GAIL India Limited Tender
... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.
GAIL India Limited - GAIL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 May 2025
Closing Date17 Jun 2025
Tender AmountRefer Documents
Costs
EMD
₹ 20,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_GAIL_235958_1Tender No
GAIL/NOIDA/CNP/PROJ/LMC/25-09Tender Authority
GAIL India Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area. Shifting of all obstructions within the ROU / pipeline route alignment, viz. electrical lines / poles, telephone lines / poles, coordination and liasioning with concerned authorities and obtaining NOCs from these authorities post completion of work.
-
-
-
... More
Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc by excavation in all types of soils (including soft/hard rock), including controlled blasting, chiseling or otherwise cutting etc.; providing depth of padding (Soft soil or sand) /rock shield (as directed by EIC) in trench bed & above and around the pipeline HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; [The minimum depth of the top of pipeline shall be 1.2m measured from top of pipeline coating to the top of undisturbed surface of the soil or as per Special Condition of Contract (SCC) / OISD - 141 OISD - 226]. Dewater of trenches if required as per site condition.
-
-
-
... More
Carrying out repairs of pipe defects / replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation / handling.
-
-
-
... More
Stringing of line pipes along ROU/ROW including providing straw / sand / soft soil bags, soft padding / sand padding/(Rocksheild for rocky area).
-
-
-
... More
Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding & field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-Ray (in case of space constrant & small work by Gamma Ray on Owner's approval) as per specifications in piping of all types and thickness and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities & personnel to process, develop, examine and interpret radiographs & other tests as required, carrying out repairs of weld-joints found defective by EIC, carrying out re-radiography and other tests as required on repaired joints, etc. as mentioned in SCC and particular job specifications.
-
-
-
... More
Installation of carrier line pipe at all crossings viz road, cartrack, pathway, drain, nallah & minor water crossings, etc. at designated depth by open cut (except at HDD / Boring cased crossings which is covered separately elsewhere in this SOR).
-
-
-
... More
Coating of all weld joints, long radius bends, etc.
-
-
-
... More
Installation / lowering the pipeline in trench to required depth, placement of PE / PVC warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil including supply of padding material, PE / PVC warning mat, backfilling with available / borrowed earth, approved excavated material and /or other suitable soil by crowning.
-
-
-
... More
Supply and installation of slope breakers, bank protection, wherever required and as directed by EIC.
-
-
-
... More
Installation of LR Bend, as per specification wherever required depending on site condition.
-
-
-
... More
Erection of isolation valves for pipelines inside the valve-pits and making provision to operate the valves at above ground level.
-
-
-
... More
All tieing-in, including the tie-ins with adjacent section of the pipeline.
-
-
-
... More
Lowering the pipelines in trench, providing required depth and backfilling over and around the pipeline with available, approved excavated material as per specification and / or other suitable soil approved by EIC.
-
-
-
... More
Select soil for backfilling, if required, as per specification including supply of graded sand / rock / other types of soil in place of available excavated material and / or other suitable soil, including transportation of such special backfill material over all distances, complete.
-
-
-
... More
Protective coating of 450 microns thick 2-component high built coal tar epoxy (applied with the help of minimum 3 coats) including supply of coating & other materials duly approved by Owner for all piping valves, fittings, structural steels, etc. for buried installation and inside the valve-pit.
-
-
-
... More
Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with required quantity of corrosion inhibitor including pre-testing of designated sections complete as per specification and approved by EIC to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples, etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to Contractor (rectification of defects in linepipe material not attributable to Contractor shall be paid separately as per other item of SOR), re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by EIC, complete.
-
-
-
... More
Swabbing of the complete pipeline section and the associated facilities being installed to the specified acceptance criteria and other provisions of Contract Document and instructions of EIC.
-
-
-
... More
Repair of defects recorded during EGP/gauge plate run or otherwise including cutting, beveling, welding, radiography, field joint coating etc; as applicable,
-
-
-
... More
Supply and installation of Concrete Slab / HT sheeting for Protection of Pipeline against underground HT cables /over head HT lines as required drawing and specification attached with tender document
-
-
-
... More
Final clean-up and restoration of right of way/right of use including obtaining NOC from respective land owner / farmers and statutory authorities as required and disposal of debris and returning all surplus material to designated disposal areas/storage yard, as directed by Engineer-In-Charge;
-
-
-
... More
Preparation of as-built drawings, pipe-books (2 soft copy in AutoCad format and 2 in PDF format (in seperate Pen drives/Hard drives) and 2 hard-copies of pipe-book) All the works shall be executed in accordance with the provision of Contract including carrying out all temporary / ancillary / auxiliary works required for the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for precommisioning activities.
-
-
-
... More
Line pipe laying & installation with radiography
-
-
-
... More
Specified Size (NB)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%