The Public Health Engineering And Water Supply Department has issued a formal invitation for competitive bids for Integrated Smart Drinking Water Supply To Basar Township And Its Peripherals Settlement 1.6 Mld in Leparada, Arunachal Pradesh, with an estimated contract value of Rs. 37,77,00,000. The bid opening date for this tender is 03-12-2024 and the last date for bid submission is 17-12-2024. Interested bidders for Public Health Engineering And Water Supply Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Health Engineering And Water Supply Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date3 Dec 2024
Closing Date17 Dec 2024
Tender Amount₹ 37,77,00,000 
Notes
Download

Costs

Summary

Integrated Smart Drinking Water Supply To Basar Township And Its Peripherals Settlement 1.6 Mld

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

103.78

100

-

... More
c) Supply & Installation of 100 KVA, 11/0.4KV Distribution Transformer.

2

100

-

... More
d. Centering and shuttering in wall

566.12

100

-

... More
ii) Dry stone pitching 22.5cm thick ramming, watering and filling

15.32

100

-

... More
ii) Beam

40.28

100

-

... More
s. Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 1.0km

24.39

100

-

... More
A. Formation cutting

-

-

-

1600

100

-

... More
i) Hard Soil

2077.99

100

-

... More
i) Hard soil

19676.28

100

-

... More
p. Mechanical carriage of boulders to nearest road point for an average lead of 26.0km

10.97

100

-

... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification

704.6

100

-

... More
j. Loading and Unloading of Stone Boulder/Stone aggregates/Sand/kankar/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

187.07

100

-

... More
m. Neat cement punning

185.6

100

-

... More
Loading and Unloading of Cement/ Steel/ Structural Steel/ RC Pipes/ Wooden logs/ Bricks/ Bitumen and timber etc,. by Manual Means and Stacking for hill roads

18.72

100

-

... More
vii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

36.94

100

-

... More
n. White washing with lime on new work (three or more coats) to give an even shade.

336.26

100

-

... More
Retaining wall at strategic locations to protect WTP and Zonal tanks areas.

-

-

-

... More
a. 20 mm dia non-AMC water meter.

1518

100

-

... More
a. Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

235.98

100

-

... More
f. Centring and shuttering including strutting, propping etc and removal of form work in:

-

-

-

... More
f. Loading and Unloading of Stone Boulder/Stone aggregates/Sand/kankar/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

119.42

100

-

... More
Earth work excavation in foundation:

-

-

-

... More
xii) Mechanical carriage of Sand to nearest road point for an average lead of 51.0km

6.29

100

-

... More
j. Neat cement punning

289.13

100

-

... More
F. Construction of C.C. foot path (Approach path from Galu road to WTP)

-

-

-

... More
x) Carriage of materials:

-

-

-

... More
a. Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and deleterious matter, dressing of sides and bottom and backfilling with approved material.)

-

-

-

... More
e. Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

32.09

100

-

... More
k. Colour washing such as green, blue or buff on new work (two or more coats) i/c a base coat of white washing with lime to give an even shade.

2899.8

100

-

... More
a. Excavation over areas in:-

-

-

-

... More
b) Walls etc.

14.06

100

-

... More
k) Road crossing works in town = 39 nos

-

-

-

... More
t. Mechanical carriage of boulders to nearest road point for an average lead of 26km

23.51

100

-

... More
ii) Stone soling i/c packing with smaller stone chips.

12

100

-

... More
g. Reinforced cement concrete work in walls(any thickness), ……. etc upto floor ………. But excluding the cost of centering, shuttering and rainforcement :- 1:1.5:3:

1.26

100

-

... More
vii) Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
k. 12 mm thick cement plaster 1: 3

104.72

100

-

... More
Construction of Zonal Tanks with necessary arrangements:-

-

-

-

... More
v) Reinforcement of RCC work including bending, binding and placing in position complete etc.

2987.26

100

-

... More
x) 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)

11.79

100

-

... More
Foundation, Footings etc.

59

100

-

... More
ix) Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 1.50KM

270.22

100

-

... More
Column

92.16

100

-

... More
j) Mechanical carriage of MS Rods, Cement and other engineering materials from Basar to nearest road point of village by tractor for an average lead of 91.0km

288.64

100

-

... More
l. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar by truck for an average lead of 91.0 km

54.13

100

-

... More
b ) Hard Rock

9

100

-

... More
ii) Hard rock

17.59

100

-

... More
b) 90,000 ltr capacity Zonal tanks

3

100

-

... More
h. Cost of Haulage Excluding Loading and Unloading on hill roads.Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
e) Procurement of HDPE fittings and specials of various sizez from 20mm to 250mm.

1

100

-

... More
C/O High Rate Solid Contact Clarifloculator (HRSCC) capacity upto 1.60MLD

1

100

-

... More
ii) Sand and stone aggregates from Kamba to Basar Lead =71km

82.2

100

-

... More
A. Formation cutting

-

-

-

... More
m. Neat cement punning

331.4

100

-

... More
a. Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50 m.

-

-

-

... More
g. Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
i) Floor of R/Wall:

57.24

100

-

... More
intermediate & top beam

23.88

100

-

... More
vi) Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
ii) Walls etc.

286

100

-

336

100

-

... More
e. Reinforcement for R.C.C work i/c bending, binding and placing in position.

11776.59

100

-

... More
k. Making plinth protection 50 mm thick of CC 1 : 3 : 6 (aggregate 20 mm ) over 75 mm bed of stone ballast 40 mm etc including finishing the top smooth.

17

100

-

... More
k) Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.10km

288.64

100

-

56.38

100

-

... More
c. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

12.04

100

-

... More
a) Soils containing 50% or more

4452

100

-

3490.2

100

-

... More
A. Hard soil

3.3

100

-

... More
b. Hard Rock

258.9

100

-

... More
a) Excavation in hard soil and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

9

100

-

... More
p. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar truck for an average lead of 91.0km

24.39

100

-

... More
i. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

28.6

100

-

... More
viii) Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar by truck for an average lead of 91.0KM

38.94

100

-

... More
m.carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site by tractor an average lead of 2.0km

101.65

100

-

... More
Construction of Pre-Sedimentation Tank

-

-

-

... More
f. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar by truck for an average lead of 91.0 km

56.43

100

-

... More
Zincalum tanks

-

-

-

... More
n. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

228.6

100

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
q. Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.50km

24.39

100

-

... More
Q) Providing, Supplying & laying-fixing of 25MM Air Valves at distribution lines i/c trenching, procurement of fittings materialist etc. all complete.

20

100

-

... More
v) Reinforcement of RCC work including bending, binding and placing in position complete etc.

8614

100

-

... More
Construction of Type-I Qtr at WTP = 1 no

32

100

-

... More
m) Construction of Thrust Blocks, Anchor Blocks, Gradient Blocks etc.. for ONE Lines of DI pipe DN200 for Transmission Line = 59nos

-

-

-

... More
xii) Mechanical carriage of MS Rods, Cement and other engineering materials from Basar to nearest road point of village by tractor for an average lead of 91.0km

3.49

100

-

... More
a) Sand & shingles

1839

100

-

... More
Foundation, Footings etc.

151.04

100

-

... More
Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar by truck for an average lead of 91.0km

168.63

100

-

... More
i) 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)

8659.2

100

-

... More
Aquaduct support pillar

58.79

100

-

... More
RCC Grade M20, Height upto 5m

6.62

100

-

... More
l. Cost of Haulage Excluding Loading and Unloading on hill roads.Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
i) Cement and steel from Likabali to Basar Lead = 91km

20.78

100

-

... More
n. Colour washing such as green, blue or buff on new work (two or more coats) i/c a base coat of white washing with lime to give an even shade.

191.85

100

-

... More
e. Grading- III (Using Screening Crushable type such as Moorum or Gravel), Using Scrining Type-B (11.2mm agg.)

40.95

100

-

... More
ii) Ordinary Rock

270

100

-

... More
ix) C/O JackWell for Pumping main

1

100

-

... More
C/o Sedimentation Tank (1 No.)

-

-

-

... More
c. Providing & laying in foundation and plinth CC 1:3:6 excluding the cost of centering and shuttering.

3.51

100

-

... More
xiii) Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.50km

3.49

100

-

... More
j) Making plinth protection 50 mm thick of CC 1 : 3 : 6 (aggregate 20 mm ) over 75 mm bed of stone ballast 40 mm etc including finishing the top smooth.

24

100

-

... More
g. Centering and shuttering for:

-

-

-

... More
P) Providing, Supplying & Installation of Air Valve Setup with necessary fittings for Distribution Pipeline.

10

100

-

... More
vii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

59

100

-

... More
c. Sand and stone grit from Kamba quarry to nearest road of site(Additional Distance = 71.0km)

182.16

100

-

... More
c) 1,40,000 ltr capacity Zonal tanks

2

100

-

... More
g. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

510

100

-

... More
Sand and stone grit from Kamba quarry to nearest road of site(Additional Distance = 51.0km

838.81

100

-

... More
ii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

69.94

100

-

... More
iv) Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

17.11

100

-

... More
b. Excavation in foundation

-

-

-

... More
b. Excavation in foundation

-

-

-

... More
s. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

79.47

100

-

... More
q. Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.50km

24.39

100

-

... More
ii) Sand and stone aggregates from Kamba to Basar Lead =51km

71.49

100

-

... More
c. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

258.9

100

-

... More
(iii) Katcha Track and Track in River Bed/ Nallah Bed and Choe Bed.

1683.67

100

-

... More
o. Colour washing such as green, blue or buff on new work (two or more coats) i/c a base coat of white washing with lime to give an even shade.

148.66

100

-

... More
iv) Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

1.8

100

-

... More
r. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

79.47

100

-

... More
b) 90,000 ltr capacity Zonal tanks

3

100

-

... More
b. Earth work in excavation in foundation

-

-

-

... More
vi) Centring and shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
II) Hard Rock

160.71

100

-

... More
a) Foundation, Footings etc.

181.44

100

-

... More
b) Boulder

590

100

-

... More
Sandy material

16.2

100

-

... More
e. Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

216.48

100

-

... More
20 mm dia non-AMC water meter including 20mm pipe length of 30 m house connection.

-

-

-

... More
e. Centering and shuttering for:-

-

-

-

... More
i. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

18.6

100

-

... More
k. Making plinth protection 50 mm thick of CC 1 : 3 : 6 (aggregate 20 mm ) over 75 mm bed of stone ballast 40 mm etc including finishing the top smooth.

20

100

-

... More
i) Hard soil

18777.13

100

-

... More
E. Construction of C.C. Drain = 256.60m

-

-

-

... More
a) Hard soil

1154.56

100

-

... More
Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.40km

53.96

100

-

... More
l. Neat cement punning

250.4

100

-

... More
Loading and Unloading of Cement/ Steel/ Structural Steel/ RC Pipes/ Wooden logs/ Bricks/ Bitumen and timber etc,. by Manual Means and Stacking for hill roads

20.75

100

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

9.99

100

-

... More
xi) Mechanical carriage of boulders to nearest road point for an average lead of 5.0KM

62.54

100

-

... More
i) Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

138.65

100

-

... More
i) Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

32.17

100

-

... More
e. Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

10.22

100

-

... More
i) Foundation, Footings etc.

17.04

100

-

... More
i) Footings and column

69.6

100

-

... More
Sandy material

12.6

100

-

... More
c. Stone soling

213.92

100

-

... More
l. 12 mm cement plaster 1 : 3.

304.3

100

-

... More
i) Floor:

108.82

100

-

... More
iii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

128.66

100

-

... More
q. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

42.4

100

-

... More
f. Reinforcement of RCC work including bending, binding and placing in position complete etc.

14955.17

100

-

... More
ix) Fitting and fixing charges etc complete

240

100

-

... More
l) Mechanical carriage of Sand to nearest road point for an average lead of 51.0km

793.76

100

-

... More
ii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

196.18

100

-

... More
b. Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.

546

100

-

... More
i) Hard soil

294.26

100

-

4400

100

-

... More
Loading and Unloading of Stone Boulder/ Stone aggregates/ Sand/ kankar/ Moorum/ Lime/ Shingle /Surki /Earth /Excavated Rock and Kerb Stones by Manual Means for hill roads.

144.18

100

-

... More
p. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar truck for an average lead of 91.0km

24.39

100

-

... More
Water distribution network including pipe length of 10.20km dia from 50mm to 200mm HDPE pipe from WTP to various zonal tanks, bulk flow metres (29nos), pressure transmitter, level transmitter at all zonal tanks/WTP/Pump house, air valves, scour drain valves, isolation gates with fittings and trenching, refilling, saddle support, thrust block etc complete pipe dia (i) DMA-1 32mm to 110mm = 3187m, (ii) DMA-2 32mm to 160mm = 3322m, (iii) DMA-3, 32mm to 160mm = 1334m, (iv) DMA-4, 32mm to 160mm = 1543m, (v) DMA-5, 32mm to 160mm = 2272m, (vi) DMA-6, 32mm to 160mm = 2402m, (vii) DMA-7, 32mm to 110mm, (viii) DMA-8, 32mm to 125mm = 6163m, (ix) DMA-9, 32mm to 125mm = 2422m, (x) DMA-10, 32mm to 110mm = 1266m, (xi) DMA-11, 32mm to 200mm = 3097m, (xii) DMA-12, 32mm to 125mm = 6030m

-

-

-

... More
D. C/O C.C. drain = 3608.0m

-

-

-

... More
a) C/O 11KV line with 12 Mtr Steel Tubular Pole & 6/1/2.59 sqmm ( Weasel ) ACSR conductor.

8.26

100

-

... More
Coursed rubble masonry (first sort )

86.04

100

-

... More
i) Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)

1593

100

-

... More
ii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

1062

100

-

... More
g) C/O RCC Barrage for Pumping system

-

-

-

... More
viii) C/O Civil Stuructures for Pump House

1

100

-

... More
Coursed rubble masonry (first sort) with hard stone in foundations and plinth in cement mortar 1 : 6 (1 cement : 6 fine sand).

-

-

-

... More
d. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

68.12

100

-

... More
Construction of Aerator

-

-

-

... More
a) 35,000 ltr capacity Zonal tanks

2

100

-

... More
f) Supply, Installation, Testing & Comissioning 250 KVA Generator set for Pump House

1

100

-

... More
vii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) excluding cost of centering & shuttering and reinforcement.

-

-

-

... More
viii)R.C.C work in 1:2:4 (aggregate 20mm) in columns, pillars, piers, abutments, posts & struts etc. but excluding the cost of centering, shuttering and reinforcement.

25.5

100

-

... More
Land development for WTP

-

-

-

... More
b. Dry Stone Pitching 22.5cm thick i/c supplying of stone and prepearing surface complete (I/c carriage of stone for a lead of 5km)

22.58

100

-

... More
f. Reinforcement of RCC work including bending, binding and placing in position complete etc.

5680.37

100

-

... More
b. Earth work in excavation

-

-

-

... More
x) Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 0.10km

24.66

100

-

... More
Carriage of Cement and torsteel from Likabali to Basar (Distance = 91km)

132

100

-

... More
g. Proving & Laying CC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

180.4

100

-

... More
xi) 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)

11.34

100

-

... More
c. Stone soling i/c packing with smaller stone chips.

216.48

100

-

... More
a. Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

351.12

100

-

... More
i) Foundation, Footings etc.

1804

100

-

45540

100

-

... More
h. Mechanical carriage of best quality aggregates from nearest quarry to nearest road point of village for an average lead of 71.0km

159.31

100

-

... More
xiv) Mechanical carriage of boulders to nearest road point for an average lead of 14.0 km

27.6

100

-

... More
i) Excavation in foundation in Hard soil

169.76

100

-

... More
i) Foundation, footings etc.

11.06

100

-

... More
m. White washing with lime on new work (three or more coats) to give an even shade.

191.85

100

-

... More
ii) Walls

379.69

100

-

... More
ii) Hard Rock

2077.99

100

-

4676.7

100

-

... More
h. Fabrication, supplying and fixing of MS ornamental grills of required pattern in wall

10068.75

100

-

... More
ii) Walls etc.

186

100

-

1270.5

100

-

... More
g) Clearing jungle including uprooting of rank vegetation , grass ,cane and bamboo roots or clumps, brush wood, trees and sapling of girth upto 30 cm measured at a height of 1.22 m above ground level.

69380

100

-

... More
o. Colour washing such as green, blue or buff on new work (two or more coats) i/c a base coat of white washing with lime to give an even shade.

336.26

100

-

... More
l. 12 mm cement plaster 1 : 3.

504.63

100

-

... More
R) Providing, Supplying & Installation of Isolation & Drain Valve Setup PN16/ANSI#100 for Distribution Pipeline.

12

100

-

... More
a. Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

627.6

100

-

... More
h. Proving & Laying CC work 1:2:4 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

432.96

100

-

... More
B. C/O RCC Cross drainage work

-

-

-

... More
i) Hard soil

155.66

100

-

... More
i) Cement and steel from Likabali to Basar Lead = 91km

11.97

100

-

... More
b) Columns, pillars and piers

204

100

-

... More
o. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar truck for an average lead of 91.0km

24.39

100

-

... More
f. Reinforcement of RCC work including bending, binding and placing in position complete etc.

10986

100

-

... More
a) Foundation, Footings etc.

4.82

100

-

... More
iii) Boulders from Dali to Basar. Lead = 14km

115.43

100

-

... More
b) Excavation in trenches for laying of D.I. Pipes

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and deleterious matter, dressing of sides and bottom and backfilling with approved material.)

-

-

-

... More
ii) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

162.61

100

-

... More
d) Supply, Installation, Testing & comissioning of Raw Water Pump Set 190KW each Pump (2W+1S) with VFD, mechnical pump mounting system, 100m dyanamic Head and Pumping capacity upto 1MLD

3

100

-

... More
j. Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 1.0 km

321.39

100

-

... More
m. Mechanical carriage of MS Rods, Cement and other engineering materials from Basar to nearest road point of village by tractor for an average lead of 91.0km

20.62

100

-

... More
ii) Wall:

627.2

100

-

... More
f. Reinforcement of RCC work including bending, binding and placing in position complete etc.

15911.5

100

-

... More
UV System as disinfeectant, Activated Carbon filter, SCADA, Water Testing equipments, energy backup.

1

100

-

... More
g. Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
g. Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
f. Reinforced cement concrete work in columns, pillars,piers,abutments,post and struts etc upto floor ………. But excluding the cost of centering, shuttering and rainforcement :- 1:2:4:

3.21

100

-

... More
iii) Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

9.72

100

-

... More
n. White washing with lime on new work (three or more coats) to give an even shade.

309.78

100

-

... More
i) Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

89.1

100

-

... More
C. Retaining/ Breast Wall (Average 3.00 Mtr High)=16.0M

-

-

-

... More
Foundation

20.11

100

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications

-

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

-

-

-

... More
Providing, Supplying & Laying-fixing of Fire hydrants and 20mtr hose at strategic locations including Knife/gate valves and civil chambers for maintenance.

7

100

-

... More
h. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

102.02

100

-

... More
xi) Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar by truck for an average lead of 91.0km

24.66

100

-

... More
xiii) Mechanical carriage of Aggregates to nearest road point for an average lead of 51.0km

13.03

100

-

... More
d. Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to theand camber, applying and brooming requisite type of required density.) A) By mannual means, (i) Grading- I (Using Screening Crushable type such as Moorum or Gravel),Using Screening Crushable type such as Moorum or Gravel (ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel), (a)Using Screening Type-A (13.2mm Agg.)

40.95

100

-

... More
o. Colour washing such as green, blue or buff on new work (two or more coats) i/c a base coat of white washing with lime to give an even shade.

309.78

100

-

... More
p. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar truck for an average lead of 91.0km

24.39

100

-

... More
a. Earth work excavation over areas in hard soil including disposal of excavated earth lead up to 50mtr and lift up to 1.50mtr.

507

100

-

... More
i) Foundation, Footings etc.

21.21

100

-

... More
(i) Surfaced Road

9516.56

100

-

... More
iii) Suspended floors, roofs, landings etc.

44.91

100

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

12

100

-

... More
a) Foundations, footings, bases of columns etc. and mass concrete

71.17

100

-

... More
p. Mechanical carriage of boulders to nearest road point for an average lead of 14 km

142.33

100

-

... More
k. 12 mm cement plaster 1 : 3.

381.25

100

-

... More
Construction of 1 (One) no. of security hut at WTP

24

100

-

... More
i) Foundation, Footings etc.

12.81

100

-

... More
Mechanical carriage of boulders to nearest road point for an average lead of 26.0km

590

100

-

... More
e. Reinforcement of RCC work including bending, binding and placing in position complete.

8599.56

100

-

... More
a) 35,000 ltr capacity Zonal tanks

2

100

-

... More
a. Cement and torsteel from Likabali to Basar (Distance = 91km)

35

100

-

... More
xii) Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

62.75

100

-

... More
ii) Dry stone pitching

9.72

100

-

... More
iii) Beam

724.95

100

-

... More
C/0 all weather Approach road including Side drain culvert etc complete wall to WTP (256m WB road, with CC drains) i/c C.C. approach path to WTP

-

-

-

... More
a) Foundation, Footings etc.

519.11

100

-

... More
o. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

289.98

100

-

... More
b. Providing and fixing HDPE pipes PE 100 PN 16 including trenching and re-filling etc (external work for distribution network) excluding the cost of HDPE fittings of .Distribution lines

-

-

-

... More
b. Providing and laying cement concrete 1:1.5:3 in retaining walls, return walls,

105

100

-

... More
B. Pavement with BT work

-

-

-

... More
Ordinary soil, Mannual means Up to 3.00 Mtr depth

68.04

100

-

... More
j. Proving & Laying RCC work 1 : 2 : 4 (aggregate 20 mm) in suspended floors, roofs, landings and balconies etc but excluding cost of centering & shuttering and reinforcement.

18.46

100

-

... More
i) Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

23.4

100

-

... More
c. Stone soling

162.61

100

-

... More
b. Dry stone pitching including supply of stone and preparing surface complete (including carriage of stone for 5 km lead).

13.53

100

-

... More
I) Saturated soil

160.71

100

-

... More
Cost of Haulage Excluding Loading and Unloading on hill roads.Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
h. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

35.52

100

-

... More
d. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

162.61

100

-

... More
i) Ordinary soil, Mannual means, Up to 3.00 Mtr depth

31.68

100

-

6438.6

100

-

... More
ii) Soft Rock

9838.14

100

-

... More
b. Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

5.76

100

-

... More
l. Neat cement punning

104.72

100

-

... More
x) Proving & Laying RCC work 1 : 2 : 4 (aggregate 20 mm) in suspended floors, roofs, landings and balconies etc but excluding cost of centering & shuttering and reinforcement.

1.49

100

-

... More
ix) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

1.24

100

-

... More
h. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

42.78

100

-

... More
WTP of capacity 1.60MLD with Automation by SCADA system for complete monitoring of water supply system with Min 100" Monitoring ststion, wireless communication systens, Firewalls, LAN, Switch, Internet connectivity, cables and required instruments, Electronics with complete trails training and handover.

1

100

-

... More
ii) Walls etc.

234

100

-

... More
a. Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

208.62

100

-

... More
Head load carriage of Quarry materials to work site for an average lead of 0.40km

-

-

-

... More
m. Mechanical carriage of best quality Sand from nearest quarry to nearest road point of village for an average lead of 71.0km

95.22

100

-

... More
r. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

42.4

100

-

... More
xv) Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0 km

8.24

100

-

... More
h. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

26.86

100

-

... More
i) Hard soil

270

100

-

... More
Carriage of Boulders from nearest quarry to nearest road of site Lead = 14.0km

76.13

100

-

... More
vi) Centring and shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
h. Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

510

100

-

... More
g. Loading and Unloading of Cement/Steel/Structural Steel/RC Pipes/Wooden logs/Bricks/Bitumen and timber etc,. by Manual Means and Stacking for hill roads

11.97

100

-

... More
h. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

13.62

100

-

... More
v) Reinforcement of RCC work including bending, binding and placing in position complete etc.

1959

100

-

... More
g. Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
a) Foundation, Footings etc.

5.2

100

-

... More
d. Reinforcement for R.C.C. work including bending, binding & placing in position.

11031.32

100

-

... More
Construction of Approach road (Formation cutting, Stone pitching & RCC cross drainage work) from Head work to WTP (HW -WTP), Main road to Barrage and from Barrage to HW -WTP road

-

-

-

... More
e) Supply, Installation, Testing & comissioning Electro-Mechnical Items-Foot Valves with Strainer (3Nos), NRV(3Nos), Actuated Butterfly valve (3Nos), Isolation Gate Valve (3Nos), Surge Anticipation Control valve (1 Nos), Flow Meter (3Nos), Pressure Gauge (3Nos), Vaccum Gauge (3Nos), Pressure Transmitter (3Nos), Level Transmitter (1Nos), armoured wirings and fittings- Nut & Bolt(HT10.9), Gasket(EPDM), Flanges, Dismentling Joints etc

1

100

-

... More
B. Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

4.95

100

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)

-

-

-

... More
j. Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in suspended floors, roofs, landings and balconies etc but excluding cost of centering & shuttering and reinforcement.

4.9

100

-

... More
xi) Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

51.78

100

-

... More
ix) Proving & Laying RCC work 1 : 2 : 4 (aggregate 20 mm) in suspended floors, roofs, landings and balconies etc but excluding cost of centering & shuttering and reinforcement.

1.19

100

-

... More
h. Reinforced cement concrete work in suspended floors, ……. etc upto floor ………. But excluding the cost of centering, shuttering and rainforcement :- 1:2:4:

5.72

100

-

... More
vi) Centring and shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
x) Mechanical carriage of Sand and shingles to nearest road point for an average lead of 71.0KM

231.28

100

-

... More
i. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

24.05

100

-

... More
n. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

27.55

100

-

... More
r. Mechanical carriage of boulders to nearest road point for an average lead of 26.0km

23.51

100

-

... More
Conference Hall

64

100

-

... More
iv) Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

9.72

100

-

... More
m. Neat cement punning

143

100

-

... More
q. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

79.47

100

-

... More
i. 12mm cement plaster 1:3 (1cement:3sand).

2899.8

100

-

... More
b) Ordinary Rock

1902

100

-

... More
d. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

213.92

100

-

... More
d. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

107.42

100

-

... More
s. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

79.47

100

-

... More
l. Mechanical carriage of MS Rods, Cement and other engineering materials from Likabali to Basar truck for an average lead of 91.0km

101.65

100

-

... More
o. Mechanical carriage of Aggregates to nearest road point for an average lead of 71.0km

56.76

100

-

... More
iii) Hard Rock requiring chiselling

3279.38

100

-

... More
b. Cement, tor steel from Sub-Divisional to nearest road point of site by tractor(Distance = 4km)

35

100

-

... More
xi) Mechanical carriage of MS Rods, Cement and other engineering materials from Basar to nearest road point of village by tractor for an average lead of 91.0km

6.65

100

-

... More
f) Excavation in trenches for laying of pipes

-

-

-

... More
i) Cement and steel from Likabali to Basar Lead = 91km

18.72

100

-

... More
iii) Suspended floors, roofs, landings etc.

105.49

100

-

... More
g. Mechanical carriage of best quality Sand from nearest quarry to nearest road point of village for an average lead of 71.0km

79.65

100

-

... More
k. Loading and Unloading of Cement/ Steel/ Structural Steel/ RC Pipes/ Wooden logs/Bricks/ Bitumen and timber etc,. by Manual Means and Stacking for hill roads

1.89

100

-

... More
j. Centering, shuttering including strutting, propping etc and removal of form work for :

-

-

-

... More
D. RCC Slab Culvert-1.00 mtr. Span = 2 Nos

-

-

-

... More
Proving & Laying CC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering:

311.22

100

-

... More
iii) Boulders from Dali to Basar. Lead = 14km

215.78

100

-

... More
i. 12 mm cement plaster 1 : 3.

289.13

100

-

... More
l) C/O Saddle Supports = 62 nos (having height from 0.50m to 5.00m)

-

-

-

... More
i) Excavation in foundation

-

-

-

... More
f. R.C.C. 1:2:4(1Cement:2sand:4stone grit of 20mm) excluding cost of centering and shuttering

-

-

-

... More
ii) Walls etc.

3247.2

100

-

... More
b. Dry stone pitching 22.50 cm thick including supply of stone and preparing of site complete etc.

12.04

100

-

... More
iii) Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

13.57

100

-

8.14

100

-

... More
o. Mechanical carriage of best quality boulders from nearest quarry to nearest road point of village for an average lead of 26.0km

27.69

100

-

... More
g. Proving & Laying RCC work 1:1.5:3 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

1.67

100

-

... More
i. Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats)

510

100

-

... More
c) 1,40,000 ltr capacity Zonal tanks

2

100

-

... More
C/o Boundary wall around WTP and Zonal tanks = 805.50Rmt

-

-

-

... More
i) Mechanical transportation of GI pipes from Likabali store to PHED Store Basar for a lead of 91.0km

448.71

100

-

... More
e. Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

24.39

100

-

... More
b) C/o LT line with 7.5 Mtr Steel Tubular Pole, 6/1/2.11sqmm ACSR conductor ( Squirrel ) & Street Lightnings

1.89

100

-

4460.4

100

-

... More
iii) Stone soling i/c packing with smaller stone chips.

5.5

100

-

... More
O) Transportation of Pipes (mechanical and head load carraige) to actual work sites

-

-

-

... More
c. P/L c.c. 1:3:6 (1 cement :3 c/sand :6 stone aggregate of 40mm nominal size)

76.12

100

-

... More
e. Reinforcement for R.C.C. work

9015.17

100

-

... More
M.S. stagging upto 9.0mtr high

-

-

-

... More
b) Excavation in hard rock by chiselling including stacking of serviceable material and disposal of unserviceable material lead upto 50 m and lift upto 1.50 m.

144.32

100

-

... More
c. Stone soling

107.42

100

-

... More
ii) Wall

276.68

100

-

... More
d. Providing and laying cement concrete 1 : 3 : 6 (stone aggregate 40 mm) excluding the cost of centring an shuttering in Foundations and plinth:

18.37

100

-

... More
c. Dry stone pitching 22.50 cm thick including supply of stone and preparing of site complete etc.

68.12

100

-

... More
r. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

42.4

100

-

... More
c. Dry stone pitching 22.5cm thick ramming, watering and filling with smaller stone chips etc complete.

31.8

100

-

... More
Loading and Unloading of Stone Boulder/ Stone aggregates/ Sand/ kankar/ Moorum/ Lime/ Shingle /Surki /Earth /Excavated Rock and Kerb Stones by Manual Means for hill roads.

128.26

100

-

... More
Construction of Clear Water Reservoir

-

-

-

... More
Mechanical carriage of Sand and shingles to nearest road point for an average lead of 71.0km

1839

100

-

... More
n) Mechanical carriage of boulders to nearest road point for an average lead of 14.0km

505.12

100

-

... More
n. White washing with lime on new work (three or more coats) to give an even shade.

148.66

100

-

... More
a. Supply of Zincalume water tank or Galvalume water tank and ISMB, ISMC, ISWB specified staging materials upto various central stores located within the state including construction of RCC foundation plinth for staging with installations of both staging works and water tank as per specifications etc all complete.

-

-

-

... More
i) Earth work in excavation

-

-

-

... More
Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

313.8

100

-

... More
ii) Walls etc.

192.4

100

-

... More
i) Hard soil

17.59

100

-

899.85

100

-

... More
v) Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

1.1

100

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

94.3

100

-

... More
a. Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)

546

100

-

... More
m) Mechanical carriage of Aggregates to nearest road point for an average lead of 51.0km

1298.88

100

-

... More
Design ,Construction ,Supply of Materials , Erection , Installation & Commissioning of Complete WTP Pressure filteration System Plant of average 1 Lakhs/hr capacity with SCADA compatible Pressure monitoring and back washing mechanisam.

1

100

-

... More
i. Reinforcement including bending and binding and placing in position

1820

100

-

... More
Cost of Haulage Excluding Loading and Unloading on hill roads.Haulage of materials by tipper excluding cost of loading, unloading and stacking.

-

-

-

... More
h) Supplying of Air Release Valve Setup including necessary fittings for DI pipe DN200 for Transmission Line

12

100

-

... More
p. Head load carriage of MS Rods, Cement and other engineering materials from nearest road point of village to work site for an average lead of 1.0km

54.13

100

-

... More
b. Earth work excavation in foundation including pumping or bailing out water and disposing of excavated soil, lead upto 50 m and lift upto 1.50 m.

190.8

100

-

... More
C/o Raw water storage tank

-

-

-

... More
c) Suspended floors, roofs, landings etc.

5.1

100

-

... More
d. Cement, tor steel, boulders, sand & shingles from nearest road point to site on head load(Distance = 0.60 km)

225.36

100

-

... More
iii) Suspended floors, roofs, landings etc.

176.91

100

-

... More
k. Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete.

14.35

100

-

... More
f. R.C.C. 1:2:4 (1 cement:2 coarse sand:4 stone aggregate of 20mm nominal size) excluding cost of centering, shuttering and reinforcement in:-

-

-

-

... More
i) Hard soil in Foundation, Footings etc.

104.9

100

-

... More
xiv) Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

4.19

100

-

... More
ii) Ordinary Rock

988.27

100

-

... More
vi) Reinforcement of RCC work including bending, binding and placing in position complete etc.

1885.4

100

-

... More
a. Excavation in foundation

-

-

-

... More
j) Providing,Supplying ,installation & commissioning of Automated Control Valve at inlet & outlet of Zonal Tanks with Flow meter & ultrasonic Level transmittor with 7 " Inbuilt Touchpad for ground operation with-in RTU

24

100

-

... More
Wireless Surveillance security cameras at Intake works and WTP (4 nos)

1

100

-

... More
Drop In-let Head work at Nyodu

-

-

-

9.06

100

-

... More
ii) Wall

666.95

100

-

12213.6

100

-

... More
a) RCC Barrage for pumping system, structure for pump house and jack well for pumping main. (b) Supply installation, testing, commissioning of raw water pump set 190KW each pump (2W + 1S) with VFD, mechanical pump mounting system, 100 dynamic head and pumping capacity upto 1.0 MLD. (c) 11KV dedicated electric corridor (Length 9.0km for Intake and WTP installation of 63KVA, 11/0.415KV Sub station at Nyodu Galu tri-junction for water treatment plant. (d) Pressure transmitter (2 Nos.), level transmitter (1 No.), flanges, dismantling joints etc and supply and installation, testing & commissioning of electro-mechanical items like foot valves with striner (2 nos), NRV (3 Nos), Actuated Butterfly valve (2 nos), Isolation gate valve (3 nos), surge anticipation control valve (1 no.), flow meter (2 nos) and vaccum gauge (e) Supply installation, testing, commissioning 250KVA generator set for pump house

-

-

-

... More
(ii) Unsurfaced Graveled Road

2891.03

100

-

... More
p. Mechanical carriage of Sand to nearest road point for an average lead of 71.0km

42.4

100

-

... More
c) Suspended floors, roofs, landings etc.

4.68

100

-

... More
k. Making plinth protection 50 mm thick of CC 1 : 3 : 6 (aggregate 20 mm ) over 75 mm bed of stone ballast 40 mm etc including finishing the top smooth.

29

100

-

... More
ii) Mechanical transportation of GI pipes from PHED Store Basar to nearest road point of village for a lead of 8.0km

448.71

100

-

... More
a. Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size etc.

-

-

-

... More
a. Excavation in foundation:

-

-

-

... More
viii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

1.38

100

-

... More
c. Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

-

-

-

... More
v) Reinforcement of RCC work including bending, binding and placing in position complete etc.

4810.08

100

-

... More
ii) Sand and stone aggregates from Kamba to Basar Lead =51km

179.11

100

-

... More
e. Proving & laying Cement Concrete 1 : 3 : 6 (aggregate 40 mm) excluding the cost of Centering & shuttering in foundations and plinth.

16.11

100

-

... More
Control room i/c store room for treatment plant accessories and chemical

60

100

-

... More
b) Column:

13.82

100

-

... More
j. Proving & Laying RCC work 1 : 2 : 4 (aggregate 20 mm) in suspended floors, roofs, landings and balconies etc but excluding cost of centering & shuttering and reinforcement.

15.82

100

-

... More
t. Mechanical carriage of boulders to nearest road point for an average lead of 26.0km

23.51

100

-

... More
iii) Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

25.96

100

-

... More
j. White washing with lime on new work (two or more coats) to give an even shade.

2899.8

100

-

... More
d) Procurement and supply of 200mm dia D.I. fittings and specials.

1

100

-

... More
i) 200MM Automated Control Valve at inlet of Sedimentation tank and outlet of CWR with Flow meter, including ultrasonic Level transmittor with 12 " Inbuilt Touchpad for ground operation with-in RTU

2

100

-

... More
a. Excavation in foundation trenches or drains i/c disposal of excavated earth

384.95

100

-

... More
d. Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

-

-

-

... More
i. Mechanical carriage of best quality boulders from nearest quarry to nearest road point of site for an average lead of 26.0km

14.21

100

-

... More
c. Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)( For Grade - I materials) Using moorum or gravel

81.9

100

-

... More
ii) Earth work in excavation in saturated soil upto a depth of 61 cm including pumping or bailing out water and disposing of excavated soil, lead upto 50 m and lift upto 1.50 m.

160.83

100

-

... More
i) Foundation, Footings etc.

18.34

100

-

... More
s. Mechanical carriage of boulders to nearest road point for an average lead of 26.0km

23.51

100

-

... More
viii) Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.

13840

100

-

... More
b. Laying stone soling

59.45

100

-

... More
g. Brick work with best available local bricks in foundations and plinth in cement mortar 1:6 (1 cement : 6 fine sand).

87.96

100

-

... More
f. Centering & Shuttering including strutting, propping etc and removal of form work for:

-

-

-

... More
iv) Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

1.1

100

-

... More
n) River crossing work = 4 nos

-

-

-

... More
vii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in foundations, footings, bases of columns etc. and mass concrete excluding cost of centering & shuttering and reinforcement.

2.4

100

-

... More
Coursed rubble masonry (first sort )

69.96

100

-

... More
c) Providing and fixing HDPE pipes PE 100 PN 16 including trenching and re-filling etc (external work for distribution network) excluding the cost of HDPE fittings of Distribution lines

-

-

-

... More
iii) Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

1.8

100

-

... More
C. Laying 22.5cm thick stone soling along 3.00m width of entire approach road

-

-

-

... More
i) Footings and column

927.94

100

-

... More
d. Providing laying cement concrete 1:3:6(1cement:3c/sand:6 stone aggregate of 40mm nominal size) excluding cost of centering and shuttering.

31.8

100

-

... More
t. Head load carriage of engineering materials from nearest road point of site to work site for an average lead of 1.0km

169.77

100

-

... More
e. Reinforced cement concrete work in lintels, beams and bresumers upto floor ………. But excluding the cost of centering, shuttering and rainforcement :- 1:1.5:3.

3.46

100

-

... More
viii) Proving & Laying RCC work 1:2:4 (aggregate 20 mm) in walls including attached pillasters, buttresses etc. with cement mortar 1 : 3 etc excluding cost of centering & shuttering and reinforcement.

1.08

100

-

... More
n. Mechanical carriage of best quality aggregates from nearest quarry to nearest road point of village for an average lead of 71.0km

195.43

100

-

... More
a) Providing, Supplying of DI pipe of DN200 K9 for gravity main

4340

100

-

... More
e. Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

15

100

-

4743.9

100

-

... More
f. Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)

510

100

-

... More
d. Reinforced cement concrete work 1:1.5:3 in foundations, footings, bases of columns etc. and Mass concrete excluding cost of centering, shuttering and reinforcement in 1:1.5:3 for foundation.

21.08

100

-

... More
c. R.C.C. 1:1.5:3 in wall

320

100

-

... More
i) Hard soil

162.61

100

-

... More
Design & Construction of Sludge Pit & Sludge Disposal System at WTP

1

100

-

... More
d. Collection of boulder within a lead of 200mtr radius at quarry including royalty, monopoly and stacking complete.

216.48

100

-

... More
(i) Ordinary soil, A) Manual Means (Depth upto 3 m)

153.96

100

-

... More
ii) Excavation in foundation in Hard Rock

25.96

100

-

... More
l. 12 mm cement plaster 1 : 3.

689.9

100

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.