Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.7 Million (USD 3.9 Million)
Service to ensure reliability in the unloading, transportation and incident response to trains with materials for works in different areas of the conventional network

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.7 Million (USD 4 Million)
Execution of the works of the construction project to eliminate the level crossing at PK 197/178 of the RFIG 516 Mérida-Los Rosales line. Municipality of Villanueva del Río y Minas (Seville)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.7 Million (USD 3.9 Million)
Order No. 2 framework agreement for the supply and transportation of rail for new lines under construction in the area of Barcelona

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.7 Million (USD 3.9 Million)
Execution of the works of the track renewal project at the La Negrilla Logistics Center.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.7 Million (USD 4 Million)
Execution works of the construction project for the renewal of video surveillance, access control and anti-intrusion equipment on the Madrid-Valladolid section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.8 Million (USD 4 Million)
Supply and transport of sleepers for the standard gauge connection to the Mediterranean corridor of the Llagosta multimodal platform (Barcelona)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.8 Million (USD 4.1 Million)
Supply and transport of sleepers for the extension of sectional tracks up to a useful length of 750 m in stations on the Zaragoza-Tarragona section. Stations in Lleida: Juneda and Raimat / Selgua, Marcén- Poleñino and Almudévar. Stations in Caspe: Chiprana, Nonaspe and Flix / Fuente de Ebro and La Puebla de Híjar

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.8 Million (USD 4.1 Million)
Execution works of the construction project for the undergrounding of the metric gauge line in Torrelavega (Cantabria). Provisional detour.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.9 Million (USD 4.2 Million)
Drafting of the construction project and execution of the renovation works of the CTC Ourense system and adaptation of the CTC Noroeste

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 3.9 Million (USD 4.2 Million)
Fourth request against Framework Agreement for the control of vegetation on the platform and margins and facilities of Adif's Conventional and Metric Gauge lines 6 lots. lot 1 – Northwest Operations Subdirectorate.
1891-1900 of 2214 active Tender Results