Inter University Accelerator Centre Tender
... More
The IUAC has issued a formal invitation for competitive bids for the Inter University Accelerator Centre project, for Supply Installation Testing And Commissioning Of 3x300 Kva 3 Phase Double Conversion On Line Ups Systems In Parallel Along With Post Warranty Camc For Period Of 10 Years in South Delhi, Delhi, with an estimated contract value of Rs. 1,40,00,000. The bid opening date for this tender is 14-02-2025 and the last date for bid submission is 06-03-2025. Interested bidders for Inter University Accelerator Centre tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Inter University Accelerator Centre - IUAC Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date14 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 1,40,00,000
Costs
EMD
₹ 2,80,000Document Cost
₹ 10Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IUAC_849119_1Bid Award Id
ViewTender No
IUAC/NIT/18/GS/2024-25Tender Authority
Inter University Accelerator Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply installation testing and commissioning of 3X300 kVA 3 phase double conversion on line UPS systems in parallel along with post warranty CAMC for period of 10 years
BOQ Items
... More
CREDIT FOR BUY BACK OF 300 kVA UPS systems Buy Back Value Ex- Works Price (IUAC Site)
-
-
-
... More
Credit for buy back of 300 kVA, MPS-300 SINUS-P AROS UPS bearing P/N 6FSMPTM30D01 on as is where is basis
1
-
-
... More
Comprehensive AMC charges* for 1st year after warranty period
3
-
-
... More
Comprehensive CAMC Charges* for 3x300 kVA UPS system (without batteries)
-
-
-
... More
Comprehensive AMC charges* for 5th year after warranty period
3
-
-
... More
TOTAL COST -A
-
-
-
... More
TOTAL Buy Back COST (CREDIT TO IUAC)-B
-
-
-
... More
Comprehensive AMC charges* for 9th year after warranty period
3
-
-
... More
Credit for buy back of 300 kVA, MHT-300 P RIELLO UPS bearing P/N FMHTM30ANBP0 on as is where is basis
1
-
-
... More
Credit for buy back of 300 kVA, MPS-300 SINUS-P AROS UPS bearing P/N 6FSMPTM30D01 on as is where is basis
1
-
-
... More
FINAL EVALUATED COST (A-B+C)
-
-
-
... More
Comprehensive AMC charges* for 6th year after warranty period
3
-
-
... More
SITC of 3x300 kVA UPS Systems and batteries
-
-
-
... More
Comprehensive AMC charges* for 8th year after warranty period
3
-
-
... More
Credit for buy back of 120 AH, 12 Volt, SMF batteries of AMARON make on as is where is basis.
252
-
-
... More
Comprehensive AMC charges* for 3rd year after warranty period
3
-
-
... More
Supply, Installation, testing and commissioning of suitable size battery banks for 300 kVA/300 kW UPS systems for 10 minutes backup at full load consisting of SMF batteries, MS painted battery stands, suitable battery breaker MCCB’s with enclosures, interconnecting UNINYVIN cable links for batteries in the bank including the cable links required from battery breaker to UPS.
3
-
-
... More
Credit for buy back of old MS battery stand (3 Nos.), all interconnecting links, battery breaker with MS enclosure (3 Nos.) etc. on as is where is basis.
1
-
-
... More
Comprehensive AMC charges* for 10th year after warranty period
3
-
-
... More
Comprehensive AMC charges* for 4th year after warranty period
3
-
-
... More
Supply, Installation, testing and commissioning of 300 kVA/300 kW capacity UPS in parallel load sharing N+1 configuration as per specifications & scope of work as required.
3
-
-