Soil Conservation Department Tender

... More
The Soil Conservation Department has issued a formal invitation for competitive bids for Integrated Water Harvesting Structure Cum Land Reclamation And Water Distribution Project Connecting To Kharkhowa (phase-ll) Under Ridf-xxx in Udalguri, Assam, with an estimated contract value of Rs. 49,75,500. The bid opening date for this tender is 05-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Soil Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 49,75,500 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC Works RCC Works in in sub structure complete as per drawing & technical specification and steel shuttering form work.

64.31

7877

-

... More
Supplying, fitting & placing TMT bar reinforcement in substructure complete as per drawing & technical specifications.

38.59

6768

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.

5480.76

271

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.

4385.3

24

-

... More
GULLY CONTROL PLUG

-

-

-

... More
Preparation of survice road to carry the materials to the project site.

24.07

271

-

... More
Boulder Apron Providing & laying boulder apron on the bed for protection against scour with stone boulders weighting not less than 40 kg each complete as per drawing & technical specifications.

32.88

1959

-

... More
RCC in substructure complete as per drawing and technical specification and steel shuttering formwork,curing completed as directed.

0.28

7877

-

... More
Laying brick soling layeron prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412

48.1

755

-

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.

5480.76

271

-

... More
RCC BOX CULVERT

-

-

-

... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

4.81

7018

-

... More
Earthwork in fill of diversion channel

86.3

107

-

... More
Steel Pipe 50mm external dia for Railing

28

155

-

... More
EARTHEN PERIPHERY BUND ON THE BANK OF THE STREAM RIGHT SIDE

-

-

-

... More
Plain Cement Concrete Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40mm normal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

9.92

6357

-

... More
Plastering of Walls Plastering with cement mortar ( 1 : 3 ) on R.C.C. works as per technical specifications.

106.72

152

-

... More
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)

0.62

55808

-

... More
Diversion Channel Construction of Diversion Channel

86.3

192

-

... More
Sand Filling in Foundation Sand Filling in Foundation Trenches as per Drawing and Technical Specification

4.96

1731

-

... More
Providing concrete for reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

49.4

7938

-

... More
Providing,fitting& fixing of granite plate including engraving letter writing.

1

9745

-

... More
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material..........Below GBL

280.7

159

-

... More
Sand filling in Foundation Trenches as per Drawing and Technical Specification

4.81

1731

-

... More
EARTHEN PERIPHERY BUND ON THE BANK OF THE STREAM LEFT SIDE

-

-

-

... More
Excavation for Structure Earth work in excavation of foundation for structures as per drawing & technical specification, including setting out, construction of shoring & bracing, removal of stumps & other deleterious matter, dressing of sides & bottom and backfilling in trenches with approved material..........Above GBL

235.14

145

-

... More
Clearing and grubbing drain including rank vegetation,grass,bushes,sapling etc and dispose of unserviceable materials outside the periphery of the area.(By manual means)

0.62

55808

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork insubstructure as per technical specification Clauses 613.4 & 1204

29.08

154

-

... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.

4385.3

24

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

40.89

134

-

... More
Supplying,fitting and placing TMT bar reinforcement.

0.27

6752

-

... More
Site preparation , cleaning and removing of debris etc.

1

2380

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materials.

0.3

145

-

... More
PCC 1:3:6 in foundation

0.03

6357

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.