Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Infrastructure Improvement Action (AMI): Adaptation of the trench between the pp.kk. 444/620 to 444/731. L/100 Madrid-Hendaye
Contract DateNA
Contract AmountEUR 597 (USD 629.18536)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Execution of the Works of the Project of Replacement and Execution of Enclosures between PP.KK. 17/987 and 19/400 of line 100 Madrid - Chamartín - Hendaye (track 2). Municipality of Las Rozas de Madrid (Madrid)
Contract DateNA
Contract AmountEUR 584 (USD 615.4845)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Drafting of project and execution of work: Replacement of lanes due to wear, in the Cheste-Xirivella section. L/ Utiel-Valencia
Contract DateNA
Contract AmountEUR 392 (USD 413.13342)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Restoration of robberies and vandalizations in the aerial contact line, section El Berrón-Laviana.-
Contract DateNA
Contract AmountEUR 96.44901 (USD 101.64875)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Action project in the LAC for the change of posts between the pk. 97/794 to 98/063 of the road, route Puente los Fierros-Campomanes.-
Contract DateNA
Contract AmountEUR 102 (USD 107.499)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Suministro y transporte de traviesas para la remodelación de la terminal ferroviaria de mercancias de Madrid – Vicálvaro. Fase I. Subfase 1b.
Contract DateNA
Contract AmountNA 

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Commissioning of remotes and protocol converters for electrification installations.
Contract DateNA
Contract AmountNA 

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Technical Assistance for the quality, quantitative and qualitative control of the execution works of the project for the suppression of the level crossings of km 5+224, 5+295 and 5+359 of the access branch to Puesro de Marín ( Pontevedra)
Contract DateNA
Contract AmountEUR 227 (USD 239.23798)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Execution of the works of the trench treatment and consolidation project located between the PP.KK. 18+243 to 18+450. Castellbisbal-Agujas Rubí-Mollet-Sant Fost line.
Contract DateNA
Contract AmountEUR 242 (USD 255.04666)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Under Evaluation
Spain
Action for the Improvement of the Infrastructure (AMI) "Drafting of the project and execution of the work for the protection with breakwater of the Sidamon Canal pp.kk. 201+000 to 201+500 of Line 220 Lleida-Manresa"
Contract DateNA
Contract AmountEUR 397 (USD 418.40298)
1951-1960 of 2250 active Tender Results