Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 375.1 K (USD 395 K)
Technical assistance for the control of the works of the remote control project for catenary disconnectors. Narrow gauge network in Cantabria.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 480 K (USD 525 K)
Execution of works for: "Project to repair the underpass in Perlora (Arroyo de Reguera), at PK 39/378 of line 750 Pravia - Gijón Sanz Crespo, Candás - Perlora section (Asturias)".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 498.9 K (USD 538.4 K)
ution of works for the project to replace and execute enclosures between kilometre points 10/837 and 11/814 of line 910 Madrid- Atocha Cercanías to Pinar de las Rozas in the municipality of Madrid, and between kilometre points 4/532 and 4/842 of line 110 Segovia to Villalba de Guadarrama in the municipality of Alpedrete (Madrid).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 800 K (USD 875 K)
Supply of poles for overhead contact line of the general interest railway network

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 1 Million (USD 1.1 Million)
Infrastructure improvement action (AMI 07/2024 Pamplona Maintenance Area Headquarters): "drafting of project and execution of mechanized stripping work between kilometer points 194+715 and 199+100. Line 700 Bilbao Abando Inal

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Oct 2024
Contract AmountEUR 1.8 Million (USD 1.9 Million)
Supply and transport of sleepers for the complementary works on the Sagunto – bif. Teruel line

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Oct 2024
Contract AmountEUR 57.5 K (USD 62.8 K)
Acquisition of 2 forklifts for the multipurpose warehouse of the Córdoba Maintenance Area Headquarters, located in the El Higuerón railway complex

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Oct 2024
Contract AmountEUR 69 K (USD 75.5 K)
Technical assistance for the control and monitoring of the works of: "Project to repair the underpass in Perlora (Arroyo de Reguera), at PK 39/378 of line 750 Pravia - Gijón Sanz Crespo, section Candás - Perlora (Asturias)".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Oct 2024
Contract AmountEUR 347.2 K (USD 378 K)
Project drafting and execution of works to replace biblock sleepers with monoblock sleepers on line 120 Vilar Formoso - Medina del Campo, section: El Campillo -El Carpio pp.kk. 12/947 - 15/654.-

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date12 Oct 2024
Contract AmountEUR 1 K (USD 1.1 K)
Carrying out hygienic measurements of asbestos in the premises of Adif and Adif-AV.
131-140 of 1664 active Tender Results