South Eastern Coalfields Limited Tender
... More
The SECL has issued a formal invitation for competitive bids for the South Eastern Coalfields Limited project, for Construction Of 95 Nos Ventilation Stoppings In A 21 Nos In Sump Area In Seam No.v B 16 Nos In 30n 45e Dev Panel In Seam No.-v C 04 Nos In 58e 15s Dev Panel In Seam No. Iv D 35 Nos In 63e 15s Dev Panel In Seam No.iv And E 19 Nos In 75w 15s in Koriya, Chhattisgarh, with an estimated contract value of Rs. 53,48,587. The bid opening date for this tender is 19-03-2025 and the last date for bid submission is 09-04-2025. Interested bidders for South Eastern Coalfields Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
South Eastern Coalfields Limited - SECL Tender
Opening Date19 Mar 2025
Closing Date9 Apr 2025
Tender Amount₹ 53,48,587
Costs
EMD
₹ 66,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of 95 Nos Ventilation Stoppings In A 21 Nos In Sump Area In Seam No.v B 16 Nos In 30n 45e Dev Panel In Seam No.-v C 04 Nos In 58e 15s Dev Panel In Seam No. Iv D 35 Nos In 63e 15s Dev Panel In Seam No.iv And E 19 Nos In 75w 15s
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SECL_332932_1Tender No
24-25/Kurasia/R-30/46 Date 19.03.2025Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Mulma cleaning / removal of debris from underground galleries, disposal with in 50 mtrs. (Item No. 1 of GMSOR 2019 updated as on 01.10.2024)
44.65
737
32926.25
... More
12mm thick cement plaster with cement mortar 1:6 (1 cement : 6 Fine sand) including loading unloading the materials into mine car/tub and carriage of materials by manual labours for a lead of 50mtrs both at surface and underground.(Item No. 16 of GMSOR 2016).
2723.65
266
724490.9
... More
Brick work using bricks of class designation 35m in superstructure with cement mortar 1:6 (1 Cement : 6 Fine Sand) including loading unloading the materials into mine car/tub and carriage of material by manual labour for a lead of 50m both of surface and underground.(Item No. 10 of GMSOR 2016).
429.99
6146
2642881.94
... More
Excavation in coal/shale/stone for grip cutting in side/top/bottom of gallery by using pick axes/chiseling of exposed surface removal of estimated of coal/ shale & stacking seperately serviceable & unseviceable material with in a distance of 50 mtrs. For Soft Stone (Item No. 2(b) of GMSOR 2019 updated as on 01.10.2024).
52.87
5372
284055.18
... More
Brick work using brick of class designation 35m in foundation and plinth with cement mortar 1:6 (1 Cement:6 fine sand) including loading unloading the materials into mine car/tub and carriage of material by manual labour for a lead of 50m both of surface and underground .(Item No. 09 of GMSOR 2016).
160.36
4739
760023.01
... More
Extra for tub pusing for every 50 mtrs in underground where haulage is not provided (06 lead) For sand (Rate for 1M3 sand = 3.48, for 06 lead = 6*3.48=20.88/m3) (Item No. 25(b) of GMSOR 2016).
191.84
20
4005.62
... More
Excavation in coal/shale/stone for grip cutting in side/top/bottom of gallery by using pick axes/chiseling of exposed surface removal of estimated of coal/ shale & stacking seperately serviceable & unseviceable material with in a distance of 50 mtrs. For Coal/Shale. (Item No. 2(d) of GMSOR 2019 updated as on 01.10.2024).
60.85
1308
79600.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements