Public Works Roads Department Tender

... More
The PWRD has issued a formal invitation for competitive bids for the Public Works Roads Department project, for Construction Of Gwc (granular Wearing Course) Road Under Sopd-g For The Year 2024-25 In Hojai District Under Lumding Lac in Hojai, Assam, with an estimated contract value of Rs. 44,92,100. The bid opening date for this tender is 18-12-2024 and the last date for bid submission is 26-12-2024. Interested bidders for Public Works Roads Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Roads Department - PWRD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date18 Dec 2024
Closing Date26 Dec 2024
Tender Amount₹ 44,92,100 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Type B (First Class) Bedding ii) Laying (First Class) bedding on well compacted approved granular material as per Clause 1105 (ii)

5.22

1558

-

... More
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer.

7443.75

8

-

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

3.49

6036

-

... More
Brick masonry work in cement mortar in substructure complete excepting pointingand plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 (ii) In 1:4 cement mortar

15.55

7983

-

... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (ii) Brick masonry in 1:4 cement mortar

23.05

7450

-

... More
Construction of Embankment with Material Obtained from Borrow Pits: Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (ii) From Private Land.

1973.1

258

-

... More
Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903

1500

83

-

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (ii) From Private Land

1195.13

339

-

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

50.17

146

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.