The Soil Conservation Department has issued a formal invitation for competitive bids for Construction Of Water Harvesting And Water Distribution Channel At Umrengti Under Ridf-xxx in West Karbi Anglong, Assam, with an estimated contract value of Rs. 34,81,500. The bid opening date for this tender is 05-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Soil Conservation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date5 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 34,81,500
Costs
EMD
₹ 69,630Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCD_43247_4Bid Award Id
ViewTender No
NoTender/ NIT/Pt/2024-25/4970Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
2.06
67687
-
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
14.82
1959
-
... More
Water Harvesting Structure
-
-
-
... More
Laying brick soling layer on prepared sub-grade with brick on end edging
according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
415
755
-
... More
Installation of Sign Board
1
18132
-
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
34.4
7877
-
... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
12.98
67687
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
118.83
159
-
... More
Water Distribution Channel
-
-
-
... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
41.5
7423
-
... More
Cost of Tubewell including installation
1
14280
-
... More
Construction of diversion channel to divert the flow of water in upstream of the proposed structure
150
192
-
... More
Filling in Diversion Channel
150
107
-
... More
Excavation in cutting in soil by manual means with lead upto 50.00m and as per technical specification
836.28
144
-
... More
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
124.02
152
-
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
134.88
7877
-