Chandigarh Administration Tender
View complete overview of Chandigarh Chandigarh Administration Tender
Chandigarh Administration Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date27 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 4,03,015
Costs
EMD
₹ 8,061Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repairing/testing Of 01no. 11/0.433kv Copper Wound 750 Kva (make Nei Sr. No. 530/1) And 800 Kva Aluminum Wound (make Alpha Electric Sr. No. 800/06) Transformer Damaged Distribution T/f Installed At I/d S/stn, Sec-11b, Chd Under S/divn No. 2, Chd
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CHD_84089_1Bid Award Id
ViewTender No
OP1/16/2024-25Tender Authority
Chandigarh Administration ViewPurchaser Address
-Website
http://http://chandigarh.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Replacement of LT flexible connection between L.T winding and T/F bushing (1 Set consist of 4 Nos. of LT flexible connections).
4
1500
6000
... More
Replacement of complete L.T Voltage (11KV) stud bushing confirming to IS:3347 with metal parts.
4
5000
20000
... More
Replacement of complete High Voltage (11KV) stud bushing confirming to IS:3347 with metal parts.
3
1250
3750
... More
Replacement of Cork, washer, Gasket, washers & rubber seals for all HV & LV rods.
4
880
3520
... More
Replacement of Top Cover gasket complete in all respect.
1
1320
1320
... More
Replacement of 11 KV tap changing switch complete with handle and locking arrangement with tapping range from 2.5%-5.0% with normal position.
1
2000
2000
... More
Supply and Fixing of Silica gel Breather complete in all respect
1
880
880
... More
Sundry items viz providing plugs, caps, screws, washers including material for minor repair of tank/radiator & other parts, etc, inclusive of welding job.
1
1500
1500
... More
Supply & filling of fresh transformer oil for topping up the oil level, with quality transformer oil confirming to IS: 335 standard including dehydration & filtration
200
180
36000
... More
Dehydration of T/F oil after removing it from transformer tank and then pouring it back in transformer tank after dehydration & filtration process
1600
6
10560
... More
Painting inside transformer with Zinc cromite paint & outside with primer and painting with grey paint including marking etc.
1
1500
1500
... More
Loading/unloading and D/E of T/F.
1
6600
6600
... More
Transportation charges
2
2750
5500
... More
Credit of dismantled material
a) HV/LV winding of Copper.
390
450
-175500
... More
Credit for other dismantled parts such as bushing metal taping switch drain valve etc
1
1500
-1500
... More
Opening of 800 KVA 11/0.433 KV distribution transformer, detanking core and coil assembly washing of dust from all parts etc. re-tanking after reassembling of part and boxing up.
1
7500
7500
... More
Replacement of complete high voltage (11KV) leg coil with new coils of copper EC grade round copper wire with double paper covered insulation (DPC) identical to the original one.
155
305
47275
... More
Replacement of complete low voltage (440V) leg coil with new coils of copper EC grade round copper wire with double paper covered insulation (DPC) identical to the original one.
100
305
30500
... More
Replacement of LT flexible connection between LT winding and T/F bushing (1 Set consist of 4 Nos. of LT flexible connections).
4
1500
6000
... More
Replacement of complete LT Voltage (11KV) stud bushing confirming to IS:3347 with metal parts.
4
5000
20000
... More
Replacement of complete High Voltage (11KV) stud bushing confirming to IS:3347 with metal parts.
3
1250
3750
... More
Replacement of Cork, washer, Gasket, washers & rubber seals for all HV & LV rods.
4
880
3520
... More
Replacement of Top Cover gasket complete in all respect.
1
1320
1320
... More
Replacement of 11 KV tap changing switch complete with handle and locking arrangement with tapping range from 2.5%-5.0% with normal position.
1
2000
2000
... More
Supply and Fixing of Silica gel Breather complete in all respect
1
880
880
... More
Sundry items viz providing plugs, caps, screws, washers including material for minor repair of tank/radiator & other parts, etc, inclusive of welding job.
1
1500
1500
... More
Supply & filling of fresh transformer oil for topping up the oil level, with quality transformer oil confirming to IS: 335 standard including dehydration & filtration
110
180
19800
... More
Dehydration of T/F oil after removing it from transformer tank and then pouring it back in transformer tank after dehydration & filtration process
725
6
4785
... More
Painting inside transformer with Zinc cromite paint & outside with primer and painting with grey paint including marking etc.
1
1500
1500
... More
Welding of tank and body to remove the leakage
1
2500
2500
... More
Crane charges
2
2200
4400
... More
Credit of dismantled material
a) HV/LV winding of Aluminium
255
169
-43095
... More
Credit for other dismantled parts such as bushing metal taping switch drain valve etc.
1
1500
-1500
... More
Note:All rates offered by bidder should be inclusive of all taxes.
1. The bidder/firm should quote rates in the percentage in the BOQ only. 2. No tax/GST/ duties/levies what so ever shall be paid extra. 3.The rates quoted in the percentage rate BOQ as prescribed by e-tendering portal shall be considered final and conclusive. Further labour welfare cess /TDS will be deducted from the contractor bill as applicable. 4. Rates and any other financial entity in any other form other than BOQ i.e. letter head attached in corporated by bidder shall be straight way ignored and shall not be considered as prescribed in DNIT.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements