Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date22 Jan 2025
Contract AmountEUR 4.1 Million (USD 4.3 Million)
Execution works for the construction project for the security and communications facilities at the Bidebieta-Basauri Station.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date17 Jan 2025
Contract AmountEUR 18.2 K (USD 18.9 K)
Services for the "CE" verification of interoperability and the issuance of the corresponding certificates by Nobo of the "infrastructure", "energy" and "control-command and signaling on land" subsystems in the "new suburban train station at La Tenería (Pinto). Line 300 Madrid Chamartín - Clara Campoamor to Valencia- Estació del Nord

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date17 Jan 2025
Contract AmountEUR 26.1 K (USD 27.3 K)
Services for the "CE" verification of interoperability and the issuance of the corresponding certificates by NOBO for the "infrastructure", "energy" and "ground-based control-command and signalling" subsystems in the actions of "adaptation of line 102 Madrid Chamartín Clara Campoamor - Aranda fork, section: Colmenar-Soto del Real, for its inclusion in the Madrid commuter network".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date17 Jan 2025
Contract AmountEUR 82.6 K (USD 85.1 K)
Supply of two forklifts for the warehouses of Montcada i Reixac and Sant Vicenç de Calders.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 237.5 K (USD 244.6 K)
Preventive and corrective maintenance service for the railway traffic management simulator system

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 263.5 K (USD 271.2 K)
Drafting of the construction project and execution of works for the new installation of automatic protection at the class A2 level crossing located at kilometre point 94/807 of line 222 La Tour De Carol- Enveigt – Aigües fork in the municipality of Montesquiu (Barcelona).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 586.5 K (USD 613.5 K)
Services for pre-maintenance of the electrification of the Medina del Campo-Salamanca-Fuentes de Oñoro line. Section: Salamanca-Fuentes de Oñoro. Substations and associated autotransformation centres, remote control of energy and high voltage overhead lines.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 664.1 K (USD 689.7 K)
Infrastructure Improvement Action (AMI) "Project drafting and execution of works for the protection of trenches between pp.kk. 1/566 to 1/634 of line l-246 Castellbisbal Agujas Rubi - Mollet - Sant Fost section AG.19 Castellbisbal AG. Llobregat-AG. PK. 21/5, II”

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 665.8 K (USD 686.1 K)
Execution works for the project to replace and build fences between kilometre points 239/111 and 258/100 of line 522 Manzanares-Ciudad Real. Municipalities of Miguelturra and Almagro (Ciudad Real).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date16 Jan 2025
Contract AmountEUR 689.2 K (USD 709.5 K)
Execution works for the project to replace and build fences between kilometre points 258/100 and 259/492 of line 522 Manzanares-Ciudad Real. Municipality of Miguelturra (Ciudad Real).
61-70 of 1874 active Tender Results