Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date15 Oct 2024
Contract AmountEUR 498.9 K (USD 538.4 K)
ution of works for the project to replace and execute enclosures between kilometre points 10/837 and 11/814 of line 910 Madrid- Atocha Cercanías to Pinar de las Rozas in the municipality of Madrid, and between kilometre points 4/532 and 4/842 of line 110 Segovia to Villalba de Guadarrama in the municipality of Alpedrete (Madrid).
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date15 Oct 2024
Contract AmountEUR 1 Million (USD 1.1 Million)
Infrastructure improvement action (AMI 07/2024 Pamplona Maintenance Area Headquarters): "drafting of project and execution of mechanized stripping work between kilometer points 194+715 and 199+100. Line 700 Bilbao Abando Inal
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date14 Oct 2024
Contract AmountEUR 69 K (USD 75.5 K)
Technical assistance for the control and monitoring of the works of: "Project to repair the underpass in Perlora (Arroyo de Reguera), at PK 39/378 of line 750 Pravia - Gijón Sanz Crespo, section Candás - Perlora (Asturias)".
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract Date13 Oct 2024
Contract AmountEUR 347.2 K (USD 378 K)
Project drafting and execution of works to replace biblock sleepers with monoblock sleepers on line 120 Vilar Formoso - Medina del Campo, section: El Campillo -El Carpio pp.kk. 12/947 - 15/654.-
131-140 of 1664 active Tender Results