=Construction of RCC Main Gate with Boundary wall for Bagherpara Govt. Graveyard at Ward No-07,PART-B= BFS Road From Boharampur Main BC Road to Land of EX.Mayor Abdul Hai Mona (Ch.0-72) Total Road Length=72.0m at Ward No-05 Under Bagherpara Pourashava, Jashore, , ADP FY=2023-24
Contract Date7 Jul 2024
Contract AmountBDT 1.2 Million (USD 10.4 K)

Bagherpara Paurashava Tender Result

Result Stage: Awarded  (AOC Available)
Bangladesh
(1) Maintenance work for Bagherpara Pourashava Office Compaund (Part-A) Bathroom Reparing works 04 Nos Common Toilet & Mayor Room Toilet,(Part-B) Reparing of Pipe Line for Toilet, (Part-C) Floor Tiles General Section,(Part-D) Scharting Work Building Roof,(Part-E) Supplying 03 Nos Waiting Chair,15 Nos Visitor Chair (Part-F) Tin Shade Track Gurage ,(Part-G)Parking Tiles For Motor Cycel Gurage (Part-H) 12 Nos Dustbin for Different Location of Pourashava Area.(Part-I) Butyfication of Pourashava area,(Part-J) 03 Nos Cover Slab Infront of Mojid Market Rcc Drain (Part-K) 2 Ton AC For Metting Room, (2)Improvement of road by BFS PART-A= From Raipur BC Road to H/O Dulal(Ch.0-40). In ward no-01 ,PART-B= From Raipur Mondir Road to H/O Tapos (Ch.0-74) at word no-01, PART-C= From Raipur Road to H/O Akbor (Ch.0-16) at word no-01,PART-D= From Mill Road to H/O Samad (Ch.0-68) at word no-02 ,PART A=From Mirpur Road to H/O Ashraf (Ch.0-12) at word No-03,PART-F=From Boharampur BC Road to H/O Soukot (Ch.0-57.0) at word No-05,PART-G=From Boharampur BC Road to H/O Torikul (Ch.0-28) at word No-05,PART-H= From Boharampur BC Road to H/O AZIM (Ch.0-40) at word No-05, PART-I= From Koraitola BC Road to H/O Nirmol (Ch.0 75) at word No-08,PART-J= From Koraitola BC Road to H/O Mostofa (Ch.0-24) at word No-08,PART-K= From Koraitola BC Road to H/O Shoriful (Ch.0-33) at word No-08,PART L=From Koraitola BC Road to H/O khadim (Ch.0-35) at word No-08,PART-M= From Sher Sha Road to H/O Johar Sorder (Ch.0-41) at word No-09,PART-N= From Mill Road to H/O Bliat (Ch.0-28) at word No-09,PART-O= Mill Road to H/O Ripon (Ch.0-41) at word No-09,PART-P=From H/O Bahauddin to H/O Asharaf (Ch.0-58) at word No-09,PART Q=Near H/O Rojibul to H/O Hakim (Reparing) (Ch.0-23(New) (Ch.23-36) Total Length=683.0m at word No-09 (3)PART-A=Installation 50 Nos Sallow Tubewell & PART-B= 50 Sets Ring with RCC Cover Slab for Different Location of Bagherpara Pourashava, Jashore, ADP FY=2023-24
Contract Date4 Jul 2024
Contract AmountBDT 3.2 Million (USD 28 K)