Soil Conservation Department Tender
... More
The Soil Conservation Department has issued a formal invitation for competitive bids for Water Harvesting And Distribution Channel At Sam Bey, Borkok Under Ridf-xxx in West Karbi Anglong, Assam, with an estimated contract value of Rs. 34,67,950. The bid opening date for this tender is 05-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Soil Conservation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 34,67,950
Costs
EMD
₹ 69,359Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCD_43247_3Bid Award Id
ViewTender No
NoTender/ NIT/Pt/2024-25/4970Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
36.49
7877
-
... More
Water Harvesting Structure
-
-
-
... More
Site Preparation
1
595
-
... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days.
3.18
6357
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
492.26
145
-
... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
17.39
6768
-
... More
Furnishing and laying of the live sods of perennial turf forming grass on embankment slopes or as directed
763.2
24
-
... More
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
128.68
152
-
... More
Clearing & grubbing road land including uprooting vegetation, grass bushed, saplings, tree etc. as per directed
0.02
55808
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
62.93
145
-
... More
Clearing & grubbing road land including uprooting vegetation, grass bushed, saplings, tree etc. as per directed
0.05
55808
-
... More
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
6.6
1959
-
... More
Earthen Bundh
-
-
-
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
29.48
7877
-
... More
Providing and laying of filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to the thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification
21.08
2183
-
... More
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
71.31
152
-
... More
Earthwork by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning and as per directed
380.4
107
-
... More
Installation of Sign Board
1
14280
-
... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
21.98
6768
-
... More
Installation of Sign Board
1
14280
-
... More
Installation of Sign Board
1
13440
-
... More
Cost of Tubewell including installation
1
14280
-
... More
RCC Box Culvert
-
-
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50m , transportation to site , spreading, gradingto required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical specification Clause 301.5
708.37
271
-
... More
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
327.55
755
-
... More
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
1005.13
152
-
... More
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
31.75
755
-
... More
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days.
4.7
6357
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
107.17
145
-
... More
Filling in Diversion Channel
150
107
-
... More
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
23.79
7877
-
... More
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
123.83
8406
-
... More
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
2.19
67687
-
... More
Water Distribution Channel
-
-
-
... More
Construction of diversion channel to divert the flow of water in upstream of the proposed structure
150
192
-