NMDC Limited Tender

... More
The NMDC has issued a formal invitation for competitive bids for the NMDC Limited project, for Biom/bc/contracts/ote(86) /24-25/civil/c-375 in Dantewada, Chhattisgarh, with an estimated contract value of Rs. 50,12,900. The bid opening date for this tender is 10-06-2024 and the last date for bid submission is 11-07-2024. Interested bidders for NMDC Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

NMDC Limited - NMDC Tender

Opening Date10 Jun 2024
Closing Date11 Jul 2024
Tender Amount₹ 50,12,900 
Notes
Download

Costs

Summary

Biom/bc/contracts/ote(86) /24-25/civil/c-375

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:

-

-

-

... More
Pesticide will be provided by the Department & lawn mover and brush

-

-

-

... More
All kinds of soil.

345

-

-

... More
good earth to be paid separately).

-

-

-

... More
Mixing earth and sludge or manure in the required proportion specified or

2819

-

-

... More
supplying stacking-including laying in position in foundation as directed by engineering incharge

-

-

-

... More
20% for payment).

-

-

-

... More
supplying stacking-including laying in position in foundation as directed by engineering incharge

-

-

-

... More
contractor.) and as per direction of officer in charge.

-

-

-

... More
T’ or ‘L’ iron or pipe

113

-

-

... More
stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds,

-

-

-

... More
payment).

-

-

-

... More
and brush cutter, removal of garden waste, applying insecticide, pesticide

-

-

-

... More
63 mm to 45 mm size stone aggregate.

66

-

-

... More
90 mm to 45 mm size stone aggregate.

198

-

-

... More
Grassing with selection No. 1 Doob grass including watering and

9883

-

-

-

-

-

... More
Excavating supplying and filling of local earth ( including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layer not exceeding 20cm in trenches,plinth sides of foundation including compaction with 10 tonnes roller in each 15cm layer etc. complete

1281

-

-

... More
km lead complete (sludge measured in stacks will be reduced by 8% for

-

-

-

... More
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by

1977

-

-

... More
office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide,

-

-

-

... More
In cement mortar

45

-

-

... More
Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of :

-

-

-

... More
manure and maintenance of other garden related works as directed by

-

-

-

... More
& fertilizers(whenever required) top dressing of lawn with good earth and

-

-

-

... More
In case some or many of the items of BOQ are left blank, the offer and subsequent evaluation shall be treated as per the manner specified in clause no. 12.3 of ITT.

-

-

-

... More
Ploughing the existing ground to a depth of 15 cm to 25 cm and watering and rollering with road roller as desired profile as directed by engineering inchargethe same.

9883

-

-

... More
Supplying and stacking sludge/cow dug at site including royalty and carriage upto 5

495

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m,disposed earth to be levelled and neatly dressed.

-

-

-

... More
Spreading of sludge, dump manure and/or good earth in required thickness with compection each 15cm layer with 10 ton road roller as directed by engineering incharge

2819

-

-

... More
needed (the grass and good earth shall be paid for separately).

-

-

-

... More
Complete maintenance of the entire garden features having as per yard

118596

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
lawn, free from weeds and fit for mowing including supplying good earth, if

-

-

-

... More
All kinds of soil.

-

-

-

... More
directed by the Officer-in-charge

-

-

-

... More
53 mm to 22.4 mm size stone aggregate.

66

-

-

... More
Adjustments made by the Corporation as a part of Correction of Errors in the quoted BOQ, shall be final and binding upon the bidders. If a bidder does not except the corrected calculation, their bid shall be rejected.

-

-

-

... More
All kinds of soil

1281

-

-

... More
Prices must be filled in the exact same format as given above. Any variation in format, description, unit, quantity or T&C, if noticed, may lead to rejection of the bid.

-

-

-

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.

1672

-

-

... More
plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover

-

-

-

... More
maintenance of the lawn for 30 days or more till the grass forms a thick

-

-

-

... More
cutter with fuel and other T & P material/articles shall be provided by the

-

-

-

... More
foliages, creepers etc. including hoeing,weeding, pruning, replacement of

-

-

-

... More
In case of discrepancy between rates and amount quoted above, the quoted rates shall prevail and appropriate corrections shall be made by corporation during evaluation.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.