Tribal Welfare Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Opening Date25 Jan 2021
Closing Date8 Feb 2021
Tender Amount₹ 40,65,986 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
372300Bid Award Id
ViewTender No
08/2020-21/SE-Zone II/TW/VJA/Edn.Infra / Dt.11.01.2021Tender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Building work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
73.73
-
2514
... More
Building work;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Groun Floor
23
-
97713
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.
23.08
-
214409
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal
5.34
-
52679
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam.
10.34
-
122072
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard supplie rs approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns
8.65
-
98964
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Roof Beams
12.76
-
125650
... More
Building work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick GROUND FLOOR
236.72
-
281223
... More
Building work;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels
1.55
-
17068
... More
Building work;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work
12
-
9968
... More
Building work;Brick Masonry with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work.
12.97
-
89702
... More
Building work;Brick Masonry with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work.
40
-
258394
... More
Building work;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick
2.94
-
2218
... More
Building work;Randum rubble stone Masonry in superstructure with CM (1:8) prop: withgranite stones from approved quarry including cost and conveyance of all materials labour charges seiniorage charges scaffolding and curing etc., for superstructure walls forr. Toilet Block
22.45
-
93914
... More
Building work;Supply and fixing of Door size1.20x2.10 Mts Double Leaf with Door Frame medium take wood section 100x65mm, along with double flush door shutter solid bond wood block board type with commercial ply on both faces 35mm thick with Lamination 1mm thick on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 3 nos, MSPC Handles 125 mm Long 1 No MSPC Tower Bolt 150mm long 2 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and heavy duty door stopper 1 No including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.Ground floor
4
-
39395
... More
Building work;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
243.14
-
88705
... More
Building work;Providing Impervious Plastering with CM(1:3) Prop: 20mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
64.12
-
31067
... More
Building work;Providing Impervious Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
154.37
-
54218
... More
Building work;Plastering to even surfaces of wall with CM(1:5) Prop: 12 mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Ground FLOOR
382.85
-
130115
... More
Building work;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904
307.4
-
143650
... More
Building work;Plastering 20mm thick in Prop:(1;5 ) single coat and dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) Ground floor
40
-
13883
... More
Building work;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls for Ground floor
605.99
-
25179
... More
Building work;Flooring with ceramic tiles Non-skid red or white full body Ceramic floor tiles of size 300x300mm and thickness between 7-8 mm 1st quality conforming to IS:13711,IS:13712, IS:13630(Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work.
78.04
-
72738
... More
Building work;Flooring with Vitrified Polished floor tiles with of size not less than 598 X 598 mm,and thickness 8 mm 1st quality conforming to IS 13711,IS:13712,IS:1360(parts 1 to 15) of any colour and finish in all Shades and designs set over base coat of cement morter (1:8), 12 mm thick over CC bed already laid or RCC roof slab including neat cement slurry of honey like consistency spread@ 3.3@kgs, per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost of all materials like cement sand water and tiles etc., complete etc, completed for First Floor
130
-
128606
... More
Building work;Providing Skirting to internal walls to 15 cm height and risers of steps with vitrified polished floor tiles os size not less than 598x598 mmx8 thickness, GROUND FLOOR regular finish and normal colours of make Jhonson & Jhonson,Kajaria,Nirco,Marbonite set over base coat of CM (1:5) 12 mmthick with cement slurry oh honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with materials like tiles cement sand and water ete., complete including seigniorage charge cost of all etc complete for finished item of work GROUND FLOOR
10
-
9983
... More
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in Ground floor
20.16
-
4039
... More
Building work;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof Redoxide Primer Grade- 1 after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in Ground floor
21.42
-
2452
... More
Building work;Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)
307.4
-
64033
... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in All floor. (APSS No.126)
6.5
-
413640
... More
Building work;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) Septic Tank
9.26
-
38085
... More
Building work;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)
0.33
-
1705
... More
Building work;Dadooing to walls with red or white full body ceramic wall tiles of size 200x300mm/ 245 mm x325mm and thickness 6 mm 1st quality conforming to IS:13711,IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, and all opertional, incidental and all labour charges such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work in all floors
99.18
-
56145
... More
Building work;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, with water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
173.9
-
1057642
... More
Building work;Providing and fixing in position 12.5 mm thick mastic pad in expansion joint 650mm deep for fixed ends of simply supported spans, covered with sealant including cost and conveyance of all material to site and labour charges as per drawing and technical specifications 1207.2 MORD / 2600 MORTH complete for finished item of work.
153
-
56090
... More
Building work;Supplying & Fixing Nominal Bore 50 mm dia GI medium grade pipes properties & weight conforming to revelent IS Code 1239 including ISI mark with GI fittings tees, elbows bends reducers couplings union flanges ets with necessary excavation in type of soils except rock requiring blasting, refilling chasing walls chasing masonry and making good teh walls and
3
-
1486
... More
Building work;Supplying & Fixing Nominal Bore 32 mm dia GI medium grade pipes properties & weight conforming to revelent IS Code 1239 including ISI mark with GI fittings tees, elbows bends reducers couplings union flanges ets with necessary excavation in type of soils except rock requiring blasting, refilling chasing walls chasing masonry and making good teh walls and
18
-
7342
... More
Building work;Supplying & Fixing Nominal Bore 25 mm dia GI medium grade pipes properties & weight conforming to revelent IS Code 1239 including ISI mark with GI fittings tees, elbows bends reducers couplings union flanges ets with necessary excavation in type of soils except rock requiring blasting, refilling chasing walls chasing masonry and making good teh walls and
16
-
4690
... More
Building work;Supplying & Fixing Nominal Bore15 mm dia GI medium grade pipes properties & weight conforming to revelent IS Code 1239 including ISI mark with GI fittings tees, elbows bends reducers couplings union flanges ets with necessary excavation in type of soils except rock requiring blasting, refilling chasing walls chasing masonry and making good teh walls and
12
-
2441
... More
Building work;Supplying & Fixing Nominal Bore 20mm dia GI medium grade pipes properties & weight conforming to revelent IS Code 1239 including ISI mark with GI fittings tees, elbows bends reducers couplings union flanges ets with necessary excavation in type of soils except rock requiring blasting, refilling chasing walls chasing masonry and making good teh walls and
11
-
2475
... More
Building work;Supplying & Fixing tested 50 mm gun metal peet value of Gunmetal gate (GM peet) valve as per IS-778 class-1 Indian make heavy type - make or equivalent screwed type 1st quality of approved type including cost and conveyance of all materials to site, all labour charges sales and other taxes on all materials etc complete.
1
-
3585
... More
Building work;Supplying & Fixing tested 32mm gun metal peet value of Gunmetal gate (GM peet) valve as per IS-778 class-1 Indian make heavy type - make or equivalent screwed type 1st quality of approved type including cost and conveyance of all materials to site, all labour charges sales and other taxes on all materials etc complete.
2
-
3622
... More
Building work;Supply and fixing 12.7 mm NP bib tap Indian make 300 grams Seiko/Nice/Senior or equivalent including cost and conveyance of all materials to site. All labour charges sales and other taxes on all materials etc. complete
6
-
1520
... More
Building work;Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan point and seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.
150
-
13188
... More
Building work;Supply and fixing of ISI mark 25mm dia 1.8mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan point and seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.
100
-
9880
... More
Building work;Supplying and fixing 8 way SPN Distributions board with IP-30 protection of make millitec/Suptnik/Crystal/Bentec/Gold medal suitable for single phase 40A Double pole Isolator of marks standard /Havells/HPL/Toyoma as incomer and 10KA single pole miniature circuit breakers six numbers as out going with internal connections including cost and conveyance of all materials to site labour charges surface/flush
2
-
8473
... More
Building work;Supplying and fixing 4 way SPN Distributions board with IP-20 protection of make millitec/Suptnik/Crystal/Bentec/Gold medal suitable for single phase 40A Double pole Isolator of marks standard /Havells/HPL/Toyoma as incomer and 10KA single pole miniature circuit breakers six numbers as out going with internal connections including cost and conveyance of all materials to site labour charges surface/flush
1
-
6341
... More
Building work;Providing independent earth work for main switches integrated circuit cutouts and moters with 40mm dia 'B'class GI pipe TATA /Zenith/GST make of 2.5 m length duly providing 12mm dia 16no's holes and rewiredbolts nuts washers,checknuts, Humepipe GI wire No 8 SWG including filling
2
-
7911
... More
Building work;Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/ Suncab/ Paragaon / FortuneArt make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work for light, bell, fan and exhaust fan points in Non-Residential Buildings (SSR-2012-13, item No. 2.1.1)
50
-
26430
... More
Building work;Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor / Gold medal olive / Million zoom make with ISI mark on a common switch board with earth continuity including wire leads, earth connections including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
16
-
2399
... More
Building work;Supply and run of 2 of 36/0.3mm (2.5 Sqmm) PVC insulated flexible copper cable of make Standard / Havells /HPL / Toyoma in existing PVC conduit pipe circuits, MV Lamp/Security light points including laboiur charges (Phase, Neutral and earth) and run of 1 of 1.0 sqmm copper cable for earthin
250
-
24050
... More
Building work;SUPPLY AND FIXING OF 4 OF 10 SQMM WPSC FOR SERVICE MAINS ALONG WITH ALL NECESSARY ITEMS
40
-
5154
... More
Building work;supply and fixing of 1 x 36 /40 W Patty type Tube Light Lumanaries powder coated CRCA sheet steel housing with copper chokes and all standard accessories labour charges with 40Watt Tube light etc.,complete for new installation. Maru Make ;Crompton /Bajaj/Surya/HPL
19
-
9698
... More
Building work;supply and fixing of batton Holder/Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40Watt bulb etc.,complete for new installation. Maru Make ;Crompton /Bajaj/Surya/HPL
16
-
1805
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements