Inter University Accelerator Centre Tender
... More
If you're typing tender ID over and again or finding it difficult to go through the cumbersome government websites for looking at Delhi tenders online. We have come up with a solution i.e. we have collated every eprocurement Delhi tender on BidAssist. Also, for any queries related to an e-tender Delhi, like the bidding process, registration process, etc., the same are explained below.
Costs
EMD
₹ 1,06,000Document Cost
₹ 10Tender Fee
Refer Documents
Summary
Sitc Of Air Dehumidifier Cum Air Handling Unit (air Conditioning Dehumidifier) Of Capacity Of 11250 Cmh At Iuac
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IUAC_774911_1Bid Award Id
ViewTender No
IUAC/NIT/11/BKG/23-24Tender Authority
Inter University Accelerator Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
SITC of Air Dehumidifier cum Air Handling Unit Air Conditioning Dehumidifier of Capacity of 11250 CMH at IUAC
BOQ Items
... More
SCR power supply for heaters
1
-
-
... More
Spare desiccant rotor assembly
1
-
-
... More
Spare desiccant rotor motor
1
-
-
... More
Design, supply, shifting site assembly, installation, testing and commissioning of floor mounted horizontal type Dehumidifier unit cum Air Handling Unit (Air Conditioning Dehumidifier) standard working unit complete with 43 mm thick, double skin type panels, industrial type solid metal silicate desiccant rotor bed desiccant synthesized on fluted type honeycomb rotor media, bed drive & motor, reactivation electric heaters 100 % with thriristor, supply & Return air damper, fresh air damper, Mixing section, pre filter section wih (EU-4) filter, Process blower with drive and motor, Supply air damper, reactivation blower with motor, filter for Reactivation air from service area, Reactivation outlet damper, Electrical panel assembly with necessary controls and instruments, Cabling & earthing for dehumidifier unit, with pre and post cooling coil (4/6 rd) .
The Power & control panel shall be factory pre wired for the system operation and shall be supplied with MCBs/MCCBs, contactors, overload protection, microprocessor controller for temperature & RH and all the necessary components to ensure a continuous automatic operation of units. The control panel shall be complete with microprocessor base, provision for Mod bus connectivity to BMS for data exchange etc. Dehumidifier Digital Controller which shall have a mimic diagram of the functioning of the unit and shall have a full diagnostics facility of faults and/or alarms. All necessary power and control cabling of dehumidifier unit shall be provided by Dehumidifier supplier.
Rotor Diameter x depth (mm) -1200x300, rotor air flow rate (cfm)-4500 cfm, moisture removal rate ( kg/hr)-41, reactivation air fan capacity (cfm)-1600 cfm, process air fan capacity (cfm)-6100, pre / post cooling coil capacity (Ton)-4/23.
As per technical specifications of NIT.
1
-
-
... More
Spare Temperature sensor
1
-
-
... More
Spare RH Sensor
1
-
-
... More
Spare VFD unit desiccant rotor motor
1
-
-
... More
Spare VFD unit for process blower motor
1
-
-
... More
Display Unit
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements