Bharat Sanchar Nigam Limited Tender

... More
BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Chhattisgarh government has posted on its website in a very hassle-free manner.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Eprocure
Opening Date6 Mar 2025
Closing Date18 Mar 2025
Tender Amount₹ 3,60,267 
Notes
Download

Costs

Summary

31/2024-25/bsnl/cd/raipur Date 05.03.2025

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of RCC plate forms for BTS equipments at Narmada and Dauchawra BTS under SDOT Khairagarh (Chhattisgarh).
Construction of RCC plate forms for BTS equipments at Narmada and Dauchawra BTS under SDOT Khairagarh (Chhattisgarh).
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : All work upto plinth level :

-

-

-

... More
1 : 5 : 10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size).

2

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

6

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

0.6

-

-

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources).

6

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

8

-

-

... More
Suspended floors, roofs, landings, balconies and access platform

24

-

-

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

18

-

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

30

-

-

... More
Stairs, (excluding landings) except spiral-staircases

6

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

495

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in:

-

-

-

... More
Cement mortar 1 : 6 ( 1 cement : 6 coarse sand).

0.5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :

-

-

-

... More
Cement mortar 1 : 6 ( 1 cement : 6 coarse sand).

5

-

-

... More
Structural steel work riveted, bolted or welded in built up sections trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

50

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
1 : 6 (1 cement : 6 fine Sand ).

40

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement: 6 fine sand)

40

-

-

... More
6 mm cement plaster of mix :

-

-

-

... More
1:3 (1 cement: 3 fine sand)

90

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.