NMDC Limited Tender

... More
The NMDC has issued a formal invitation for competitive bids for the NMDC Limited project, for Unloading Of Iron Ore Lump From Wagon Rakes For A Quantity Of 05 Lt 20 Percent In Dry Wet Condition By Mechanized Manual Means After Placement Of Loaded Rakes At Kumhar Marenga Railway Siding Kmez Including Proper Stacking On Track And Cleaning in Dantewada, Chhattisgarh, with an estimated contract value of Rs. 3,62,85,000. The bid opening date for this tender is 17-02-2025 and the last date for bid submission is 17-03-2025. Interested bidders for NMDC Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

NMDC Limited - NMDC Tender

Works
Transportation and Logistics
Minerals and Mining
Eprocure
Opening Date17 Feb 2025
Closing Date17 Mar 2025
Tender Amount₹ 3,62,85,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2. All tools and tackles required for the work shall be arranged by the contractor.

-

-

-

... More
11. Option of reverse bidding will be exercised to determin L1 bidder

-

-

-

... More
a. The rate quoted shall include all elements of cost, taxes and duties, works contract tax & other statutory levies applicable and no other extra claims shall be entertained over and above the quoted rate in the schedule of rates except for GST which is explained below.

-

-

-

... More
3. The contractor has to provide safety devices, such as safety shoes, helmet etc. to the labourers engaged by him.

-

-

-

-

-

-

... More
7. Payment of bonus is the sole responsibility of the contractor. No claim, for penalty/interest etc. on non-payment of bonus will be entertained by NMDC.

-

-

-

... More
1.GST:

-

-

-

... More
1. Un-loading of Iron ore (Lump) from Wagon/rakes for a quantity of 5,00,000 tonnes (+/-20%) in dry/wet condition by Mechanized/ Manual means after placement of loaded rakes at Kumhar Marenga Railway Siding (KMEZ) including proper stacking to avoid spillage on track & cleaning of spillage material (if any) at railway track after un-loading as directed by Engineer-In-Charge & 2. Loading, Transportation & proper stacking of Iron ore by making proper heap of ore (Lump) at designated place/stockpile for a quantity of 5,00,000 tonnes (+/-20%) from Kumhar Marenga Railway Siding (KMEZ) to NMDC stock yard with lead distance approximately 1.2 Kms. including sprinkling of water by deploying water sprinkler for dust suppression during loading, transportation and un-loading of material as directed by Engineer-In-Charge

500000

-

-

... More
b. The rates quoted shall be exclusive of GST, but Tenderers shall indicate the applicable percentage of GST in their offer. The applicable GST shall be claimed by the contractor along with their relevant RA bills against submission of documentary evidence. However, payment of GST to the authority is the sole responsibility of the contractor and no claim for penalty/interest etc. on non-payment/delayed payment will be entertained by NMDC.

-

-

-

-

-

-

... More
4. The contractor has to engage qualified trained technical personnel at work site for smooth execution of the work. He will also intimate to the Engineer In-charge, the name of his supervisor and also any change of supervisor proposed to supervise this work.

-

-

-

... More
5. Work is to be executed in Mining zone. All the Mining rules shall be binding to the contractor.

-

-

-

... More
8. The rates to be inclusive of all the points mentioned above.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.