Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 1.6 Million (USD 1.7 Million)
Supply of track devices for the replacement of type "A" switches and renewal of track material at the Pizarra and Aljaima stations

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 1.6 Million (USD 1.7 Million)
Services for the drafting of the construction project for the doubling of the Sotiello-La Florida section of lines c-5/c7 of the Asturias commuter rail network. Track and electrification.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 2.1 Million (USD 2.2 Million)
Execution of the works of the construction projects for the elimination of the level crossings at PK 42/743 and pk 45/245 on the Monforte de Lemos - Vigo line. TM Orense

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 3.1 Million (USD 3.2 Million)
Execution of works for the construction projects for the elimination of level crossings at PPKK 386/169, 386/644, 386/975, 387/316 and 388/492 on Line 800 León – A Coruña. Municipal District of Sarria (Lugo).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 51.4 K (USD 53.3 K)
Second Request against Framework Agreement for the pest control service in ADIF premises and spaces within the scope of the Central Circulation Subdirectorate

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 761 K (USD 788.8 K)
Services for the transfer and adaptation of the Córdoba Central Traffic Control (CTC) equipment to adapt the Córdoba Traffic Regulation Centre.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 5.1 Million (USD 5.4 Million)
Second request against the Framework Agreement for vegetation control on conventional and narrow gauge lines of the General Interest Railway Network (RFIG). 6 lots. Lot 6 – Southern Operations Subdirectorate.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 5.2 Million (USD 5.3 Million)
Execution of works for the construction project to remove level crossings at PP.KK. 376/350 and 376/537 on the Venta de Baños to Santander Line, in the municipality of Alar del Rey (Palencia).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 6.9 Million (USD 7.2 Million)
Execution of works corresponding to the "Project to build an extension of the siding to 750 metres of useful length at the stations of Arcos de Jalón (Soria) and Sigüenza (Guadalajara)".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 8.3 Million (USD 8.6 Million)
Second request against the Framework Agreement for vegetation control on conventional and narrow gauge lines of the General Interest Railway Network (RFIG). 6 lots. Lot 2. Northern Operations Subdirectorate.
101-110 of 1875 active Tender Results