Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Works of execution of the projects of replacement and execution of enclosures in the scope of Subdirección de Operaciones RC Noreste. L200 - PK 612+400 - 614+800 (Roda de Berà - Tarragona)
Contract DateNA
Contract AmountEUR 1.2 Million (USD 1.3 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Drafting of the construction project and execution of the works for the renovation of the automatic protection of the class A3 level crossings located in the PP.KK. 631/562 and 631/895 of Line 780 Santander - Bilbao La Concordia in the municipality of Ges (Bizkaia) and for the renovation and improvement of the automatic protection of the concatenated level crossings located at PP.KK 0/914 and 1/194 of line 790 La Asunción University - Aranguren in the municipality of Zalla (Bizkaia).
Contract DateNA
Contract AmountEUR 1.2 Million (USD 1.3 Million)
1431-1440 of 1874 active Tender Results