Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Oct 2024
Contract AmountEUR 2.6 Million (USD 2.9 Million)
Works on the implementation project to improve accessibility at Redondela station.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Oct 2024
Contract AmountEUR 3.5 Million (USD 3.8 Million)
Execution of works for the construction project "Impacts on security and communications facilities in the construction of a 750 m parking lot at Escacena station (Huelva)".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Oct 2024
Contract AmountEUR 3.7 Million (USD 4 Million)
First order against the Framework Agreement for vegetation control on conventional and narrow gauge lines of the General Interest Railway Network (RIFG). 6 lots. Lot 6 – Southern Operations Subdirectorate.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Oct 2024
Contract AmountRefer Documents 
Lot 2: Comprehensive maintenance service for stations in divisions 24 and 30 of the Northwest Stations Subdirectorate. Area León

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date23 Oct 2024
Contract AmountRefer Documents 
Lot 1: Comprehensive maintenance service for stations in divisions 24 and 30 of the Northwest Stations Subdirectorate. Scope Galicia

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date22 Oct 2024
Contract AmountEUR 46.8 K (USD 51 K)
Order No. 5 against the Framework Agreement for functional adaptations at level crossings resulting from changes in the operation of the lines of the General Interest Railway Network (RFIG) for the installation of a protection repeater signal at the level crossing located at km 199/132 of line 516, in the municipality of Villanueva del Río y Minas (Seville)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date22 Oct 2024
Contract AmountEUR 1.8 Million (USD 2 Million)
Technical assistance services for the control and monitoring of the construction project for the adaptation of the banalized automatic lock on the Herrera de la Mancha – Manzanares section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date21 Oct 2024
Contract AmountEUR 6.6 K (USD 6.9 K)
Pest control service in the building located at 1 Méndez Álvaro Street in Madrid.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date21 Oct 2024
Contract AmountEUR 109 K (USD 118.6 K)
Technical assistance for the quality, quantitative and qualitative control of the works of the construction project for the elimination of level crossings of PP.KK 522/700 and 523/088 of the Santander-Llanes (RAM) line. Municipality of Santa Cruz de Bezana (Cantabria).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date17 Oct 2024
Contract AmountEUR 322.9 K (USD 349.6 K)
Infrastructure Improvement Action (AMI) "Project drafting and execution of the work to replace wooden sleepers and rails on the metal bridge over the Torote River on line 200 Madrid-Barcelona, in the section between PP.KK. 28+260 - 28+450
101-110 of 1648 active Tender Results