Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 101.4 K (USD 108.8 K)
Technical assistance for the quality, quantitative and qualitative control of the works of the project to remove the level crossing at kilometer point 202/459 of the Madrid–Chamartín - Hendaye line, municipal area of Medina del Campo (Valladolid).
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 102.7 K (USD 108.6 K)
Project for reforms in the overhead contact line motivated by the connection of the track renovation works between Berrón and Pola de Laviana with the renovations of the stations in Sotrondio and El Entrego and the burying of the Langr station
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 105 K (USD 113.9 K)
Emergency works and services caused by floods on July 7, 2023 in the municipality of Rincón de Soto. Section between kilometer point 14+100 to kilometer point 15+940. Intermodal line 700 Abando Indalecio Prieto-Cases. Technical assistance.
1441-1450 of 2250 active Tender Results