The Rural Works Department has issued a formal invitation for competitive bids for Construction And 05 Year Routine Maintenance Work For Rural Road/bridge in Katihar, Bihar, with an estimated contract value of Rs. 11,99,41,060. The bid opening date for this tender is 01-05-2025 and the last date for bid submission is 09-05-2025. Interested bidders for Rural Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Works Department Tender

Works
Bridge Construction
Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2025
Closing Date9 May 2025
Tender Amount₹ 11,99,41,060 
Notes
Download

Costs

Summary

Construction And 05 Year Routine Maintenance Work For Rural Road/bridge

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF HL RCC BRIDGE KOSHI DHAR PAR BHADIAYA TOLA ROAD CHAINEJ 850M PAR UCHHYA STARIYA BRIDGE NIRMAN

-

-

-

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

33.8

9780

330582.59

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

70.66

3214

227166.95

... More
Seigniorage Fee

1

10550

10550.18

... More
Tack coat :- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

886.94

19

16913.95

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings 1.2 m Dia Pile

1

150000

150000

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

132

140

18536.76

... More
Maintainance for 1st year

1

54240

54240

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load b) Routine pile load test on pile for 1.5 times the design load specified in Drawings 1.2 m Dia Pile (2% of piles in total).

1

125000

125000

... More
Providing and laying of PCC M15 levelling course 150mm thick below the pile cap. II. PCC Grade M-15 (Levelling Course)

29.16

6670

194498.37

... More
(I)Providing and Fixing 'Logo' of PMGSY Project Or Maintenance Board

2

7500

15000

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

6277

55680.27

... More
Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5

1133.34

241

273542.94

... More
Maintainance for 4th year

1

102016

102016

... More
(I)Providing and Fixing 'Logo' of PMGSY Project Or Maintenance Board

2

7500

15000

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

19.52

12614

246236.41

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading I Material

191.58

3021

578803.41

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

403.69

3335

1346564.51

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

30

48594

1457832.9

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Construction of Subgrade and Earthen Shoulders

853.14

251

214760.93

... More
LABOUR CESS @ 1 % (IN LACS) =

1

390301

390301.57

... More
Providing & Fixing 20 mm thk compressible fiber board in expansion joint complete as per drawing and specification

50.7

291

14780.06

... More
Maintainance for 5th year

1

155197

155197

... More
Providing Steel Liner 6 mm thick as per Detailed Drawing.

13.65

90773

1239055.95

... More
Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5

1888.38

241

455779.4

... More
Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.3

73254

21976.31

... More
Seigniorage Fee

1

12915

12915.36

... More
Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 60% of Excavated material

348.21

302

105493.7

... More
Maintainance for 3rd year

1

116303

116303

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

102.54

3186

326741.66

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

45.9

3021

138673.54

... More
GST @ 18% (IN MAINS COST& L.C1%& S.F10%) =

1

80155

80155.8

... More
Providing Steel Liner 6 mm thick as per Detailed Drawing.

26.81

90773

2433632.98

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

37.78

7098

268165.08

... More
Maintainance for 2nd year

1

70166

70166

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . Balance quantity

6144.43

241

1483019.62

... More
Tack coat :- Providing and applying tack coat with bitumen emulsion (RS ) using emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503.

1083.09

19

20654.53

... More
P.C.C. M-15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specificatios Clauses 800 & 1211.

8.87

6277

55680.27

... More
Reinforced Cement Concrete M-30 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

19.52

12614

246236.41

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

221.31

3186

705199.89

... More
Clearing and Grubbing Road Land (By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

0.23

73254

16848.51

... More
LABOUR CESS @ 1 % (IN LACS) =

1

5815

5815.11

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load a) Initial Load Test on test pile for 2.5 times the design load specified in Drawings 1.2 m Dia Pile

1

150000

150000

... More
GST @ 18% (IN MAINS COST& L.C1%& S.F10%) =

1

108043

108043.38

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

108

140

15166.44

... More
Maintainance for 4th year

1

135749

135749

... More
Providing and Constructing Temporary Island 8 m diameter for Construction of Pile Foundation. Assuming depth of water 4.0 m and height of island 4.5 m.

2

474063

948127.78

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i) Upto 3m depth

851.57

412

351102.31

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

40

1198

47924.8

... More
Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

58.77

15251

896332.42

... More
Providing & Fixing 20 mm thk Premoulded filler joint in expansion joint for fixed ends of simply supported span not exceding 10m to cater for the horizontal movement up to 20mm covered with selant complete as per drawing and specification

50.7

338

17147.25

... More
GST @ 18% (IN CONS COST& L.C1%& S.F10%) =

1

7150434

7150434.84

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

50.7

9780

495873.89

... More
Providing and Constructing Temporary Island 8 m diameter for Construction of Pile Foundation. Assuming depth of water 4.0 m and height of island 4.5 m.

4

474063

1896255.56

... More
GST @ 18% (IN CONS COST& L.C1%& S.F10%) =

1

10957512

10957512.06

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

64.63

73558

4754092.96

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. Pile Cap in RCC M-35

319.47

7840

2504820.51

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. II. 1200 mm Dia

552

17014

9392097.84

... More
Drainage Spouts complete as per drawing and technical specifications Clause 1209

24

1198

28754.88

... More
Maintainance for 5th year

1

117942

117942

... More
Mix Seal Surfacing:- Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

1083.09

244

264306.45

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.Road Marking On

46.38

830

38506.53

... More
Providing and fixing of semi reflective cautionary , mandatory and informatory sign board as per IRC :67 made of 1.5 mm thick MS steel duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per clause 1701.3.9 of MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg sheet tube firmly fixed to the ground by mean of properly designed foundation with M15 grade cement concrete 450x450x600 mm ,600mm below ground level as per approved drawing clause 1701.2.2. 900 mm equilateral & triangle , OR

2

1922

3844.9

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II. RCC M-35

246.1

9322

2294245.1

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

62.95

7098

446823.51

... More
Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

36.99

15251

564154.09

... More
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. II. 1200 mm Dia

840

17014

14292322.8

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in superstructrue complete as per drawings and technical specification Clauses 1002, 1010 & 1202

38.41

73558

2825386.21

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. WBM Grading 3 (By Mechanical Means)

66.52

4082

271554.6

... More
(III)Providing & Fixing of LOGO of "Citizen Information Board"

1

9500

9500

... More
Providing & Fixing 20 mm thk Premoulded filler joint in expansion joint for fixed ends of simply supported span not exceding 10m to cater for the horizontal movement up to 20mm covered with selant complete as per drawing and specification

33.8

338

11431.5

... More
Providing and fixing of semi reflective cautionary , mandatory and informatory sign board as per IRC :67 made of 1.5 mm thick MS steel duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per clause 1701.3.9 of MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg sheet tube firmly fixed to the ground by mean of properly designed foundation with M15 grade cement concrete 450x450x600 mm ,600mm below ground level as per approved drawing clause 1701.2.2. 900 mm equilateral & triangle , OR

2

1922

3844.9

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

34.7

71780

2490795.84

... More
Construction of Embankment with material obtained from borrow pits with a lift upto 1.5 m , transporting to the site spreading , grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 . Balance quantity

7983.86

241

1926984.45

... More
Seigniorage Fee

1

464940

464940.93

... More
Provision of an Reinforced cement concrete crash barrier at the bridge decks& approaches to bridge structures constructed with Rein forced Cement Concrete With HYSD reinforcement confirming MoRT&H Specification and as per details given IRC-5 including dowel bars ,expansion joints filled with pre-moulded asphalt filler board etc.. and approved drawing and at locations directed by the Engineer ,all as specified .

208.96

5464

1141803.41

... More
(III)Providing & Fixing of LOGO of "Citizen Information Board"

1

9500

9500

... More
LABOUR CESS @ 1 % (IN LACS) =

1

598120

598120.06

... More
Maintainance for 2nd year

1

96854

96854

... More
CONSTRUCTION OF RCC HL BRIDGE AT KOSHI DHAR PAR BHDAIYA TOLA ROAD CHAINEJ 1210 PAR UCHHYA STARIYA BRIDGE NIRMAN

-

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the bridge decks& approaches to bridge structures constructed with Rein forced Cement Concrete With HYSD reinforcement confirming MoRT&H Specification and as per details given IRC-5 including dowel bars ,expansion joints filled with pre-moulded asphalt filler board etc.. and approved drawing and at locations directed by the Engineer ,all as specified .

131.52

5464

718654.21

... More
Providing and laying of PCC M15 levelling course 150mm thick below the pile cap. II. PCC Grade M-15 (Levelling Course)

43.74

6670

291747.55

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

76.48

3021

231062.14

... More
R.C.C. grade M 35 in Pile Foundation complete as per Dwg & Tech Specification. Pile Cap in RCC M-35

479.2

7840

3757191.56

... More
Providing and laying reinforced cement concrete in superstructure complete as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II. RCC M-35

410.16

9322

3823679.69

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Construction of Subgrade and Earthen Shoulders

691.8

251

174146.81

... More
Mix Seal Surfacing:- Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

886.94

244

216439.97

... More
LABOUR CESS @ 1 % (IN LACS) =

1

4304

4304.55

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

145.5

71565

10412724.96

... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

18

48594

874699.74

... More
Maintainance for 3rd year

1

86091

86091

... More
primer coat :- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

886.94

55

49189.69

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

123.6

933

115332.4

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. WBM Grading 3 (By Mechanical Means)

81.23

4082

331605.23

... More
primer coat :- Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

1083.09

55

60068.17

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification ii) From 5m upto 10m height (Using Concrete Mixer)

41.66

8381

349160.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i) Upto 3m depth

580.35

412

239278.31

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification i) Upto 5m height (Using Concrete Mixer)

149.37

8300

1239871.08

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings 1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
R.C.C. grade M-40 in Substructure complete as per Dwg & Tech Specification ii) From 5m upto 10m height (Using Concrete Mixer)

13.9

8636

120043.6

... More
Providing & Fixing 20 mm thk compressible fiber board in expansion joint complete as per drawing and specification

33.8

291

9853.38

... More
Construction of embankment with approved material deposited from road way cutting and excavation from drain and foundation of other structures and excavated with an average lead of 50 m graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 60% of Excavated material

510.94

302

154794.38

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification i) Upto 5m height (Using Concrete Mixer)

110.62

8300

918220.12

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

22.97

71780

1648806.35

... More
Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302

698.83

3335

2331045.3

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Sandy Material

171.28

933

159823.08

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading I Material

233.95

3021

706812.08

... More
Carrying out load test on any pile as per standard procedure laid down in the IS:2911 specification including construction of test cap, dismantling the cap after test and cleaning the site and maintaining complete records of load c) Horizontal pile load test on pile for 1.5 times the design load specified in Drawings 1.2 m Dia Pile (2% of piles in total) .

1

100000

100000

... More
Seigniorage Fee

1

304178

304178.54

... More
R.C.C. grade M-40 in Substructure complete as per Dwg & Tech Specification ii) From 5m upto 10m height (Using Concrete Mixer)

19.44

8636

167888.31

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.Road Marking On

56.63

830

47016.49

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

94.42

3214

303553.69

... More
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification ii) From 5m upto 10m height (Using Concrete Mixer)

86.23

8381

722710.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.