Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Third order against the Framework Agreement for the control of vegetation on the platform and margins and facilities of Adif's conventional and metric gauge lines 6 lots. Lot 5-Sub-directorate of Center Operations.
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.5 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the replacement project and execution of enclosures between pp.kk. 122/100 and 123/243 on the left bank of line 100 Madrid-Chamartín-Hendaye. Municipality of Avila
Contract DateNA
Contract AmountEUR 367.9 K (USD 388.7 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the construction project of acoustic protections resulting from the action plans against noise. Phases I and II. Area No. 1. Downtown area. Madrid and Castile-La Mancha
Contract DateNA
Contract AmountEUR 20.2 Million (USD 21.3 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Drafting of the construction project and execution of the works for the modification of the functionality of the automatic protection of the class A2 level crossing located at kilometer point 11/066 of line 440 Los Naranjos – Huelva fork, in the municipality of Valencina de la Concepción (Seville).
Contract DateNA
Contract AmountEUR 226.9 K (USD 239.1 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Drafting of the construction project and execution of the works of affections and improvement of the security installations as a result of the electrification of the Ronda – Algeciras line.
Contract DateNA
Contract AmountEUR 15 Million (USD 15.9 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution works of the construction project for priority actions to improve evacuation and ventilation conditions in the event of fire in the Getafe downtown underground commuter station (Madrid)
Contract DateNA
Contract AmountEUR 699 K (USD 736.7 K)
1901-1910 of 2250 active Tender Results