Soil Conservation Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Soil Conservation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date18 Jan 2022
Closing Date8 Feb 2022
Tender Amount₹ 65,45,000
Costs
EMD
₹ 1,30,900Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SCD_24066_15Tender No
Tender/NIT/2021-22/4111 Date-13.01.2022Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PART A
-
-
-
... More
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone
aggregate 40 mm. nominal size mechanically mixed, placed in foundation and complete by vibration including curing etc.
10.37
-
-
... More
Preparation of site, Removal of mud & cleaning the jungle etc. complete as directed.
0.24
-
-
... More
Earth work in excavation of foundation, trenches including filling up the trenches & removal of surplus spoil after & other deleterious matter,
dressing of sides and bottom etc. without watering
317.3
-
-
... More
E/w. in filling for construction of Coffer Dam in front of head wall by head load with approved quality of soil with all lead & lift, ramming & compacting etc. as directed. leads and lift.
131.28
-
-
... More
Repidite Oil
1
-
-
... More
Cement plastering 12mm. thick in proper 1:3 including cleaning the surface & curing etc. complete as directed.
273.12
-
-
... More
E/w. in excavation for making diversion channel including removing the spoil including dressing, grading etc.
177.21
-
-
... More
PART B
-
-
-
... More
Supplying of Reinforcement (TMT) in position to reinforce Cement concrete work including cutting, banding, cranking with hooking, tying with two piles 0.9 mm.(20 S.W.G.) annealed wire as per specification etc. Completes as directed.
50.38
-
-
... More
Earth cutting in foundation of boulder revetment
160
-
-
... More
Providing R.C.C. work with R.C.C. grade M.20 in foundation, abatement of
head wall, extension head wall, Apron, side wall of the spill way with gravel 6mm. to 20 mm. size reinforced with proper reinforcement as per design & specification as directed.
83.97
-
-
... More
Cost of Rapidite Oil for quick setting of R.C.C. work.
8
-
-
... More
Construction of earthen guide bund/periphery bund with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
161.7
-
-
... More
Plastering with cement mortar (1:3) on brick work in sub-structure as per technical specification.
1020.3
-
-
... More
Brick masonry work in cement mortar 1:3 foundation excluding plastering etc. complete as directed.
322.2
-
-
... More
Cost of Sign Board with erection cost
1
-
-
... More
E/w. in excavation for making diversion channel including removing the spoil including dressing, grading etc.
292.5
-
-
... More
E/w. in filling in front of head wall, extension head wall by the side of side wall by head load with approved quality of soil with all lead & lift ramming & compacting etc.
343.81
-
-
... More
Turfing with sods :-
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other location etc. complete as directed.
566.28
-
-
... More
Cost of Sign Board with erection cost
1
-
-
... More
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone
aggregate 40 mm. nominal size mechanically mixed, placed in foundation and complete by vibration including curing etc.
96.66
-
-
... More
Construction of earthen guide bund/periphery bund with approved soil/material obtained from borrow pits with all lift & leads, transporting to site, Spreading, grading to required slope etc. complete as directed.
456.75
-
-
... More
Supplying, fitting, fixing of reinforcement in foundation slab etc. complete as direction.
20.53
-
-
... More
Earth work in excavation of foundation of brick channel including setting out, construction of storing and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom back filling the excavated earth to the extent etc. complete as directed.
429.84
-
-
... More
(Boulder laid without wire crates)
Providing & laying boulder apron on river bed in front of structure for protection against scouring with stone boulder weighing not less than 40Kg each, complete as per drawing & technical specification.
260
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements