The Soil Conservation Department has issued a formal invitation for competitive bids for Water Distribution Project At Nemujan In Sivasagar District Under Ridf-xxx in Jorhat, Assam, with an estimated contract value of Rs. 34,70,000. The bid opening date for this tender is 05-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 69,400Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCD_43247_6Bid Award Id
ViewTender No
NoTender/ NIT/Pt/2024-25/4970Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Manual method should be adopted where machines
can not be deployed due to site condition)
12795.9
144
-
... More
Hume Pipe Culvert
-
-
-
... More
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material
56.99
159
-
... More
Providing & laying Reinforced cement concrete in super structure as per drawing & technical specification clauses 800, 1205.4& 1205.5 II) RCC Grade M 25 a) height up to 5 m
19.17
9138
-
... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
1.48
6357
-
... More
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material
56.99
159
-
... More
Steel Pipe 50 MM extranal dia for railing
4.8
155
-
... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
1.48
6357
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
(i) With TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (Fe500 grade) rebar
1.15
67687
-
... More
Signboard
-
-
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
(i) With TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (Fe500 grade) rebar
1.15
67687
-
... More
Steel Pipe 50 MM extranal dia for railing
4.8
155
-
... More
Providing & laying Reinforced cement concrete in super structure as per drawing & technical specification clauses 800, 1205.4& 1205.5 II) RCC Grade M 25 a) height up to 5 m
19.17
9138
-
... More
Providing & laying Reinforced cement concrete in super structure as per drawing & technical specification clauses 800, 1205.4& 1205.5 II) RCC Grade M 25 a) height up to 5 m
19.17
9138
-
... More
Plastering
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works
75.3
152
-
... More
Laying Brick Soling layer of prepared Sub-Grade with Brick on end edging according to lines , graded & cross section shown on the drawing filling joint with sand & earth spreding 25 MM thrik layer of earth over brick soling watering & rolling the seen with three wheel rod roller 80-100 KN as per thchnical specification clauses 412.
14.8
755
-
... More
Providing fitting, fixing of Sluice Gate (1.30 m x 2.40 m)
1
185604
-
... More
Construction R.C.C Box Culvert with a Sluice gate (PART-II)
-
-
-
... More
Steel Pipe 50 MM extranal dia for railing
4.8
155
-
... More
Sand Filling in Foundation Trenches as per Drawing and Technical Specification
1.48
1731
-
... More
Plastering
Plastering with cement mortar ( 1 : 3 ) on R.C.C. works
75.3
152
-
... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
1.48
6357
-
... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.
(i) With TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) (Fe500 grade) rebar
1.15
67687
-
... More
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material
56.99
159
-
... More
Providing fitting, fixing of Sluice Gate (1.30 m x 2.40 m)
1
185604
-
... More
Construction R.C.C Box Culvert with a Sluice gate (PART-III)
-
-
-
... More
Sand Filling in Foundation Trenches as per Drawing and Technical Specification
1.48
1731
-
... More
Providing fitting, fixing of Signboard
1
13711
-
... More
Site Clearance
1
5081
-
... More
Providing fitting, fixing of Hume pipe in position at the work site.
1. 45 cm dia H/P Culvert of NP-3 full length for both side of the shoulder bund
15
10115
-
... More
Sand Filling in Foundation Trenches as per Drawing and Technical Specification
1.48
1731
-
... More
Laying Brick Soling layer of prepared Sub-Grade with Brick on end edging according to lines , graded & cross section shown on the drawing filling joint with sand & earth spreding 25 MM thrik layer of earth over brick soling watering & rolling the seen with three wheel rod roller 80-100 KN as per thchnical specification clauses 412.
14.8
755
-
... More
Construction R.C.C Box Culvert with a Sluice gate (PART-I)
-
-
-