Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of R.c.c. Culvert At Amratbhai Lallubhai Patel House In Patlara Gram Panchayat, Moti Daman.(2nd Call) in Daman, Daman & Diu. The bid opening date for this tender is 31-12-2024 and the last date for bid submission is 13-01-2025. Interested bidders for Public Works Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date31 Dec 2024
Closing Date13 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 27,845Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DAMAN_3930_1Bid Award Id
ViewTender No
21/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://ddtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in Foundations, footings, Base of columns and Mass concrete.
23.22
-
-
... More
Providing formwork with steel sheet so as to give a fair finish ordinary timber planking so as to give a rough finish including cantering shuttering strutting and propping etc. Height of propping and cantering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. Flat surfaces such as soffits of suspended floor roof slabs Landings and the like. Floors etc. above 200mm in thickness.
21.3
-
-
... More
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering.
41.76
-
-
... More
Excavation for foundation upto 1.5 mt depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead. (d)Soft rock not requiring blast
41.76
-
-
... More
Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in Walls, from top of foundation level upto floor two level (upto 10 ton)
57.53
-
-
... More
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6- crushed stone aggregates 20 mm nominal size) and curing complete including cost of formwork in Wall Caps / Coping
3.86
-
-
... More
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level
10128
-
-
... More
Items :
-
-
-
... More
Filling in foundation & plinth with rubble in layers of 20cm. thickness incl. watering ramming & consolidating etc. comp.
5.92
-
-
... More
Providing formwork with steel sheet so as to give a fair finish including cantering shuttering strutting and propping etc. height of propping and cantering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. Vertical surface such as walls (any thickness) partitions and the like including attached buttresses & string course & the like. (upto 10 ton)
149.31
-
-