Water Resources Department Tender
... More
The WRD has issued a formal invitation for competitive bids for the Water Resources Department project, for Pro-siltation Measures To Protect Sukchar, Borobalu And Its Adjoining Areas From The Erosion Of River Brahmaputra. in South Salmara Mancachar, Assam, with an estimated contract value of Rs. 2,94,11,743. The bid opening date for this tender is 09-03-2024 and the last date for bid submission is 16-03-2024. Interested bidders for Water Resources Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Water Resources Department - WRD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Mar 2024
Closing Date16 Mar 2024
Tender Amount₹ 2,94,11,743
Costs
EMD
₹ 5,88,235Document Cost
₹ 3,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DoWR_36022_2Bid Award Id
ViewTender No
S SALMARA/2023-24/NIDA/ITender Authority
Water Resources Department ViewPurchaser Address
-Website
http://https://waterresources.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Spreading of earth stacks over the crest and slope of embankment and places as directed in uniform layer of 22 cm. thick including breaking clods, dressing, ramming etc. complete where necessary including dressing of the embankment, etc. complete as directed.
1125
-
-
... More
Earthwork in bank trimming to the designed section /slope by mechanical means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.
6455.04
-
-
... More
Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10 m × 0.10 m × 3.00 m with M - 30 grade of cement concrete conforming to IS 1343:2012 using super-plasticizer @1.2 lit/bag of cement with graded broken coarse aggregates up to 20 mm size down conforming to IS 10262:2009 & IS 456:2000 and reinforced with 4 nos. of 4 mm dia. high tensile steel wire cable/strand with necessary cover and 4 mm high tensile stirrups at 250 mm C/C, in conformity with IS-6403:R2002 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia. at 50 cm inside from both ends in the same face and in either face of post another 2 nos. of holes of size 16 mm dia. at 65 mm inside from both ends including properly curing for 21 (Twenty one) days and carriage of porcupine members from factory to the stack yard within a distance up to 50 Km including loading, unloading & stacking complete as directed.
18144
-
-
... More
Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, erection of the Porcupine with 6 (Six) members properly, supply & fitting/fixing with 12 mm dia. 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m). Launching without boat
432
-
-
... More
Collection and supply of brick bats 10 - 40 mm size to work site including loading, unloading transportation and stacking in measurable stacks including sale tax, compensation if any, etc. complete as directed .
750
-
-
... More
Construction of whole Bholuka Bamboo double Screen with matured Bholuka Bamboo stacks 75 mm to 100 mm dia., placed at 30 cm clear apart (i.e. 40 cm C/C) driven 4.00 m to 4.50 m below ground and 3.0 m to 3.50 m above ground with hydraulic driving equipment including hire charge of equipment, cost of P.O.L. etc. and providing with 1 (One) row of horizontal half Jati bamboo kamies tied with galvanised wire of 16 G to 18 G etc. complete as directed.(Using Bhaluka Bamboo at the rate of 240.0 nos./Rm & Jati Bamboo at the rate of 9.60 nos./Rm)
1698
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements