Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Emergency for track repair works and services and hillside consolidation due to rockfall that derailed Alvia 623 train at kilometer 340+000 on August 26, 2022. San Clodio Quiroga-Freixeiro section, line 800 León-A Shit. Technical assistance.
Contract DateNA
Contract AmountEUR 46.7 K (USD 49.2 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Services for carrying out the «CE» verification of interoperability and the issuance of the corresponding Certificates by NoBo of the "Infrastructure", "Energy" and "Control, Command and Signaling on the ground" subsystems in the actions derived from the "Duplication of track between the stations of Parets del Vallés and La Garriga (Barcelona), Line 222, La Tour de Carol-Enveigt – Bif. Aigües".
Contract DateNA
Contract AmountEUR 46.7 K (USD 49.4 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
«CE» verification of interoperability and the issuance of the Certificates by NoBo of the subsystems "Infrastructure", "Energy" and "Control, Command and Ground Signal" in the actions derived from the "Electrif a 3 kVentr Guillarei - Tui and change of 3 kV to 25 kV between Ourense and Vigo. Rational rehabilitation and adaptation of the rest of the route elements to the new operating conditions. Lines 810, 812, 814 and 816".
Contract DateNA
Contract AmountEUR 48.4 K (USD 51 K)
1361-1370 of 2250 active Tender Results