Airports Authority Of India Tender

With BidAssist, you can search for multiple business options for RWD Bihar tenders, RCD Bihar tenders, and any other e tender Bihar government is inviting bids for. Such Bihar tenders are posted on the eprocurement Bihar website, and on this page, you will get consolidated lists of Bihar tenders that can be sorted based on authority, department, city, and more.

Airports Authority Of India - AAI Tender

Works
Civil And Construction
Electronics Equipment
Electrical and Electronics
Eprocure
Opening Date26 Sep 2024
Closing Date20 Nov 2024
Tender Amount₹ 6,65,85,00,000 
Notes
Download

Costs

Summary

Development Of New Civil Enclave At Bihta Sh Construction Of New Integrated Terminal Building, Utility Building, Elevated Road Etc On Epc Mode

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Operational and Service Charges for maintaining of all assets (All civil works but excluding horticulture works) constructed under the project for 07 years including 2 years for Defect liability period.

-

-

-

... More
1st Year (During DLP)

1

-

-

... More
2nd Year (During DLP)

1

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
Annual Repair works including preventive maintenance for 5 years after Defect liability period of 2 years (Civil Work) from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
Operational and Service Charges including preventive maintenance, annual maintenance and maintaining all horticulture works constructed under the project for 07 years.

-

-

-

... More
1st Year (DLP)

1

-

-

... More
2nd Year (DLP)

1

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
Providing manpower for Operation & Services of DG sets, UPS, Transformers, Substation equipments, Internal & external electrical installation, HVAC & BMS, Fire Fighting, Fire alarm System, WTP, STP, Solar, Water curtain system, RO system and all other Miscellaneous Electrical & Mechanical equipments and systems provided under the EPC Contract as per standard OEM recommendations, maintenance schedules & practices as per manpower/ shift schedule mentioned in special conditions of contract.

-

-

-

... More
1st Year (DLP)

1

-

-

... More
2nd Year (DLP)

1

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of all Substation equipments, DG sets along with the UPS, Transformers & all other associated works after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of Internal and External Electrical Installations after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of all Lifts and escalators after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of entire high side and low side HVAC system, BMS, Pressurized mechanical ventilation system, Precision Air Conditioning System etc. associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of Fire alarm and Detection system, Fire fighting package, Gas flooding and associated works, Water curtain systems, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of Sewerage Treatment Plant and WTP with RO system, Hydropneumatic System and water pumping system, Automatic sliding doors, Air curtains and all other Miscellaneous Electrical & , Mechanical equipments and systems provided under the EPC Contract and its associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of Solar and its associated works, after DLP of Two years as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of AIRPORT SYSTEMS & SECURITY SYSTEMS including Flight Information Display System (FIDS), SCCTV, EPBAX and its associated system after 02 years DLP (02 years of DLP is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of IT SYSTEMS and its associated system after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of Active Networking Components after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of Passive Cabling Components after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All inclusive Comprehensive Maintenance of Data Center (Server Room) after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good IT works practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-

... More
All-inclusive Comprehensive Maintenance of PAVA, Car Calling and its associated system after 02 years DLP (DLP of 02 years is inclusive in construction cost) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified from 3rd to 7th Year after commissioning of project.

-

-

-

... More
1st Year (After DLP)

1

-

-

... More
2nd Year (After DLP)

1

-

-

... More
3rd Year (After DLP)

1

-

-

... More
4th Year (After DLP)

1

-

-

... More
5th Year (After DLP)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.