The Rural Works Department has issued a formal invitation for competitive bids for Tender Invitation Notice For Schemes Under Rural Road Strengthening And Management Program As A Part Of Chief Minister Rural Road in Araria, Bihar, with an estimated contract value of Rs. 47,69,32,211. The bid opening date for this tender is 30-04-2025 and the last date for bid submission is 05-05-2025. Interested bidders for Rural Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date30 Apr 2025
Closing Date5 May 2025
Tender Amount₹ 47,69,32,211 
Notes
Download

Costs

Summary

Tender Invitation Notice For Schemes Under Rural Road Strengthening And Management Program As A Part Of Chief Minister Rural Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.2 m Dia Pile

1

350000

350000

... More
Pile Cap in RCC M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)

305.69

8592

2626644.38

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

366.84

4980

1827017.27

... More
Providing and laying Cutting Edge of mild steel weighing 40kg per metre for well foundation complete as per drawing and technical specification.

3.87

101860

394200.95

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Miscellaneous Work

-

-

-

... More
H.L. BRIDGE WORK

-

-

-

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC)

30

7249

217499.1

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

503.01

116

58600.67

... More
Total Cost for 1st Year Maintenance Work

1

13014

13014

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

26.26

14039

368675.69

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

306

4968

1520223.3

... More
18% GST

1

55375

55375.13

... More
1% LABOUR CESS

1

352795

352795.73

... More
DIVERSION

-

-

-

... More
Total Cost for 3rd Year Maintenance Works

1

79364

79364

... More
SEIGNOIRAGE FEE

1

286054

286054.12

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

100.67

3244

326623.7

... More
Carrying Out Load Test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load

-

-

-

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

82.6

9769

806924.36

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

24.16

68693

1659628.44

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
Pile Cap in RCC M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)

305.69

8592

2626644.38

... More
Total Cost for 1st Year Maintenance Work

1

19521

19521

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

334.17

116

38930.81

... More
a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
Add 20% of cost for kentledge including supports, loading arrangement and labour.

60

13483

808980

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

1056

55

59030.4

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.

-

-

-

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

263.33

116

30677.95

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

240

3178

762751.2

... More
1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

5129

245

1259887.56

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
APPROCH ROAD

-

-

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

225555.2

-

196233.02

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
Construction of RCC H.L. Bridge in Barhara ST Tola To Nathpur Sima PMGSY Road At Ch-0.800 Km

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

107.81

68267

7359919.18

... More
900 mm side octagon

2

9110

18221.26

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

556.88

4980

2773496.29

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

132

229

30305.88

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
Depth below bed level upto 3.0 M.

15

3914

58716.75

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

1

83629

83629.59

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

61.5

4968

305535.08

... More
Well Steining (vii) RCC M-30 Grade Case-I : With Batching Plant and Concrete Pump

3354.12

8773

29428009.1

... More
Total Cost for 5th Year Maintenance Works

1

69364

69364

... More
Depth below bed level upto 3.0 M.

18

3914

70460.1

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

904.5

19

17375.45

... More
BOULDER PITCHING IN PROTECTION WORK

-

-

-

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

26.85

14251

382656

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

58.96

14039

827765.38

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

37.5

4058

152195.25

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

326.06

4968

1619882.38

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

26.26

14039

368675.69

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

225555.2

-

196233.02

... More
900 mm side octagon

2

9110

18221.26

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

50.7

12600

638862.59

... More
Total Cost for 3rd Year Maintenance Works

1

46956

46956

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
Total Cost for 5th Year Maintenance Works

1

59552

59552

... More
DIVERSION

-

-

-

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

69.18

68480

4737494.13

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

165.6

4968

822709.08

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

40

778

31134

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

24

439

10544.64

... More
900 mm side octagon

2

9110

18221.26

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

4

83629

334518.36

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

180

1000

180000

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC)

30

7249

217499.1

... More
SEIGNOIRAGE FEE

1

1048

1048.64

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

126.41

8889

1123783.64

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

32

778

24907.2

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
Excavation for Structures

-

-

-

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

135.68

6374

864832.46

... More
Sandy Soil

-

-

-

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

768

16

12318.72

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Well Cap (ii) RCC Grade M-30 Case-I : With Batching Plant, Transit Mixer and Concrete Pump

211.95

8613

1825694.91

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
1% LABOUR CESS

1

1068729

1068729.22

... More
Sandy Soil

-

-

-

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

150

1000

150000

... More
Beyond 3 m upto 10 m depth

36

5442

195942.24

... More
900 mm side octagon

2

9110

18221.26

... More
Plain / reinforced cement concrete in well foundation complete as per drawing and technical specification

-

-

-

... More
SUBSTRUCTURE

-

-

-

... More
Wet Mix Maccadam :- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

67.84

4967

336978.92

... More
GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

192.97

3244

626122.04

... More
FOUNDATION

-

-

-

... More
DIVERSION

-

-

-

... More
Pile Cap in RCC M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)

305.69

8592

2626644.38

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

42.25

167

7083.64

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

220

229

50509.8

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC)

30

7249

217499.1

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

46.05

11901

548086.18

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

33.8

167

5666.91

... More
Total Cost for 4th Year Maintenance Works

1

24517

24517

... More
Total Cost for 1st Year Maintenance Work

1

35389

35389

... More
1.2 m Dia Pile

1

350000

350000

... More
BOULDER PITCHING IN PROTECTION WORK

-

-

-

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
900 mm side octagon

2

9110

18221.26

... More
Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

11.72

92578

1085023.65

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

33.37

14039

468496.11

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

90.23

6374

575131.43

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

177

5210

922196.55

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
Total Cost for 2nd Year Maintenance Works

1

25938

25938

... More
Miscellaneous Work

-

-

-

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

144.14

9036

1302460.57

... More
SUPERSTRUCTURE

-

-

-

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.23

73254

16848.51

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.2

73254

14650.88

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

932.95

248

232220.58

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

132

229

30305.88

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

25.71

9036

232317.62

... More
18% GST

1

43993

43993.54

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings

-

-

-

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.

-

-

-

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

1056

19

20285.76

... More
FOUNDATION

-

-

-

... More
Construction Of RCC H.L. Bridge in PMGSY Road Sah Tola To Manikpur at Ch:-1.000 Kms.

-

-

-

... More
Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

45.11

4967

224073.1

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

156

9769

1523973.36

... More
PROTECTION WORK

-

-

-

... More
SUBSTRUCTURE

-

-

-

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

121.23

8889

1077733.49

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
1% LABOUR CESS

1

361892

361892.17

... More
II. PCC Grade M-15 (Levelling Course for Pile Cap)

27.71

7487

207490.54

... More
Providing and laying Cutting Edge of mild steel weighing 40kg per metre for well foundation complete as per drawing and technical specification.

4.64

101860

472633.69

... More
Total Cost for 3rd Year Maintenance Works

1

76064

76064

... More
Total Cost for 5th Year Maintenance Works

1

93186

93186

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

62.89

68693

4320117.23

... More
Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

19.17

92578

1774735.79

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

10.93

9027

98665.44

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

114.49

8889

1017814.96

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC)

412.45

1654

682489.26

... More
Dismantling of Existing Structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC)

126.68

1654

209619.93

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

87.17

4968

433064.92

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

118.22

8889

1050974.62

... More
SUPERSTRUCTURE

-

-

-

... More
BOULDER PITCHING IN PROTECTION WORK

-

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

24

778

18680.4

... More
Total Cost for 5th Year Maintenance Works

1

87163

87163

... More
Total Cost for 4th Year Maintenance Works

1

52128

52128

... More
Total Cost for 2nd Year Maintenance Works

1

39280

39280

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

66.79

4058

271069.89

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

81.97

68267

5595886.98

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

81.95

4968

407131.7

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
SUPERSTRUCTURE

-

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

7.19

9027

64904.35

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

12600

319431.29

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

100

1000

100000

... More
18% GST

1

6403532

6403532.56

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.

-

-

-

... More
Bottom Plug (i) PCC Grade M-20 Case-I : With Batching Plant and Concrete Pump

245.18

8065

1977550.78

... More
Miscellaneous Work

-

-

-

... More
Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

11.72

92578

1085023.65

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

156

9769

1523973.36

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.12

73254

8790.53

... More
1% LABOUR CESS

1

2824

2824.55

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

75

1000

75000

... More
1% LABOUR CESS

1

3072

3072.88

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

477.5

9769

4664726.15

... More
Total Cost for 3rd Year Maintenance Works

1

77629

77629

... More
Total Cost for 3rd Year Maintenance Works

1

51753

51753

... More
1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

71.73

14039

1007049.03

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

20.53

12402

254632.97

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

38.4

11901

457036.03

... More
Total Cost for 2nd Year Maintenance Works

1

41788

41788

... More
DIVERSION

-

-

-

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

19.52

12402

242105.97

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

18

5080

91451.34

... More
18% GST

1

6463299

6463299.17

... More
SEIGNOIRAGE FEE

1

403219

403219.21

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
II. PCC Grade M-15 (Levelling Course for Pile Cap)

27.71

7487

207490.54

... More
SUBSTRUCTURE

-

-

-

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
DIVERSION

-

-

-

... More
GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

160.25

3244

519956.77

... More
Construction of RCC H.L. Bridge in Surya Narayan Yadav Mukhiya Tola Posadaha To Primary School Khaira Pacci Road At Ch-1.700 Km

-

-

-

... More
APPROCH ROAD

-

-

-

... More
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter

50

7188

359412.5

... More
H.L. BRIDGE WORK

-

-

-

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

93.36

1674

156336.92

... More
Total Cost for 1st Year Maintenance Work

1

37341

37341

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
Excavation for Structures

-

-

-

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

25.35

167

4250.18

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

3

83629

250888.77

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

31.41

68480

2150978.47

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
1% LABOUR CESS

1

937883

937883.8

... More
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter

60

7188

431295

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.

-

-

-

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

12

5080

60967.56

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

852.72

245

209462.14

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

33.8

12600

425908.39

... More
FOUNDATION

-

-

-

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
1% LABOUR CESS

1

484274

484274.18

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

100.8

412

41559.84

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

1303.5

16

20908.14

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

40

778

31134

... More
Total Cost for 3rd Year Maintenance Works

1

63126

63126

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.

-

-

-

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

50.7

454

23034.02

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

158.02

5214

823927.34

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
18% GST

1

56053

56053.72

... More
1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
i) Upto 3m depth

550.81

412

227098.96

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

168

412

69266.4

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

225555.2

-

196233.02

... More
Excavation for Structures

-

-

-

... More
18% GST

1

30276

30276.56

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

75

1000

75000

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

23.03

14251

328214.81

... More
Total Cost for 4th Year Maintenance Works

1

36777

36777

... More
18% GST

1

51531

51531.47

... More
MISCELLANEOUS

-

-

-

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification.

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

125.82

3244

408243.12

... More
II. 1200 mm Dia (Using Batching Plant, Transit Mixer and Concrete Pump)

600

16612

9967464

... More
1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
II. 1200 mm Dia (Using Batching Plant, Transit Mixer and Concrete Pump)

468

16612

7774621.92

... More
Total Cost for 4th Year Maintenance Works

1

51145

51145

... More
Top Plug (ii) PCC Grade M-20 Case-I : With Batching Plant and Concrete Pump

20.41

7956

162398.7

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

47.96

11901

570848.72

... More
Miscellaneous Work

-

-

-

... More
Total Cost for 1st Year Maintenance Work

1

40625

40625

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

24.16

68693

1659628.44

... More
PROTECTION WORK

-

-

-

... More
MISCELLANEOUS

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

70.68

4967

351085.94

... More
PROTECTION WORK

-

-

-

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

61.97

68480

4243748.36

... More
SUBSTRUCTURE

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

100.8

412

41559.84

... More
a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings

-

-

-

... More
SUBSTRUCTURE

-

-

-

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

160

3178

508500.8

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

204.74

8889

1820136.55

... More
PROTECTION WORK

-

-

-

... More
APPROCH ROAD

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

201.6

412

83119.68

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

12

5080

60967.56

... More
Bituminous Macadam (For Grading-II):- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

65.18

11901

775711.55

... More
SEIGNOIRAGE FEE

1

295576

295576.95

... More
FOUNDATION

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

53.7

11901

639136.33

... More
1.2 m Dia Pile

1

350000

350000

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

6

439

2636.16

... More
Granular Material

144.87

4248

615423.7

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

4776.66

245

1173338.76

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

281.7

5214

1468803.52

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

758.6

248

188823.13

... More
Total Cost for 2nd Year Maintenance Works

1

44331

44331

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

584.25

248

145425.67

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

77.77

68693

5342272.5

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

25.35

167

4250.18

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

563.4

4980

2805968.63

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

1

83629

83629.59

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification.

-

-

-

... More
Total Cost for 5th Year Maintenance Works

1

89327

89327

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

37.5

4058

152195.25

... More
Sand filling in wells complete as per drawing and technical specifications

1536.57

3888

5974829.52

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

263.33

116

30677.95

... More
I) Sandy Material

171.92

4228

727013.58

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

108.7

5214

566769.41

... More
Well Cap (ii) RCC Grade M-30 Case-I : With Batching Plant, Transit Mixer and Concrete Pump

254.34

8613

2190833.89

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

577.72

245

141911.14

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

904.5

55

50561.55

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

81.08

68267

5535128.9

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.16

73254

11720.7

... More
H.L. BRIDGE WORK

-

-

-

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

141.36

6374

901037.12

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

68.36

1674

114472.92

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

25

4058

101463.5

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

15.38

14251

219189.92

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

123.84

8889

1100936.36

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

25.35

167

4250.18

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

337.44

4980

1680592.92

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

78.47

4968

389842.88

... More
Granular Material

150.87

4248

640912.36

... More
i) Upto 3m depth

415.68

412

171384.86

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification.

-

-

-

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

460.8

5210

2400837.12

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

49.5

4058

200897.73

... More
18% GST

1

32675

32675.21

... More
II. PCC Grade M-15 (Levelling Course for Pile Cap)

27.71

7487

207490.54

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

25.35

454

11517.01

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

1968.56

245

483557.08

... More
H.L. BRIDGE WORK

-

-

-

... More
Well Curb (iv) RCC M-35 Grade Case-I : With Batching Plant, Transit Mixer and Concrete Pump

388

9376

3637934.56

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

28.8

9036

260239.1

... More
18% GST

1

17225941

17225941.84

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

168

412

69266.4

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

12

5080

60967.56

... More
FOUNDATION

-

-

-

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

208.24

1674

348710.37

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

22.94

68480

1570947.03

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.

-

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

8.88

92578

822099.83

... More
Carrying Out Load Test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load

-

-

-

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

19.23

14039

269978.43

... More
Total Cost for 2nd Year Maintenance Works

1

25079

25079

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

959.25

16

15386.37

... More
i) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

23.36

9027

210871.42

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

253.36

1674

424266.52

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

120

229

27550.8

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

160

3178

508500.8

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

24.65

68480

1688049.01

... More
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. Depth of sinking is reckoned from bed level.

-

-

-

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

201.15

3244

652663.36

... More
BOULDER PITCHING IN APPROACH ROAD

-

-

-

... More
i) Upto 3m depth

583.26

412

240478.1

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

28.8

439

12653.57

... More
Sand filling in wells complete as per drawing and technical specifications

1843.89

3888

7169818.75

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE Bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

30

48594

1457832.9

... More
Total Cost for 4th Year Maintenance Works

1

47468

47468

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

43.61

3244

141483.4

... More
GSB :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

274.78

3244

891567.67

... More
1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

158.4

6374

1009651.1

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

7.14

9027

64452.99

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

48

778

37360.8

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
SEIGNOIRAGE FEE

1

274848

274848.94

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

252

229

57856.68

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

240

3178

762751.2

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

921

16

14772.84

... More
I) Sandy Material

143.84

4228

608269.15

... More
18% GST

1

19632002

19632002.13

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.22

73254

16115.96

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Beyond 10 m upto 20 m

-

-

-

... More
Construction Of RCC H.L. Bridge In L056-Rampur To Bailsandi Road (VR56) At Ch-1.600 Kms.

-

-

-

... More
1% LABOUR CESS

1

349397

349397.3

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

1074

16

17226.96

... More
Total Cost for 2nd Year Maintenance Works

1

16720

16720

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

29.54

3244

95847.26

... More
1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

382

9769

3731780.92

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

31.12

68693

2137733.32

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Total Cost for 4th Year Maintenance Works

1

30617

30617

... More
SEIGNOIRAGE FEE

1

973413

973413.23

... More
900 mm equilateral & triangle

2

6119

12239.6

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

601.5

55

33623.85

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1107.3

248

275618.04

... More
APPROCH ROAD

-

-

-

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

771

4980

3839903.82

... More
i) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

29.06

9027

262325.49

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

12600

319431.29

... More
1.2 m Dia Pile

1

350000

350000

... More
Beyond 20 m upto 30 m

-

-

-

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

753

19

14465.13

... More
Beyond 20 m upto 30 m

-

-

-

... More
18% GST

1

7202688

7202688.55

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

23.98

14251

341771.66

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

93.36

1674

156336.92

... More
Sandy Material

300.75

4228

1271808.59

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

20.53

12402

254632.97

... More
Construction Of RCC H.L. Bridge In L056-Rampur To Bailsandi Road (VR56) At Ch-15.500 Kms.

-

-

-

... More
18% GST

1

45350

45350.79

... More
Miscellaneous Work

-

-

-

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
FOUNDATION

-

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

12600

319431.29

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
Beyond 3 m upto 10 m depth

30

5442

163285.2

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

140.15

5214

730751.91

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

25.35

454

11517.01

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification.

-

-

-

... More
Total Cost for 5th Year Maintenance Works

1

51636

51636

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

112.95

6374

719950.08

... More
GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

127.52

3244

413759.04

... More
H.L. BRIDGE WORK

-

-

-

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

4821.26

245

1184294.31

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.

-

-

-

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

30.75

11901

365985.89

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

628.22

116

73187.63

... More
SUPERSTRUCTURE

-

-

-

... More
SUBSTRUCTURE

-

-

-

... More
i) Upto 5m height (Using Batching Plant, Transit Mixer and Concrete Pump)

216.49

8889

1924593.94

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
II. PCC Grade M-15 (Levelling Course for Pile Cap)

27.71

7487

207490.54

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

42

778

32690.7

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

-

-

-

... More
i) Upto 3m depth

549.28

412

226468.14

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

601.5

19

11554.82

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

23.95

68480

1640112.53

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

20.53

12402

254632.97

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

24.8

9036

224094.78

... More
Miscellaneous Work

-

-

-

... More
Carrying Out Load Test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load

-

-

-

... More
FOUNDATION

-

-

-

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

12

5080

60967.56

... More
Plain / reinforced cement concrete in well foundation complete as per drawing and technical specification

-

-

-

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

14.4

439

6326.78

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

12600

319431.29

... More
I) Sandy Material

161.39

4228

682484.42

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC)

45

7249

326248.65

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

33.8

454

15356.02

... More
Add 20% of cost for kentledge including supports, loading arrangement and labour.

50

13483

674150

... More
ii) 3m to 6m depth

199.08

489

97471.56

... More
SEIGNOIRAGE FEE

1

992

992.46

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

85.43

4968

424420.51

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

24

439

10544.64

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

904.5

55

50561.55

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

20.53

12402

254632.97

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

19.2

14251

273631.1

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row (1000 MM DIA HPC)

30

7249

217499.1

... More
Excavation for Structures

-

-

-

... More
1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
II. 1200 mm Dia (Using Batching Plant, Transit Mixer and Concrete Pump)

468

16612

7774621.92

... More
TACK COAT:-Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

921

16

14772.84

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

165.6

4968

822709.08

... More
1% LABOUR CESS

1

1655

1655.56

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

768

5210

4001395.2

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

5485.8

245

1347531.91

... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

60

778

46701

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

25.35

454

11517.01

... More
1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

338332.8

-

294349.54

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

7487

66417.94

... More
1% LABOUR CESS

1

2483

2483.33

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

192.49

6374

1226926.87

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

102.6

5214

534963.58

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

23.03

14251

328214.81

... More
SEIGNOIRAGE FEE

1

935

935.89

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

976.54

248

243070.57

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
II. 1200 mm Dia (Using Batching Plant, Transit Mixer and Concrete Pump)

468

16612

7774621.92

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.

-

-

-

... More
H.L. BRIDGE WORK

-

-

-

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

183.6

9769

1793599.42

... More
18% GST

1

8876684

8876684.04

... More
TACK COAT:- Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

615

16

9864.6

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

93.36

1674

156336.92

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

42

412

17316.6

... More
Providing and constructing One Span Service Road to reach island location from one pier location to another pier location including Royality for earth

37.5

4058

152195.25

... More
II. 1200 mm Dia (Using Batching Plant, Transit Mixer and Concrete Pump)

468

16612

7774621.92

... More
Construction of RCC H.L. Bridge in L056-Rampur To Bailsandi Road (VR56) At Ch-1.900 Kms.

-

-

-

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.

-

-

-

... More
II. RCC M-30 (Using Batching Plant, Transit Mixer and Concrete Pump)

156

9769

1523973.36

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

73.25

4968

363909.66

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

942.38

19

18103.02

... More
I) Sandy Material

168.41

4228

712170.52

... More
Sandy Material

368.9

4228

1560000.63

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading I -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

43.61

3244

141483.4

... More
1% LABOUR CESS

1

3036

3036.11

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

27.46

9036

248130.76

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

276

4968

1371181.8

... More
Well Curb (iv) RCC M-35 Grade Case-I : With Batching Plant, Transit Mixer and Concrete Pump

388

9376

3637934.56

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

225555.2

-

196233.02

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

50.7

167

8500.36

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

118.66

1674

198703.29

... More
SEIGNOIRAGE FEE

1

1132

1132.49

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

20.53

12402

254632.97

... More
900 mm side octagon

2

9110

18221.26

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

498.6

4980

2483237.41

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

75

1000

75000

... More
BOULDER PITCHING IN APPROACH ROAD

-

-

-

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1368.83

248

340714.23

... More
i) Upto 3m depth

327.86

412

135176.68

... More
APPROCH ROAD

-

-

-

... More
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specification. Depth of sinking is reckoned from bed level.

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

80.33

68267

5483928.28

... More
APPROCH ROAD

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

162.92

68267

11122141.1

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

852.72

245

209462.14

... More
1.2 m Dia Pile

1

350000

350000

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

1

83629

83629.59

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

240

3178

762751.2

... More
H.L. BRIDGE WORK

-

-

-

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

904.5

19

17375.45

... More
Bottom Plug (i) PCC Grade M-20 Case-I : With Batching Plant and Concrete Pump

294.21

8065

2373012.54

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
Total Cost for 1st Year Maintenance Work

1

32135

32135

... More
Pile Cap in RCC M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)

305.69

8592

2626644.38

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

15.24

68693

1046884.83

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

120

229

27550.8

... More
Miscellaneous Work

-

-

-

... More
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 Sand Filling

14.4

439

6326.78

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

24.16

68480

1654493.47

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

993.6

5210

5176805.04

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.

-

-

-

... More
SEIGNOIRAGE FEE

1

991

991.55

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

25.35

454

11517.01

... More
i) Upto 3m depth

648.4

412

267335.32

... More
Carrying Out Load Test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load

-

-

-

... More
Beyond 10 m upto 20 m

-

-

-

... More
Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

32.59

14251

464424.67

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

42.25

12600

532385.49

... More
Total Cost for 1st Year Maintenance Work

1

23714

23714

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

4

10516

42065.2

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

160

3178

508500.8

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

395.1

4968

1962876.56

... More
1% LABOUR CESS

1

2410

2410.62

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

460.8

5210

2400837.12

... More
Excavation for Structures

-

-

-

... More
18% GST

1

6632403

6632403.44

... More
SEIGNOIRAGE FEE

1

1006

1006.36

... More
Construction Of RCC H.L. Bridge In Naharpul Babu Lal Paswan Tola To Ward-15 Paswan Master Tola At Ch-1.020 Kms.

-

-

-

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

7.19

9027

64904.35

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
SUPERSTRUCTURE

-

-

-

... More
BOULDER PITCHING IN PROTECTION WORK

-

-

-

... More
SEIGNOIRAGE FEE

1

1125027

1125027.54

... More
Total Cost for 4th Year Maintenance Works

1

41338

41338

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

1

83629

83629.59

... More
Providing and fixing in position 20 mm thick Premoulded jPJoint Filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

25.35

167

4250.18

... More
Carrying Out Load Test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load

-

-

-

... More
Providing Steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

13.85

92578

1282216.52

... More
PROTECTION WORK

-

-

-

... More
II. PCC Grade M-15 (Levelling Course for Pile Cap)

35

7487

262077.55

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

-

-

-

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

26.26

14039

368675.69

... More
Excavation for Structures

-

-

-

... More
SEIGNOIRAGE FEE

1

334508

334508.6

... More
Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

56.48

4967

280526.01

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

40

5080

203225.2

... More
Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

79.2

4967

393406.99

... More
Type - A, "W" : Metal Beam Crash Barrier:- Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810

240

3178

762751.2

... More
SUBSTRUCTURE

-

-

-

... More
Bituminous Macadam:- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

46.05

11901

548086.18

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

4598.26

245

1129516.59

... More
a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings

-

-

-

... More
Providing & fixing 20 mm thick Compressible Fibre Board in expansion joint complete as per drawing & Technical Specification.

42.25

454

19195.02

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

2460.48

245

604392.31

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

753

55

42092.7

... More
ii) 3m to 6m depth

165.9

489

81226.3

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
Well Steining (vii) RCC M-30 Grade Case-I : With Batching Plant and Concrete Pump

2795.1

8773

24523340.92

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

46.56

9036

420719.88

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

112.32

5214

585644.34

... More
Top Plug (ii) PCC Grade M-20 Case-I : With Batching Plant and Concrete Pump

17.01

7956

135345.51

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

4687.46

245

1151427.67

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings

-

-

-

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

1283.25

55

71733.68

... More
Wet Mix Maccadam:- Providing Laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill) carraige of mixed material by tipper to site,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

96.24

4967

478067.73

... More
WBM Grading 2:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.

135.68

6374

864832.46

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

4018.46

245

987094.51

... More
i) Upto 3m depth

759.24

412

313034.65

... More
Construction of Subgrade And Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

932.95

248

232220.58

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

178.29

68267

12171412.58

... More
APPROCH ROAD

-

-

-

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification

-

-

-

... More
TACK COAT:- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.25 to 0.30 kg per sq m on the prepared Granular surface cleaned with hydraulic broom as per technical specification clause 503.

1283.25

19

24651.23

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
PRIME COAT:- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

942.38

55

52678.76

... More
900 mm x 300 mm,Hazard Marker

4

4598

18393.32

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

7.19

9027

64904.35

... More
Retro-reflectorised Traffic Signs

-

-

-

... More
1% LABOUR CESS

1

1788

1788.61

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.33

73254

24173.95

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

367.2

4968

1824267.96

... More
Reinforced Cement Concrete M-30 Grade Approach Slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

19.52

12402

242105.97

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

385.5

5214

2010023.99

... More
1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
PROTECTION WORK

-

-

-

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE Bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

24

48594

1166266.32

... More
Total Cost for 3rd Year Maintenance Works

1

83828

83828

... More
SEIGNOIRAGE FEE

1

879

879.32

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

193.33

116

22522.95

... More
ii) From 5m upto 10m height (Using Batching Plant, Transit Mixer and Concrete Pump)

312.46

9036

2823413.56

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

81.08

68267

5535128.9

... More
I) Sandy Material

154.37

4228

652798.31

... More
Providing & Applying 2 coats of water based cement paints to unplastered concrete surface after cleaning the surface of dirt,dust,oil,grease,effloresence and applying paint @ of 1 litre for 2 sqm

263.33

116

30677.95

... More
Carrying out the Confirmatory Boring for Soil Investigation for foundation as per clause 2400 of MORT&H Specification.

75

1000

75000

... More
Providing and laying Boulder pitching on slopes with stone/ Boulder laid over prepared filter media as per drawing and technical specifications Clause 1302 (WIRE CARATED)

828

5210

4314004.2

... More
Supplying, fitting and placing HYSD Bar Reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

24.16

68693

1659628.44

... More
a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings

-

-

-

... More
SUPERSTRUCTURE

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

355.92

4980

1772631.09

... More
Total Cost for 2nd Year Maintenance Works

1

35099

35099

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

120

229

27550.8

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

32

5080

162580.16

... More
1% LABOUR CESS

1

392875

392875.53

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.2

73254

14650.88

... More
GSB :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

192.97

3244

626122.04

... More
Total Cost for 5th Year Maintenance Works

1

84254

84254

... More
Excavation for Structures

-

-

-

... More
GSB (G-II) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

225.7

3244

732319.76

... More
900 mm side octagon

2

9110

18221.26

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification.

-

-

-

... More
Providing and Constructing Temporary Earth Island (Assuming depth of water 1.0 m and height of island to be 1.25 m including Royality for earth

2

83629

167259.18

... More
Pile Cap in RCC M-35 (Using Batching Plant, Transit Mixer and Concrete Pump)

385.55

8592

3312842.23

... More
PROTECTION WORK

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.