Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 462.5 K (USD 475.1 K)
Project drafting and execution of works: Construction project for the improvement of the curved track geometry and adaptation of the superstructure, at the Utiel side of the Buñol station. l/ Utiel - Valencia
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 794.8 K (USD 840.7 K)
Execution works of the construction project for priority actions to improve evacuation and ventilation conditions in the event of fire at the Embajadores underground commuter train station - Madrid (Phase I)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 836.6 K (USD 875.1 K)
First order against Framework Agreement of the Contract annexed to 4.22/28520.0014 (Lot 4) Project for the treatment of the viaducts of the "Río Tajo" (pk 055+235) and the Cuesta Negra (pk 292+970) of the High Speed line 040 Madrid Chamartín-Clara Ampamor - Valencia Joaquín Sorolla
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 925 K (USD 978.4 K)
Infrastructure improvement action (AMI-04/2024 Pamplona Maintenance Area Headquarters): drafting of project and execution of works to repair the trench from kilometre point 188+485 to 189+010 on line 700, Bilbao Abando Indalecio Prieto – Casetas.
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 968.5 K (USD 1 Million)
Infrastructure Improvement Action (AMI): drafting of project and execution of slope treatment between kilometer points 468+600 and 471+560 of the Las Fraguas – Los Corrales de Buelna section, line 160.
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 1.2 Million (USD 1.3 Million)
Consulting and assistance contract for the control of the works for the execution of construction projects to improve the accessibility, evacuation and ventilation conditions in the event of fire at the Doce de Octubre and Puente Alcocer underground commuter train stations
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date5 Dec 2024
Contract AmountEUR 1.6 Million (USD 1.7 Million)
Technical assistance services for the control and monitoring of the construction project for the installation of a banalized automatic locking system on the Guadalajara – Ariza section