South Eastern Coalfields Limited Tender

... More
The SECL has issued a formal invitation for competitive bids for the South Eastern Coalfields Limited project, for Strengthening And Improvement Of Existing Wbm Approach Road (parking Area) Including Construction Of Parapet Wall Along State Highway At Jagannathpur Ocp Under Bhatgaon Area. in Surajpur, Chhattisgarh, with an estimated contract value of Rs. 1,71,81,247. The bid opening date for this tender is 14-11-2026 and the last date for bid submission is 30-11-2026. Interested bidders for South Eastern Coalfields Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

South Eastern Coalfields Limited - SECL Tender - CG Tender

Opening Date14 Nov 2026
Closing Date30 Nov 2026
Tender Amount₹ 1,71,81,247 
Notes
Download

Costs

Description

Strengthening And Improvement Of Existing Wbm Approach Road (parking Area) Including Construction Of Parapet Wall Along State Highway At Jagannathpur Ocp Under Bhatgaon Area.

AI Insights

Unlock AI Insights for this Tender

Sign in to request AI-powered insights, eligibility criteria and automated analysis for this tender.

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Cement Concrete Pavement M-30 Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 53 grade cement @ 350 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing

1567.5

4470

7007822.25

... More
Dowel and tie bars: Add extra above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. Dowel Bars- Mild Steel

14.11

72573

1024005.03

... More
Dowel and tie bars: Add extra above for the cost of steel in dowel bar and tie rod including craddle, laps etc. complete required as per design. Tie Bars- Tor Steel

1.74

74857

130252.05

... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out

225.72

188

42435.36

... More
Supplying and filling in plinth with Local sand under floors, including watering, ramming, consolidating and dressing complete.

37.62

1165

43827.3

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).

37.62

5240

197128.8

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

111.765

6693

748043.15

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bar.

6705.9

105

704119.5

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.

251.24999999999997

280

70350

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

396.15

580

229767

... More
6 mm cement plaster of mix 1:3 (1 cement:3 fine sand)

163.8

206

33742.8

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

18.81

125

2351.25

... More
Painting Two Coats on New Concrete Surfaces:- Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)

151.2

99

14968.8

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.