UT Administration Of Dadra And Nagar Haveli Tender
... More
The UT Administration Of Dadra And Nagar Haveli has issued a formal invitation for competitive bids for Construction Of Rcc Gutter At Rakholi Kakvapada (d.p.o.). (2nd Call) in Dadra & Nagar Haveli, with an estimated contract value of Rs. 42,21,606. The bid opening date for this tender is 10-10-2018 and the last date for bid submission is 22-10-2018. Interested bidders for UT Administration Of Dadra And Nagar Haveli tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
UT Administration Of Dadra And Nagar Haveli Tender
Opening Date10 Oct 2018
Closing Date22 Oct 2018
Tender Amount₹ 42,21,606
Costs
EMD
₹ 84,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UTDNH_3233_1Tender No
E TENDER NOTICE NUMBER 22 OF 2018-2019Tender Authority
UT Administration Of Dadra And Nagar Haveli ViewPurchaser Address
-Website
http://https://daman.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundation, footings, Base of columns and Mass concrete (more than 10 ton).
82.11
-
-
... More
Providing formwork of ordinary timber planking so as to give a rough finishing including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4M and removal of the same for in situ reinforce concrete and plain concrete work in (Q) vertical fins and vertical breakers (more than 10 ton).
1904
-
-
... More
Excavation for foundation upto 1.50m depth including sorting out and stacking useful materials and disposing off the excavated stuff upto 50 meter lead (A) loose or soft soil.
928.8
-
-
... More
Disposal of excavated stuff including loading, unloading etc. up to 3.00 KM lead.
764.58
-
-
... More
Providing and laying controlled cement concrete M.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (K) Vertical and horizontal fins upto floor to level (more than 10 ton).
190.4
-
-
... More
Providing and laying controlled cement concrete M.200 and curing complete including cost of formwork and excluding cost of reinforcement for reinforcement for reinforced concrete work in (C) Slabs (more than 10 ton).
95.2
-
-
... More
Filling availble excavated earth (excluding rock) in trenches plinth side of foundation etc. in layer not exceeding 20cm in depth consolidation each deposited layer by ramming and watering.
164.22
-
-
... More
Providing TMT bar FE 415 reinforcement for RCC work including bending binding and placing in position complete upto floor two level (upto 10 ton).
36771
-
-
... More
Supply and fixing reinforced concrete heavy duty non-pressure pipes with collars for culverts including setting and joining the pipes in CM 1:2 watering and laying (to level or slope) of IS class Np3 of following internal diameter (iii) 600mm dia (more than 10 ton).
10
-
-
... More
Providing and laying cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 20mm nominal size) and curing complete including cost of formwork in [A] Foundation and Plinth (more than 10 ton).
123.76
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements