Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Emergency of the works and services caused by the theft of the metal bridge over the ravine located at kilometer point 14+530 and damage to the drainage underpass located at kilometer point 14+958 of Line 504 Algodor - Villaluenga - Yuncler. Civil work.
Contract DateNA
Contract AmountEUR 1.1 Million (USD 1.2 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution works of the construction project, comprehensive replacement of bi-block sleepers with monoblocks in different sections of the Seville-Huelva line, kilometer point 26/345 to kilometer point 51/505.
Contract DateNA
Contract AmountEUR 1.1 Million (USD 1.2 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works of the "Construction project for the removal of the level crossing pk 269/775 of the Metric Gauge Network. San Esteban de Pravia-Oviedo Line. Municipality of Pravia (Asturias)”
Contract DateNA
Contract AmountEUR 1.1 Million (USD 1.2 Million)
1801-1810 of 2250 active Tender Results