Soil Conservation Department Tender

... More
The Soil Conservation Department has issued a formal invitation for competitive bids for Erosion Protection Project At Betbari Under Ridf Xxviii During 2022-23 in Baksa, Assam, with an estimated contract value of Rs. 1,13,01,768. The bid opening date for this tender is 13-02-2024 and the last date for bid submission is 22-02-2024. Interested bidders for Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Soil Conservation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date13 Feb 2024
Closing Date22 Feb 2024
Tender Amount₹ 1,13,01,768 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Suppying, fitting and fixing iron pipe for foot bridge railing

58.8

-

-

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications

44.72

-

-

... More
Nakardara GCP at Khunthamari (Structure - 3)

-

-

-

... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.

9.84

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means

413.77

-

-

... More
Name of the Project: Puhumara RTP at Betbari (Structure - 2)

-

-

-

... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.

0.64

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

51.45

-

-

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications

46.73

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means B) Below GBL

90.79

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

5.4

-

-

... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.

11.93

-

-

... More
Supplying, Fitting and Fixing Hand Tube Well

1

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means B) Below GBL

94.78

-

-

... More
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign (a) Extra lead for each 30cm and part thereof beyond 60m up to a lead 200m.

712.5

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

5.4

-

-

... More
Dahdara Gully Control cum Water Harvesting Project (Structure - 1)

-

-

-

... More
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.

0.64

-

-

... More
Providing Signboard inscribe in Marble/ Tiles

1

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means

15.84

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications

164.28

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications

2194.5

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction

9

-

-

... More
Suppying, fitting and fixing iron pipe for foot bridge railing

58.8

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction

117.72

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications

404.97

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means A) Above GBL

566.26

-

-

... More
Providing Signboard inscribe in Marble/ Tiles

1

-

-

... More
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

67.35

-

-

... More
Providing Signboard inscribe in Marble/ Tiles

1

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction

9

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means A) Above GBL

343.91

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means

1539

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means

15.84

-

-

... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications

307.8

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means

360.94

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.