Indradhanush Gas Grid Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indradhanush Gas Grid Limited - IGGL Tender

Services
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date21 Nov 2023
Closing Date12 Dec 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Engaging An Agency For Survey Arc

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Population Density Index (PDI) Survey (including submission of report) Carrying out Population Density Index survey along the entire pipeline route as per specifications & instruction of Engineer-in-Charge/ Site Engineer, including but not limited to the following: a) Providing location class based on Population Density Index; b) Recording the location class along with chainages at change point of each location; c) Due consideration shall be given to the possibility of future development of the area; d) If future development may cause a change in location class, the same shall be taken into consideration while determining its location class.

37

-

-

... More
Soil Resistivity Surveys (including submission of report) Conducting soil resistivity surveys as per detailed scope enumerated in Special Conditions of Contract and tender specifications complete in all respects as follows including uploading all data on Owner's ArcGIS (ESRI) server. Conducting soil resistivity survey at intervals of 125 meters along the pipeline route as per the detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in Charge/Site Engineer.

37

-

-

... More
Soil Chemical Analysis Survey (including submission of report) Conducting soil chemical analysis survey for determination of PH value, Chemical analysis for cations i.e., calcium, magnesium, sodium, potassium and Anions i.e. Chloride, Sulphate, Sulphide, Carbonate, Bicarbonate, Nitrate, Phosphate, etc. as per specifications and direction of Engineer-in-Charge/Site Engineer & providing data in tabular form complete in all respect as per schedule including uploading all data on Owner's Arc GIS server along the entire pipeline route at an interval of 1 Km as per specification

37

-

-

... More
Soil Stratification Survey (including submission of report) Conducting Soil Stratification Survey for determining stratification of Soil/ rock as per detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in-charge/Site Engineer including providing the data in tabular form complete in all respect as per following schedule including uploading all data on Owner's ArcGIS server. "Along the pipeline route, including river crossings (excluding flowing river), by boring 100 mm dia. using auger type equipments up to a depth 2.5 m from ground/bed level or till rock is encountered, whichever is less, at an interval of 250 m and providing the results in tabular form as well as borelogs, ensuring atleast one borelog at the centre location of dry rivers, as per Specification and direction of Engineer-in-charge/Site Engineer. Note: The bank to bank width of flowing rivers shall be deducted from the total length for payment purpose, as payment for soil stratification at flowing river locations shall be under relevant item given below. "

37

-

-

... More
Cadastral Survey (Upto preparation of schedule u/s 3(1) of P&MP Act 1962) Carrying out Cadastral Survey, for laying cross country petroleum pipeline, obtaining/ procuring latest village maps from Revenue authorities (actual cost incurred on procurement to be reimbursed by owner on receipt of proof of payment), tracing/ scanning the same and storage in both hard and soft reproducible forms, plotting the pipeline route on village maps and marking on them the Intermediate Points (IPs) and Turning Points (TPs) of the surveyed route as staked on ground, identification of survey numbers of individual owners and plotting on village maps as per latest revenue records, preparation of field book and computation of area in each plot coming within limits of ROU corridor, collection of Jamabandi (the record of right holders) from revenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interim mutations, if any, and incorporation in Jamabandi and other works as per detailed scope of work specified in Special Conditions of Contract (SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additional pipeline ROW, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data (for Acquiring ROW of 20m width for new pipeline route or as directed by EIC). This is to be executed where Revenue Maps are available.

29.6

-

-

... More
Cadastral Survey (Upto preparation of schedule u/s 3(1) of P&MP Act 1962) Carrying out Cadastral Survey and measurement of each plot of affected landowner(s) falling within 20 meters RoU width for laying cross country natural gas pipeline, identification of ownership(s) and occupier of the affected land(s) with the support of Government Revenue department, Village Headmen and affected landowners, preparation of field book and computation of area in each affected plot, obtaining the signature of Landowner/village representative, Village Headmen, Revenue Field Officer, IGGL and Contractor representative in the Field report contenting the data of Village, Sub-Divisional/Block, District, name of affected landowner, area of affected land of the respective landowner, collection of interim mutations (if any), collection of Proof of Identification of affected landowner issued by Government (like Voter ID, Aadhar Card or Driving Licence), plotting of the pipeline route on newly surveyed cadastral/village maps to the scale 1:1000 showing plot boundaries with marking of Intermediate Points (IPS) and Turning Points (TPS) of the surveyed route as staked on ground, creation of survey numbers of individual affected plot(s)/owner(s) and plotting on village maps with reference chainage (or as per instruction by the Government Revenue department), obtaining the signature of Government Revenue department of the respective district for Record of Right holder(s), tracing/ scanning of newly surveyed cadastral Map of respective village, storage of document(s) and drawing(s) of identified RoU in both hard and soft reproducible forms and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) under P&MP Act 1962 for proposed pipeline route, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data for acquiring ROW of 20 m width for pipeline route." This is to be executed where Revenue maps are not available.

7.4

-

-

... More
Providing services for establishing RoU in ROW as per P&MP Act 1962 Providing services for establishing Right of users (ROU on Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including follow up for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notice, facilitating hearing & disposal of objections, preparation of schedule for 6 (1) Notification, follow-up for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6 (1) notices, entry of Gazette notification in village records, collection of land rates, calculation of land compensation payable & serving of compensation notice, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications to tender document and direction of Engineer- in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects integration of ROU details on Owner's Arc GIS server to obtain seamless geo-referenced data. For Acquiring ROW of 20 m width for newly proposed pipeline.

37

-

-

... More
Part-B: For Pipelines section having length 20.001 to 50 KM

-

-

-

... More
Desktop Study & Reconnaissance survey as per standard specifications (including submission of report) Carrying out Reconnaissance Survey of the pipeline route including desktop study followed by ground truth verification, evaluation of alternative routes, preparation of route maps, crossing details and submission of reports in three copies complete as per specifications and direction of Engineer-in-Charge/ Site Engineer (for new/ additional RoU).

54

-

-

... More
Detailed Engineering Survey (including submission of report) Carrying out Detailed Engineering Survey of the entire pipeline route, as per the detailed Scope of Work in Special Conditions of Contract (SCC) including but not limited to the following: Deploying Differential Global Positioning to provide DGPS control points at every 4 to 5 km interval based on WGS-84 UTM coordinate system; Deploying total stations for traverse control between DGPS stations; Establishing UTM Coordinates of all TPs, IPs and Flag control points and other important points as desired by the owner; Taking all survey measurements, readings required for Planimetry, Information & Feature capturing and levels with respect to MSL; Obtaining base maps from authorised source (having clearance from Ministry of Defence/ Survey of India) of all districts (20 km on both sides of ROW) and submission to owner; Preparation and submission of Route map, Profile map, Crossing drawing, Right of way planimetry (within 50m on either side of ROW), Alignment sheets etc.; Obtaining Seismic fault line data & plotting of fault lines on route maps, Alignment sheets as well as on ground; DGPS survey details of forest crossing in the pipeline route to be incorporated in the village maps. Collection of other details including all labour, material, equipment etc. complete in all respects as per specifications and direction of Engineer-in-Charge/ Site Engineer; Integrating all survey details and deliverables, including base maps, into owner's Arc GIS (ESRI) server to obtain seamless geo-referenced data.

54

-

-

... More
Population Density Index (PDI) Survey (including submission of report) Carrying out Population Density Index survey along the entire pipeline route as per specifications & instruction of Engineer-in-Charge/ Site Engineer, including but not limited to the following: a) Providing location class based on Population Density Index; b) Recording the location class along with chainages at change point of each location; c) Due consideration shall be given to the possibility of future development of the area; d) If future development may cause a change in location class, the same shall be taken into consideration while determining its location class.

54

-

-

... More
Soil Resistivity Surveys (including submission of report) Conducting soil resistivity surveys as per detailed scope enumerated in Special Conditions of Contract and tender specifications complete in all respects as follows including uploading all data on Owner's ArcGIS (ESRI) server. Conducting soil resistivity survey at intervals of 125 meters along the pipeline route as per the detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in Charge/Site Engineer.

54

-

-

... More
Soil Chemical Analysis Survey (including submission of report) Conducting soil chemical analysis survey for determination of PH value, Chemical analysis for cations i.e., calcium, magnesium, sodium, potassium and Anions i.e. Chloride, Sulphate, Sulphide, Carbonate, Bicarbonate, Nitrate, Phosphate, etc. as per specifications and direction of Engineer-in-Charge/Site Engineer & providing data in tabular form complete in all respect as per schedule including uploading all data on Owner's Arc GIS server along the entire pipeline route at an interval of 1 Km as per specification

54

-

-

... More
Soil Stratification Survey (including submission of report) Conducting Soil Stratification Survey for determining stratification of Soil/ rock as per detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in-charge/Site Engineer including providing the data in tabular form complete in all respect as per following schedule including uploading all data on Owner's ArcGIS server. "Along the pipeline route, including river crossings (excluding flowing river), by boring 100 mm dia. using auger type equipments up to a depth 2.5 m from ground/bed level or till rock is encountered, whichever is less, at an interval of 250 m and providing the results in tabular form as well as borelogs, ensuring atleast one borelog at the centre location of dry rivers, as per Specification and direction of Engineer-in-charge/Site Engineer. Note: The bank to bank width of flowing rivers shall be deducted from the total length for payment purpose, as payment for soil stratification at flowing river locations shall be under relevant item given below. "

54

-

-

... More
Cadastral Survey (Upto preparation of schedule u/s 3(1) of P&MP Act 1962) Carrying out Cadastral Survey, for laying cross country petroleum pipeline, obtaining/ procuring latest village maps from Revenue authorities (actual cost incurred on procurement to be reimbursed by owner on receipt of proof of payment), tracing/ scanning the same and storage in both hard and soft reproducible forms, plotting the pipeline route on village maps and marking on them the Intermediate Points (IPs) and Turning Points (TPs) of the surveyed route as staked on ground, identification of survey numbers of individual owners and plotting on village maps as per latest revenue records, preparation of field book and computation of area in each plot coming within limits of ROU corridor, collection of Jamabandi (the record of right holders) from revenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interim mutations, if any, and incorporation in Jamabandi and other works as per detailed scope of work specified in Special Conditions of Contract (SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additional pipeline ROW, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data (for Acquiring ROW of 20m width for new pipeline route or as directed by EIC). This is to be executed where Revenue Maps are available.

43.2

-

-

... More
Cadastral Survey (Upto preparation of schedule u/s 3(1) of P&MP Act 1962) Carrying out Cadastral Survey and measurement of each plot of affected landowner(s) falling within 20 meters RoU width for laying cross country natural gas pipeline, identification of ownership(s) and occupier of the affected land(s) with the support of Government Revenue department, Village Headmen and affected landowners, preparation of field book and computation of area in each affected plot, obtaining the signature of Landowner/village representative, Village Headmen, Revenue Field Officer, IGGL and Contractor representative in the Field report contenting the data of Village, Sub-Divisional/Block, District, name of affected landowner, area of affected land of the respective landowner, collection of interim mutations (if any), collection of Proof of Identification of affected landowner issued by Government (like Voter ID, Aadhar Card or Driving Licence), plotting of the pipeline route on newly surveyed cadastral/village maps to the scale 1:1000 showing plot boundaries with marking of Intermediate Points (IPS) and Turning Points (TPS) of the surveyed route as staked on ground, creation of survey numbers of individual affected plot(s)/owner(s) and plotting on village maps with reference chainage (or as per instruction by the Government Revenue department), obtaining the signature of Government Revenue department of the respective district for Record of Right holder(s), tracing/ scanning of newly surveyed cadastral Map of respective village, storage of document(s) and drawing(s) of identified RoU in both hard and soft reproducible forms and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) under P&MP Act 1962 for proposed pipeline route, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data for acquiring ROW of 20 m width for pipeline route." This is to be executed where Revenue maps are not available.

10.8

-

-

... More
Providing services for establishing RoU in ROW as per P&MP Act 1962 Providing services for establishing Right of users (ROU on Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including follow up for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notice, facilitating hearing & disposal of objections, preparation of schedule for 6 (1) Notification, follow-up for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6 (1) notices, entry of Gazette notification in village records, collection of land rates, calculation of land compensation payable & serving of compensation notice, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications to tender document and direction of Engineer- in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects integration of ROU details on Owner's Arc GIS server to obtain seamless geo-referenced data. For Acquiring ROW of 20 m width for newly proposed pipeline.

54

-

-

... More
Part-C: For Pipelines section having length greater than 50 KM

-

-

-

... More
Desktop Study & Reconnaissance survey as per standard specifications (including submission of report) Carrying out Reconnaissance Survey of the pipeline route including desktop study followed by ground truth verification, evaluation of alternative routes, preparation of route maps, crossing details and submission of reports in three copies complete as per specifications and direction of Engineer-in-Charge/ Site Engineer (for new/ additional RoU).

334

-

-

... More
Detailed Engineering Survey (including submission of report) Carrying out Detailed Engineering Survey of the entire pipeline route, as per the detailed Scope of Work in Special Conditions of Contract (SCC) including but not limited to the following: Deploying Differential Global Positioning to provide DGPS control points at every 4 to 5 km interval based on WGS-84 UTM coordinate system; Deploying total stations for traverse control between DGPS stations; Establishing UTM Coordinates of all TPs, IPs and Flag control points and other important points as desired by the owner; Taking all survey measurements, readings required for Planimetry, Information & Feature capturing and levels with respect to MSL; Obtaining base maps from authorised source (having clearance from Ministry of Defence/ Survey of India) of all districts (20 km on both sides of ROW) and submission to owner; Preparation and submission of Route map, Profile map, Crossing drawing, Right of way planimetry (within 50m on either side of ROW), Alignment sheets etc.; Obtaining Seismic fault line data & plotting of fault lines on route maps, Alignment sheets as well as on ground; DGPS survey details of forest crossing in the pipeline route to be incorporated in the village maps. Collection of other details including all labour, material, equipment etc. complete in all respects as per specifications and direction of Engineer-in-Charge/ Site Engineer; Integrating all survey details and deliverables, including base maps, into owner's Arc GIS (ESRI) server to obtain seamless geo-referenced data.

334

-

-

... More
Population Density Index (PDI) Survey (including submission of report) Carrying out Population Density Index survey along the entire pipeline route as per specifications & instruction of Engineer-in-Charge/ Site Engineer, including but not limited to the following: a) Providing location class based on Population Density Index; b) Recording the location class along with chainages at change point of each location; c) Due consideration shall be given to the possibility of future development of the area; d) If future development may cause a change in location class, the same shall be taken into consideration while determining its location class.

334

-

-

... More
Soil Resistivity Surveys (including submission of report) Conducting soil resistivity surveys as per detailed scope enumerated in Special Conditions of Contract and tender specifications complete in all respects as follows including uploading all data on Owner's ArcGIS (ESRI) server. Conducting soil resistivity survey at intervals of 125 meters along the pipeline route as per the detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in Charge/Site Engineer.

334

-

-

... More
Soil Chemical Analysis Survey (including submission of report) Conducting soil chemical analysis survey for determination of PH value, Chemical analysis for cations i.e., calcium, magnesium, sodium, potassium and Anions i.e. Chloride, Sulphate, Sulphide, Carbonate, Bicarbonate, Nitrate, Phosphate, etc. as per specifications and direction of Engineer-in-Charge/Site Engineer & providing data in tabular form complete in all respect as per schedule including uploading all data on Owner's Arc GIS server along the entire pipeline route at an interval of 1 Km as per specification

334

-

-

... More
Soil Stratification Survey (including submission of report) Conducting Soil Stratification Survey for determining stratification of Soil/ rock as per detailed scope of work specified in Special Conditions of Contract and Specifications of the tender document and direction of Engineer-in-charge/Site Engineer including providing the data in tabular form complete in all respect as per following schedule including uploading all data on Owner's ArcGIS server. "Along the pipeline route, including river crossings (excluding flowing river), by boring 100 mm dia. using auger type equipments up to a depth 2.5 m from ground/bed level or till rock is encountered, whichever is less, at an interval of 250 m and providing the results in tabular form as well as borelogs, ensuring atleast one borelog at the centre location of dry rivers, as per Specification and direction of Engineer-in-charge/Site Engineer. Note: The bank to bank width of flowing rivers shall be deducted from the total length for payment purpose, as payment for soil stratification at flowing river locations shall be under relevant item given below. "

334

-

-

... More
Cadastral Survey (Upto preparation of schedule u/s 3(1) of P&MP Act 1962) Carrying out Cadastral Survey, for laying cross country petroleum pipeline, obtaining/ procuring latest village maps from Revenue authorities (actual cost incurred on procurement to be reimbursed by owner on receipt of proof of payment), tracing/ scanning the same and storage in both hard and soft reproducible forms, plotting the pipeline route on village maps and marking on them the Intermediate Points (IPs) and Turning Points (TPs) of the surveyed route as staked on ground, identification of survey numbers of individual owners and plotting on village maps as per latest revenue records, preparation of field book and computation of area in each plot coming within limits of ROU corridor, collection of Jamabandi (the record of right holders) from revenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interim mutations, if any, and incorporation in Jamabandi and other works as per detailed scope of work specified in Special Conditions of Contract (SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additional pipeline ROW, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data (for Acquiring ROW of 20m width for new pipeline route or as directed by EIC). This is to be executed where Revenue Maps are available.

267.2

-

-

... More
"CADASTRAL SURVEY (upto preparation of Schedule u/s 3(1) of P&MP Act, 1962): Carrying out Cadastral Survey and measurement of each plot of affected landowner(s) falling within 20 meters RoU width for laying cross country natural gas pipeline, identification of ownership(s) and occupier of the affected land(s) with the support of Government Revenue department, Village Headmen and affected landowners, preparation of field book and computation of area in each affected plot, obtaining the signature of Landowner/village representative, Village Headmen, Revenue Field Officer, IGGL and Contractor representative in the Field report contenting the data of Village, Sub-Divisional/Block, District, name of affected landowner, area of affected land of the respective landowner, collection of interim mutations (if any), collection of Proof of Identification of affected landowner issued by Government (like Voter ID, Aadhar Card or Driving Licence), plotting of the pipeline route on newly surveyed cadastral/village maps to the scale 1:1000 showing plot boundaries with marking of Intermediate Points (IPS) and Turning Points (TPS) of the surveyed route as staked on ground, creation of survey numbers of individual affected plot(s)/owner(s) and plotting on village maps with reference chainage (or as per instruction by the Government Revenue department), obtaining the signature of Government Revenue department of the respective district for Record of Right holder(s), tracing/ scanning of newly surveyed cadastral Map of respective village, storage of document(s) and drawing(s) of identified RoU in both hard and soft reproducible forms and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc. including compensation to farmers on account of any damage to crops, fields etc. while conducting survey through fields, works complete in all respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) under P&MP Act 1962 for proposed pipeline route, complete in all respects. Integrating cadastral & 3(1) details on Owner's Arc GIS server to obtain seamless Geo-referenced data for acquiring ROW of 20 m width for pipeline route." This is to be executed where Revenue maps are not available.

66.8

-

-

... More
Providing services for establishing RoU in ROW as per P&MP Act 1962 Providing services for establishing Right of users (ROU on Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including follow up for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notice, facilitating hearing & disposal of objections, preparation of schedule for 6 (1) Notification, follow up for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6 (1) notices, entry of Gazette notification in village records, collection of land rates, calculation of land compensation payable & serving of compensation notice, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications to tender document and direction of Engineer- in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects integration of ROU details on Owner's Are GIS server to obtain seamless geo-referenced data. For Acquiring ROW of 20 m width for newly proposed pipeline.

334

-

-

... More
Part-D: For all Pipelines sections irrespective of length

-

-

-

... More
Detailed Engineering Survey (including submission of report) Providing and fixing at or near ground level precast reinforced cement concrete in pillars / markers etc. as per approved pattern and setting in position with cement plaster of 1:3 (1 Cement : 3 coarse sand) of size 150 mm X 150 mm and 300 mm height above ground with 300 mm X 300 mm X 300 mm footing below ground including the cost of required excavation, centering, shuttering, reinforcement, backfilling, painting with super acrylic emulsion paint of make Rangoli/Berger or equivalent on the exposed surface and writing of letters complete. a) 1 : 1½ : 3 (1 Cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).

4250

-

-

... More
Geotechnical Investigation (including submission of report) Deployment & Erection of Boring craft & rig in each borehole location as per specifications, SCC, Scope of work and direction of Engineer in-charge. Note: i) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored/rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring/drilling" in water" unless it is actually carried out in water. iii) Rate shall be inclusive of grouting back the boreholes as specified including cost for material, equipment and labour. iv) Core recovery 25% shall be designated as rock v) Recording of rock core characteristics shall be as per specification.

-

-

-

... More
In Land

80

-

-

... More
In Water

120

-

-

... More
Conducting Boring at Site in soil, Depth from GL/Bed level as per specifications, SCC, Scope of work and direction of Engineer in-charge.

-

-

-

... More
In Land

1800

-

-

... More
In Water

5400

-

-

... More
Drilling through rock with Nx size double tube core barrel upto a depth as specified in SCC below GL/bed level using TC bit/diamond bit as per specifications, SCC, Scope of work and direction of Engineer in-charge.

-

-

-

... More
In Land

200

-

-

... More
In Water

600

-

-

... More
Standard Penetration Test at different depth as per specifications, SCC, Scope of work and direction of Engineer in-charge.

2600

-

-

... More
Collection of undisturbed samples at different depth as per specifications, SCC, Scope of work and direction of Engineer in-charge.

100

-

-

... More
Collection of disturbed samples at different depth as per specifications, SCC, Scope of work and direction of Engineer in-charge.

3000

-

-

... More
Laboratory Tests (including submission of report) Particle size distribution.

-

-

-

... More
Sieve analysis

600

-

-

... More
Hydrometer analysis

600

-

-

... More
Atterberg limits

600

-

-

... More
Natural moisture content

600

-

-

... More
Bulk density of soil

600

-

-

... More
Dry density of soil

600

-

-

... More
Specific gravity

600

-

-

... More
Direct Shear Test

600

-

-

... More
Triaxial Shear Test (UD)

600

-

-

... More
Permeability Test

600

-

-

... More
Consolidation Test

600

-

-

... More
Unconfined compression test

600

-

-

... More
Swelling pressure test

600

-

-

... More
Free swell index test

600

-

-

... More
Shrinkage limit test

600

-

-

... More
Uniaxial Compressive strength of rock sample

600

-

-

... More
Specific Gravity test of rock sample

600

-

-

... More
Obtaining approvals/permission for pipeline crossing Obtaining approvals permissions from appropriate respective State/National and other statutory authorities for various pipeline crossing enroute like National Highway, State Highways, other Roads, Railways, Rever, Canal/Drain crossing or any other utility crossings etc. as per derailed scope of work specified in Special Condition of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-charge/ Site Engineer. Integrating all details on Owner's Arc GIS (ESRI) server along the entire Pipeline Route Note: 1) Payment shall be made for obtaining each permission. cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossing, each crossing shall be treated as separate and payment shall be made on unit basis

-

-

-

... More
National Highway Crossing under each Authority

5

-

-

... More
Other Road crossing under each Authority

10

-

-

... More
Railway Crossing (for each individual crossing)

4

-

-

... More
River crossing under each Authority

6

-

-

... More
Other pipeline crossing and utilities under each Authority

5

-

-

... More
Water bodies like ponds, lakes, creek, drains, nalas etc. under each authority

12

-

-

... More
Forest Permission for each online application

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.