The Municipal Council has issued a formal invitation for competitive bids for Repairing Retrofitting And Strengthening Of Modern School At Nani Daman. 1st Call in Daman, Daman & Diu, with an estimated contract value of Rs. 69,90,143. The bid opening date for this tender is 01-07-2024 and the last date for bid submission is 11-07-2024. Interested bidders for Municipal Council tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Council Tender
Civil And Construction
Building Construction
Eprocure
Opening Date1 Jul 2024
Closing Date11 Jul 2024
Tender Amount₹ 69,90,143
Costs
EMD
₹ 1,39,803Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DAMAN_3566_1Tender No
01/2024-25/DMCTender Authority
Municipal Council ViewPurchaser Address
-Website
http://ddtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Rebar/ Anchoring System: Anchoring of 16mm dia. bar in RCC elements by drilling holes of 20mm diameter and fixing with "Fischer FISV 360 S" of Fischer company including tools and tackle. (steel quoted separately)embedment 160mm, complete as directed.
210
-
-
... More
Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar..
21
-
-
... More
Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular +Extra for brick work in superstructure above plinth level upto+Extra for brick work in superstructure above floor two level Item No. 1(6.12) (A) Modular
21
-
-
... More
Rebar/ Anchoring System: Anchoring of 12mm dia. bar in RCC elements by drilling holes of 14mm diameter and fixing with "Fischer FISV 360 S" of Fischer company including tools and tackle. (steel quoted separately)embedment 120mm, complete as directed.
120
-
-
... More
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas and disposal of unserviceable materials
119
-
-
... More
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level.
8020
-
-
... More
Providing 20 mm thick double coat mala cement plaster on interior brick / concrete work for plastering comprising of base coat of 12 mm thick cement plaster in cement mortar (1 Cement : 4 coarse sand) in rough finishing and 8 mm thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse sand) finished with trovel including scaffolding curing etc. complete.+Extra over items 58 to 64 for finishing with a floating coat of neat cement slurry.
1913
-
-
... More
Rebar/ Anchoring System: Anchoring of 10mm dia. bar in RCC elements by drilling holes of 12mm diameter and fixing with "Fischer FISV 360 S" of Fischer company including tools and tackle. (steel quoted separately)embedment 100 mm, complete as directed.
125
-
-
... More
For Jacketing of Column /Footing :
Providing and applying footing new concrete in M25 grade, with 125 gms 12mm long P.P fiber with super plasticizer including necessary TMT steel reinforcement with Epoxy Zinc Rich primer coating, ISI approved make including shuttering, labour and materialcost as directed by engineer in charge.
13
-
-
... More
Scaffolding:
approved double legged for height uo to 25 mt including all scaffolding material with all safty measures as per IS codes and regulations, with fastening and fitting material and labour cost,
1876
-
-
... More
Works
-
-
-
... More
Cement Injection grouting :
Step 1- Drill the Ports on the Surface
Drill the holes or ports in the cracks at a regular interval. The distance between the two ports depends upon the types of cracks. The minimum diameter and depth of ports are 2.5cm and 5cm, respectively. For fine cracks, the distance between two ports ranges from 150 mm to 200 mm and the distance between ports in major cracks ranges between 300-400 mm. The spacing of ports is usually kept greater than the desired depth of grout penetration. Step 2- Seal Cracks Between Ports
The crack between the ports should be filled with epoxy, polyester or cementitious materials. Give time to the seal to be hardened. If cracks pass through the structure, such as a wall, the surface seals and ports are applied on both sides.
Step 3- Clean Ports and Cracks
Before starting grouting it is very important to clean and flush the cracks and holes properly. This can be done manually with clean water by using a vacuum to clean the cracks. The cracks should besprinkle with water. It is very essential to clean it properly to establish a strong bond. Double-check the surface sealing and port system. Step 4- Grouting the Hose Connection
For smaller grout pressure up to 350 kPa, a hand-held, cone-shaped fitting on the grout hose is sufficient. For larger grout pressures, short pipe nipples are connected into the holes to obtain grout hose connections. Fix the nipple or pipe in the holes and seal it with adhesive around such that it cannot move from its place.
Step 5- Injection Grouting on the cracks Inject the grout material in the crack with the Grouting machine. It should be filled with pressure. Injection grouting required skilled labour. Consider the temperature on the site while processing. complete including shuttering , material and labour charges complete as directed. (M.R.)
155
-
-
... More
Rebar/ Anchoring System: Anchoring of 8mm dia. bar in RCC elements by drilling holes of 10mm diameter and fixing with "Fischer FISV 360 S" of Fischer company including tools and tackle. (steel quoted separately) embedment 80mm, complete as directed.
350
-
-
... More
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
9
-
-
... More
Concrete repair by polymer treatment
Dismentling of all loose plaster and concrete to open sound concrete ,steel and structural cracks along with required supports etc..Incase of more damaged steel, rebaring of required sized new steel binding the new steel with old steel with bindingwire Clean the old R.C.C. & STEEL surface by wire brushing then apply RUST REMOVER ON STEEL & than Apply bound coat of SBR and instant apply polymor motar up to the level of old concrete. ( SBR - DR.FIXIT/ASIAN PAINT) ( POLYMER MORTAR - DR.FIXIT POLYMER MORTAR HB )Apply bound coat of cement slurry along with MAPEI PLANICRETE (SBR)
385
-
-
... More
Epoxy based Injection grouting :
Step 1- Drill the Ports on the Surface
Drill the holes or ports in the cracks at a regular interval. The distance between the two ports depends upon the types of cracks. The minimum diameter and depth of ports are 2.5cm and 5cm, respectively. For fine cracks, the distance between two ports ranges from 150 mm to 200 mm and the distance between ports in major cracks ranges between 300-400 mm. The spacing of ports is usually kept greater than the desired depth of grout penetration.
Step 2- Seal Cracks Between Ports
The crack between the ports should be filled with epoxy, polyester or cementitious materials. Give time to the seal to be hardened. If cracks pass through the structure, such as a wall, the surface seals and ports are applied on both sides.
Step 3- Clean Ports and Cracks
Before starting grouting it is very important to clean and flush the cracks and holes properly. This can be done manually with clean water by using a vacuum to clean the cracks. The cracks should besprinkle with water. It is very essential to clean it properly to establish a strong bond. Double-check the surface sealing and port system. Step 4- Grouting the Hose Connection
For smaller grout pressure up to 350 kPa, a hand-held, cone-shaped fitting on the grout hose is sufficient. For larger grout pressures, short pipe nipples are connected into the holes to obtain grout hose connections. Fix the nipple or pipe in the holes and seal it with adhesive around such that it cannot move from its place.
Step 5- Injection Grouting on the cracks
Inject the grout material in the crack with the Grouting machine. It should be filled with pressure. Injection grouting required skilled labour. Consider the temperature on the site while processing.
75
-
-
... More
Removing and scraping of old deteriorated plaster of any thickness fromm wall / R.C.C member including stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift
1913
-
-
... More
Providing and Fixing ISI approved Chicken mesh polymer based high strength net for joints at Columns and Beams and Masonary works at any height , including cutting ,fixing in position with required fixing materials, including material and labour as directed by Engineer In charge.
415
-
-
... More
Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work
15
-
-
... More
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or half brick walls for interior plastering upto floor two level and finished even and smooth in (i) Cement mortar 1:3 (1-cement:3-sand) + Extra over items 58 to 64 for finishing with a floating coat of neat cement slurry.
851
-
-
... More
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
112
-
-