Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for C/o Road From Changlang Town To Kuchep Village-ii In Changlang Dist (ph-i). in Changlang, Arunachal Pradesh, with an estimated contract value of Rs. 9,60,44,000. The bid opening date for this tender is 09-12-2024 and the last date for bid submission is 28-12-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date9 Dec 2024
Closing Date28 Dec 2024
Tender Amount₹ 9,60,44,000
Costs
EMD
₹ 9,60,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_2017_1Bid Award Id
ViewTender No
CHD/P-10/2024-25/1462Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
6.61
-
-
... More
Furnishing and placing Reinforced/Prestressed cement concrete in super-structure as per drawing and technical specification RCC Grade M20 Using Concrete Mixer Height up to 5 m
25
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (I) Ordinary Soil (A) Manual Means (i)Upto 3m depth(without de-watering)
464.64
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AP pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specifications
96
-
-
... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) For Grading-II ( 10 mm nominal size )
952.88
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
88
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. (a) P.C.C. grade M15 (Height upto 5 m)
418.38
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
13.64
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. b) Random Rubble Masonry
147.93
-
-
... More
12 mm cement plaster 1 : 6(1 cement : 6 fine sand)
6727.5
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
150.84
-
-
... More
(SH:5MTR HT.RRC/RETAINING WALL
-
-
-
... More
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
13556.62
-
-
... More
3MTR HT.RRM/BREAST WALL
-
-
-
... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
31762.5
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
11.05
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
10.46
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
931.5
-
-
... More
Granular Sub-base with Close Graded Material (Table:- 400-1)
By Mix in Place Method
Construction of granular sub-graded Material, mixing in a mechanical mix plant at OMC, carriage ofbase by providing close mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) (i) For Grading- I Material
6930
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per drawing and technical specifications RCC Grade M20 Using Concrete Mixer
16.86
-
-
... More
(Tack Coat)Providing and applying tack coat with bitumen emulsion pressure distributor at the rate of 0.20 kg per sqm on theemulsion using prepared bituminous/granular surface cleaned with mechanical broom
31762.5
-
-
... More
12mm Cement Plaster 1:4 ( 1 cement :4 fine sand
28.59
-
-
... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (ii) for Grading II ( 19 mm nominal size )
1270.5
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
4.02
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.
2484
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (I) Ordinary Soil (A) Manual Means (i)Upto 3m depth(without de-watering)
729.3
-
-
... More
(SH: PAVEMENT WORKS)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (I) Ordinary Soil (A) Manual Means (i)Upto 3m depth(without de-watering)
112.5
-
-
... More
(SH:,RCC SLAB CULVERT 1.5 MTR SPAN AND 9 MTR LENGTH
-
-
-
... More
Wet Mix Macadam (Providing, laying, spreading stone aggregate to wet mix macadam specification including premixing the and compacting graded Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
6352.5
-
-
... More
(SH:CC DRAIN)
-
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
12.75
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
220
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular Material
59.76
-
-
... More
a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications
6.56
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. b) Random Rubble Masonry
98.76
-
-
... More
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
9037.75
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
38.24
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil Manual Means (Depth upto 3 m)
2208
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
44.12
-
-
... More
Furnishing and placing Reinforced / Prestressed cement concrete in super structure as per drawing and Technical specification. Case -I Using concrete mixer A. R.C.C.Grade M 20 q. Height upto 5m
106.96
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements