Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 723.2 K (USD 782.1 K)
Technical Assistance Services for the control and surveillance of the execution works of the construction project for the elimination of the telephone blockade on the Ortigueira-Ribadeo section and new configuration of tracks and platforms in stations (Line 740).
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 730.7 K (USD 772.8 K)
Technical assistance services for the control and surveillance of the works of "Extension of the useful length of the track to 750 m from the Salteras Apartadero. Infrastructure, track and electrification, signaling and communications. Seville-Huelva Line
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 743 K (USD 813.7 K)
Action for infrastructure improvement (AMI) "Project drafting and execution of the work to replace bi-block RS sleepers with monoblock sleepers. Line 522. Manzanares – Ciudad Real. Section: Manzanares – Azuer. Kilometer points202+90 – 208+918 .
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 756.9 K (USD 814.9 K)
Action for the Improvement of Infrastructure (AMI) "Project drafting and execution of the work to replace RS bi-block sleepers with monoblock sleepers. Line 500. Planetarium Bif. - Valencia de Alcántara. Section: Erustes - Oropesa de Toleo.PP. KK.117+109 – 152+226”
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 765.5 K (USD 816.7 K)
Execution works of the treatment and consolidation project of the trench located between the PP.KK. 104+360 to 104+962 line La Tour de Carol-Enveigt (PK 50,707)/Puigcerdá - Aigües bifurcation. Vic - Ripoll section
1751-1760 of 2250 active Tender Results