Rural Works Department Tender

... More
The Rural Works Department has issued a formal invitation for competitive bids for Rural Road/bridge Construction And 05 Year Routine Maintenance Under Mukhyamantri Gramin Setu in Sheikhpura, Bihar, with an estimated contract value of Rs. 17,04,23,811. The bid opening date for this tender is 01-05-2025 and the last date for bid submission is 09-05-2025. Interested bidders for Rural Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2025
Closing Date9 May 2025
Tender Amount₹ 17,04,23,811 
Notes
Download

Costs

Summary

Rural Road/bridge Construction And 05 Year Routine Maintenance Under Mukhyamantri Gramin Setu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

600

241

144642

... More
Add GST 18%

1

7478778

7478778.24

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

118.44

70585

8360190.44

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

3

10836

32509.71

... More
Add labour Cess 1%

1

135925

135925.82

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

16.9

13864

234302.11

... More
Total Cost for 4th Year Maintenance Works

1

38808

38808

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specificationi) Upto 5m height (Using Concrete Mixer)

193.45

7486

1448253.75

... More
ii) 3m to 6m depth

106.72

489

52251.18

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

170.71

944

161213.4

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

84.15

2718

228762.62

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

8492

241

2047166.44

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

561

52

29469.33

... More
Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303.

75.21

4605

346370.63

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

20

723

14460

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

185.35

944

175038.98

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

14.94

70801

1057776.05

... More
Total Cost for 4th Year Maintenance Works

1

45021

45021

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

314.63

244

76876.69

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

24.16

72377

1748631.46

... More
gram kathari me agency murarpur thothi nadi par kshatgrasth pul

-

-

-

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

25.35

288

7321.08

... More
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

1122

18

20330.64

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Add Seignorage Fee

1

149575

149575.98

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.i) Upto 3m depth

664.29

412

273886.77

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.i) Upto 3m depth

355.02

412

146374.75

... More
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

848.75

18

15379.35

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

231439.2

-

201352.1

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.II. PCC Grade M-15 (Levelling Course for Pile Cap)

30.25

6595

199519.02

... More
dharnoul mushahari se kariho path me ratoiya ndi pul

-

-

-

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row (2 ROW)

37.5

7046

264249.75

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

156

186

29092.44

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row (2 ROW)

37.5

7046

264249.75

... More
Add GST 18%

1

37520

37520.28

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

30

723

21690

... More
Add Seignorage Fee

1

72193

72193.17

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

426.95

2217

946774.43

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

20

723

14460

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

20

711

14220

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

1122

52

58938.66

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

40

723

28920

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

3149

241

759129.43

... More
Add labour Cess 1%

1

1765

1765.19

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

101.9

2139

217999.77

... More
Total Cost for 1st Year Maintenance Work

1

30264

30264

... More
Add labour Cess 1%

1

2179

2179.19

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.09

73254

6592.89

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

160.08

2933

469639.5

... More
Add GST 18%

1

2446664

2446664.85

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

314.63

244

76876.69

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

20

711

14220

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

180

186

33568.2

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

840

241

202498.8

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

25.35

405

10290.58

... More
R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech SpecificationPile Cap in RCC M-30

465.42

7176

3340021.47

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

54.6

2933

160184.39

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC)

338

1649

557571.56

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row (2 ROW)

37.5

7046

264249.75

... More
Total Cost for 5th Year Maintenance Works

1

31912

31912

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

32

1393

44604.8

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading II -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

37.5

1686

63255.75

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

561

52

29469.33

... More
Total Cost for 4th Year Maintenance Works

1

36741

36741

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

197.66

2131

421229.27

... More
Total Cost for 5th Year Maintenance Works

1

53067

53067

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load1.2 m Dia Pile

1

350000

350000

... More
Add labour Cess 1%

1

196921

196921.21

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5II. RCC M-30

183.6

8453

1552020.37

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

33.8

405

13720.77

... More
Total Cost for 2nd Year Maintenance Works

1

23268

23268

... More
Total Cost for 3rd Year Maintenance Works

1

35994

35994

... More
Add Seignorage Fee

1

159416

159416.75

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load1.2 m Dia Pile

1

350000

350000

... More
Providing and laying curtain walls complete as per drawing and technical specification Clause 1304.P.C.C grade M 15

329.01

6525

2146938.3

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

162.38

2131

346044.77

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

250.63

2217

555779.54

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

33.37

70801

2362649.73

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

156.71

2131

333961.55

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.II. PCC Grade M-15 (Levelling Course for Pile Cap)

36.52

6595

240873.87

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

81.05

70585

5720984.76

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

63.66

2718

173060.35

... More
Providing , laying and rolling of close graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm agreegates either using penetration grade bitumin or emulsion to reqired line grade , and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 80-100 KN static roller capacity , ifnished to required level and grades to be followed by seal coat of either Type A or Type B or Type as per Technical Specification clause 508

848.75

257

218332.45

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

95.76

2131

204072.22

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

31.12

72377

2252376.29

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

16.9

288

4880.72

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

1619.25

52

85059.2

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.II. PCC Grade M-15 (Levelling Course for Pile Cap)

23.98

6595

158164.17

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

16.97

12366

209852.55

... More
Total Cost for 2nd Year Maintenance Works

1

42107

42107

... More
Add GST 18%

1

23599

23599.8

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

42.08

2718

114394.9

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

181.93

1686

306883.16

... More
Total Cost for 5th Year Maintenance Works

1

38148

38148

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

3967

241

956324.69

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

20

711

14220

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

17.1

12366

211460.14

... More
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

561

18

10165.32

... More
Providing , laying and rolling of Close graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm agreegates either using penetration grade bitumin or emulsion to reqired line grade , and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 80-100 KN static roller capacity , ifnished to required level and grades to be followed by seal coat of either Type A or Type B or Type as per Technical Specification clause 508

1619.25

257

416535.87

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

103.06

70585

7274579.76

... More
Total Cost for 1st Year Maintenance Work

1

20552

20552

... More
Add GST 18%

1

5389517

5389517.83

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

198.71

944

187655.76

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

144

186

26854.56

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading II -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

52.5

1686

88558.05

... More
Add Seignorage Fee

1

121630

121630.58

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

437.15

2217

969393.24

... More
Total Cost for 5th Year Maintenance Works

1

46428

46428

... More
Add labour Cess 1%

1

369586

369586.68

... More
Budhauli Katari Path main tat nadi par pul nirman karya

-

-

-

... More
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

9.94

71344

709163.34

... More
IBackfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ) Sandy Material

192.64

944

181923.44

... More
ii) 3m to 6m depth

306.16

489

149899

... More
Providing , laying and rolling of Close graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm agreegates either using penetration grade bitumin or emulsion to reqired line grade , and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 80-100 KN static roller capacity , ifnished to required level and grades to be followed by seal coat of either Type A or Type B or Type as per Technical Specification clause 508

561

257

144311.64

... More
R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.Pile Cap in RCC M-30

305.69

7176

2193741.49

... More
R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.Pile Cap in RCC M-30

159.74

7176

1146351.75

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

24

1393

33453.6

... More
Add GST 18%

1

6652560

6652560.32

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

90709.8

-

78917.53

... More
Providing , laying and rolling of close graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm agreegates either using penetration grade bitumin or emulsion to reqired line grade , and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 80-100 KN static roller capacity , ifnished to required level and grades to be followed by seal coat of either Type A or Type B or Type as per Technical Specification clause 508

561

257

144311.64

... More
sheikhpura jila ke khakhra and kosara ke bich tati nadi par pul

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

41.49

72377

3002927.12

... More
Total Cost for 3rd Year Maintenance Works

1

41809

41809

... More
Add labour Cess 1%

1

299417

299417.66

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

6351

45477.81

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

600

241

144642

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

3

10836

32509.71

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

4.26

71344

303927.14

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

27.22

70585

1921347.38

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specificationi) Upto 5m height (Using Concrete Mixer)

167.13

7486

1251210.39

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.II. PCC Grade M-15 (Levelling Course for Pile Cap)

46.83

6595

308875.23

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

10

723

7230

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

6351

45477.81

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

600

241

144642

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

42.25

13864

585755.27

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC Work/RCC)

201

1649

331573.62

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

31.29

70801

2215382.38

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

62.34

2933

182891.85

... More
Add Seignorage Fee

1

796

796.05

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

109.38

2139

234002.1

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

184529.4

-

160540.58

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load1.2 m Dia Pile

1

350000

350000

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.II. 1200 mm Dia

240

15305

3673339.2

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

137619.6

-

119729.05

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

15.36

14019

215340.13

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

12

1393

16726.8

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading II -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

37.5

1686

63255.75

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

124

2933

363788.72

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

207.13

944

195607.36

... More
Add Seignorage Fee

1

164711

164711.48

... More
ii) From 5m upto 10m height (Using Concrete Mixer)

28.74

7567

217492.25

... More
ii) From 5m upto 10m height (Using Concrete Mixer)

46.06

7567

348562.73

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.1

73254

7325.44

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

1050.09

412

432952.11

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specificationi) Upto 5m height (Using Concrete Mixer)

126.87

7486

949805.91

... More
ii) From 5m upto 10m height (Using Concrete Mixer)

40.42

7567

305881.58

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load1.2 m Dia Pile

1

350000

350000

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

3

10836

32509.71

... More
Add GST 18%

1

3544581

3544581.76

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

33.8

288

9761.44

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading II -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

15

1686

25302.3

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specificationii) From 5m upto 10m height (Using Concrete Mixer)

11.86

7667

90936.91

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

34.88

14019

489001.56

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

16.97

12366

209852.55

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.i) Upto 3m depth

841.8

412

347074.14

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

156

186

29092.44

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

16.1

288

4649.68

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5II. RCC M-30

156

8453

1318710.12

... More
gram firangibigha ke nikat thathi nadipar pul

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

18.88

72377

1366480.21

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

13864

351453.16

... More
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing

12.07

71344

861126.91

... More
c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

348.33

1686

587570.01

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row (2 ROW)

37.5

7046

264249.75

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

37.97

70585

2680145.48

... More
Total Cost for 2nd Year Maintenance Works

1

33827

33827

... More
Add GST 18%

1

31773

31773.42

... More
Total Cost for 4th Year Maintenance Works

1

29096

29096

... More
Add GST 18%

1

32340

32340.6

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

45.02

14019

631159.69

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

27.26

14019

382172.66

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

93.36

2139

199729.72

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

180

186

33568.2

... More
II. 1200 mm Dia

784

15305

11999574.72

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

16.9

405

6860.39

... More
Total Cost for 4th Year Maintenance Works

1

47439

47439

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

18.15

72377

1313644.91

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.13

73254

9523.07

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

17.53

14019

245762.54

... More
Total Cost for 1st Year Maintenance Work

1

30351

30351

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

20

711

14220

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

8.45

405

3430.19

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

16

1393

22302.4

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

3

10836

32509.71

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

8.45

288

2440.36

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

6351

45477.81

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total).

1

150000

150000

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

22.26

70801

1576043.84

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

118.32

1686

199584.54

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

2092

241

504318.44

... More
Dismantling of existing structures, like culverts, bridge,retaining wall and other structures comprising of brick masonary including unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per technical specification clause 202. (Dry Brick Pitching or Brick Soling, Masonry work)

167

303

50716.23

... More
Dismantling of existing structures, like culverts, bridge,retaining wall and other structures comprising of brick masonary including unserviceable material and stacking the serviceable material with all lift and lead of 1000m as per technical specification clause 202. (Dry Brick Pitching or Brick Soling, Masonry work)

380

303

115402.2

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

1258.5

244

307501.89

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

16.97

12366

209852.55

... More
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

561

18

10165.32

... More
Providing and laying of PCC M15 levelling course 100mm thick below the pile cap.II. PCC Grade M-15 (Levelling Course for Pile Cap)

12.54

6595

82709.7

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.II. 1200 mm Dia

700

15305

10713906

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.25

73254

18313.6

... More
Providing , laying and rolling of Close graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm agreegates either using penetration grade bitumin or emulsion to reqired line grade , and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 80-100 KN static roller capacity , ifnished to required level and grades to be followed by seal coat of either Type A or Type B or Type as per Technical Specification clause 508

1122

257

288623.28

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

82.32

2217

182547.07

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

114.18

2139

244270.98

... More
R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.Pile Cap in RCC M-30

321.17

7176

2304831.54

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row (2 ROW)

37.5

7046

264249.75

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

33.8

13864

468604.21

... More
Add labour Cess 1%

1

1311

1311.1

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

8

1393

11151.2

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

5491

241

1323715.37

... More
ii) From 5m upto 10m height (Using Concrete Mixer)

81.82

7567

619179.4

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specificationii) From 5m upto 10m height (Using Concrete Mixer)

16.67

7667

127817.73

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

16.97

12366

209852.55

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

96.92

2933

284341.96

... More
Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

1619.25

18

29340.81

... More
Add Seignorage Fee

1

1050

1050.74

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.i) Upto 3m depth

1019.31

412

420261.51

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5II. RCC M-30

244.8

8453

2069360.5

... More
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specificationi) Upto 5m height (Using Concrete Mixer)

158.3

7486

1185105.04

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

236.64

1686

399169.08

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

118.32

1686

199584.54

... More
Total Cost for 3rd Year Maintenance Works

1

35334

35334

... More
Add Seignorage Fee

1

795

795.77

... More
Add labour Cess 1%

1

2084

2084.46

... More
Providing and Fixing 'Logo' of Project informayory sign board with Logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5 m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600 mm,600 mm,600 below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12SWG steel plate tube. All M.S will be stove enameled on both sides. Lettering and printing arrows, border etc, will be painted with ready mixed synthetic enamer paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 abd Annexure 1700.1.

3

10836

32509.71

... More
Providing and constructing one span service road to reach island location from one pier location to another pier location including Royality for earth @ Rs. 225.00 per m for service Road.

54.12

4008

216920.54

... More
Total Cost for 3rd Year Maintenance Works

1

43614

43614

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 .

240

241

57856.8

... More
Granular Sub-base with Well Graded Material (Table 400.1) Grading II -Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

37.5

1686

63255.75

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

16.1

405

6535.63

... More
Add Seignorage Fee

1

880

880.39

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.II. 1200 mm Dia

550

15305

8418069

... More
Providing and laying filter media with granular crushed aggregates (Jhama Metal) as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

105.91

2139

226578.56

... More
Add labour Cess 1%

1

1796

1796.7

... More
R.C.C. grade M 30 in Pile Foundation complete as per Dwg & Tech Specification.Pile Cap in RCC M-30

385.55

7176

2766845.6

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specificationii) From 5m upto 10m height (Using Concrete Mixer)

7.06

7667

54132.76

... More
Total Cost for 1st Year Maintenance Work

1

40749

40749

... More
Total Cost for 2nd Year Maintenance Works

1

32980

32980

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

42.08

2718

114394.9

... More
Total Cost for 5th Year Maintenance Works

1

41624

41624

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

121.44

2718

330135.85

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

20

711

14220

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specificationii) From 5m upto 10m height (Using Concrete Mixer)

21.46

7667

164545.19

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

519.06

2217

1151031.12

... More
Add labour Cess 1%

1

415487

415487.68

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.14

73254

10255.61

... More
Add Seignorage Fee

1

880

880.71

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5II. RCC M-30

117.21

8453

990807.78

... More
Add GST 18%

1

39225

39225.42

... More
Total Cost for 2nd Year Maintenance Works

1

35780

35780

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

6351

45477.81

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5II. RCC M-30

95.5

8453

807287.29

... More
Total Cost for 3rd Year Maintenance Works

1

26282

26282

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

629.25

244

153750.95

... More
Total Cost for 1st Year Maintenance Work

1

32469

32469

... More
ii) 3m to 6m depth

96.8

489

47394.25

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

7.16

6351

45477.81

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.

629.25

244

153750.95

... More
b) Routine pile load test on pile for 1.5 times the design load specified in Drawings1.2 m Dia Pile (2% of piles in total).

1

150000

150000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.