To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Water Resources Department - WRD Tender
Civil And Construction
Pipe Line Project
Opening Date24 Jan 2022
Closing Date22 Feb 2022
Tender Amount₹ 35,59,196
Costs
EMD
₹ 36,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
UKPRR/2021-22/WS/WORK_INDENT785Bid Award Id
ViewTender No
UKPRR/2021-22/WS/WORK_INDENT785Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
For Distribution Pipe: Providing and installing at site of work 75 mm Dia P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handlingcharges including encasing the pipe around to a depth not less than 15 cms with gravel orselected earth available from the excavation etc. complete. PVC PIPES OF 6 Kg./Cm2.Including all leads and lifts and as directed by the Engineer In-charge of the work.
6222
-
1287954
... More
Providing 80 mm dia Air valve confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any.Including all leads and lifts and as directed by the Engineer In-charge of the work. a. 100 mm dia CI air valve
5
-
13500
... More
Providing 80 mm dia Sluice valve/ scour valve confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc.Including all leads and lifts and as directed by the Engineer In-charge of the work. a.100 mm dia Sluice valve
22
-
83600
... More
Giving hydraulic test for 80 mm dia C.I. / R.C.C. / P.V.C. / H.D.P.E/ D.I /A.C. pipelines to the pressure equal to two times the working pressure including cost of supply of water. Including all leads and lifts and as directed by the Engineer In-charge of the work.
6222
-
28621.2
... More
Giving hydraulic test for 100 mm dia C.I. / R.C.C. / P.V.C. / H.D.P.E/ D.I /A.C. pipelines to the pressure equal to two times the working pressure including cost of supply of water. Including all leads and lifts and as directed by the Engineer In-charge of the work.
1200
-
6960
... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. Including all leads and lifts and as directed by the Engineer In-charge of the work.
4007.88
-
412811.64
... More
KSRRB 300-1: Earthwork excavation by mechanical means in all type of soil involving an average horizontal throw upto 2 meters and an average lift upto 1.5m to 2.00mtr excavated surface leveled and sides nealty dressed, the disposed earth to be leveled neatly after breaking of clods complete as per specifications. Morth / Chapter-3.Including all leads and lifts and as directed by the Engineer In-charge of the work.
1239.3
-
37179
... More
KSRRB 300-58: Compaction or original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. MORTH / Chapter-3.Including all leads and lifts and as directed by the Engineer In-charge of the work.
5913
-
35478
... More
KSRRB M300-53. Construction of embankment with approved material Gravei/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300-2 complete as per specifications, including cost of gravel/ murrum, watering charges & compaction by vibratory roller to 95% of modified proctors density. MORTH Specification No. 305 .n of Engineer-in-charge of work.Including all leads and lifts and as directed by the Engineer In-charge of the work.
1749.6
-
796068