The Bhoramdeo Sahakari Shakkar Karkhana Maryadit has issued a formal invitation for competitive bids for Boiler/esp/cooling Tower/cane Unloader Maintenance Work in Kawardha, Chhattisgarh. The bid opening date for this tender is 18-05-2023 and the last date for bid submission is 25-05-2023. Interested bidders for Bhoramdeo Sahakari Shakkar Karkhana Maryadit tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Bhoramdeo Sahakari Shakkar Karkhana Maryadit Tender

Machinery and Tools
Opening Date18 May 2023
Closing Date25 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
70 T.P.H. Boiler – Air Pre Heater Tubes to be replaced, along with IBR Tube : - Tube O.D. – 76mm Length – 2700mm Thickness – 3.25mm (10-SWG) No. of Tubes – 3200 Material – BS 6323 PTV ERW, On your Scope. Tata Steel – Make Work Terms & Conditions :- 1.Boarding & lodging will be in the scope of contractor 2. Convenance to working team & boarding & lodging in the scope of contractor 3. work as per factory act. 4. Insurance of workers. 5. Contracter will be responsible for any accident to their workers. 6. Electricity charges for fabrication job will be done by factory. 7. O2 gas & LPG gas as regd. for Fabrication work will be given by factory on chargeable basis with one week prior in timitation. 8. Regd. In G.S.T. 9. Income Tax Certificate needed. 10. Work deflection as per Schedule will be chargable. 11. Advance etc. will be finalise at the time final discussion before order. 12. All dismentling Tubes etc. fitting of new tube & Expansion with hydraulic testing in the scope of contractor. 13. Period of work -60 Days. Payment Terms & Conditions :- Mutual discussion at the time of finalization of work order

1

-

-

... More
6 MW Co-gen Power Plant Cooling Tower, Paltech – Make, Having Two Cells & Fans Needs Thorough overhauling. Each Cell Flow - 1200 M³/hr, H.W.T. - 40°C, C.W.T. - 25°C i) Both Fans are in running condition but its frame to be replaced. ii) Cell No. 2 FRP – Blade, Hub assembly, Drive Shaft with Coupling needs replacement. iii) Both cell Drift Eliminator (1.5mm X 146mm – PVC), to be replaced. iv) Hot Water Header (400Ø X 6mm, Thick.) to be replaced. v) All branch Pipes, Size - 4"Ø X 6mm Thick. – 20 Nos. along with Noggles – 6 Nos. each, to be replaced. vi) Both Cells PVC film (19mm flute X 1200mm ht. X 4 layer) – 192M³ to be replaced. Terms & Conditions :- 1. All men power, T&P & consumables will be arranged by contractor. 2. However all consumables will be provided by the company free of cost. 3. 100% Payment will be done in 15 days after completion of work. 4. Period of work - 40 days from W.O. issue 5. All Required Spare Parts on Scope of Contractor. 6. Both Fans Alignment & Balacing Work on Scope of Contractor

1

-

-

... More
3500 TCD Sugar Plant Cane Unloader No. 1 & 2 Needs Rectification i) It's Moving & lifting speed should be increased. ii) Grab Needs Replacement, Capacity - 5 M.T. iii) 3 Stage Gear Box & 30 H.P. motor (Duty - S4) to be fitted. Terms & Conditions :- 1. All men power, T&P & consumables will be arranged by contractor. 2. However all consumables will be provided by the company free of cost. 3. 100% Payment will be done in 15 days after completion of work. 4. Period of work - 40 days from W.O. issue 5. All Required Spare Parts on Scope of Contractor.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.