Tribal Welfare Engineering Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Civil And Construction
Building Construction
Opening Date3 Nov 2020
Closing Date11 Nov 2020
Tender Amount₹ 45,77,482 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
357163Bid Award Id
ViewTender No
01/2020-21/SE,Zone-II/TW/VJA/NABARD XXV/SECOND CALLTender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Augmentation of Infrastructure;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) Toilet Block
0.4
-
2025
... More
Augmentation of Infrastructure;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) Third Floor
0.1
-
612
... More
Augmentation of Infrastructure;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)Second Floor
0.25
-
1411
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings. Toilet Block
12.5
-
115033
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal Toilet Block
2
-
19556
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard supplie rs approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns Toilet Block
2.25
-
25426
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns SECOND FLOOR
7.2
-
94618
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns THIRD FLOOR
0.9
-
12824
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pilnth Beams Toilet block
2.75
-
32226
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Toilet Block
3.5
-
33807
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Second Floor
15
-
166507
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Third Floor
1.5
-
18010
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 150mm thick WATER TANK BOTTOM SLAB
24.21
-
50324
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 150mm thick WATER TANK SIDE WALLS Third FLOOR
27
-
76707
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick Toilet Block
87.64
-
102057
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick SECOND FLOOR
210
-
280403
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick WATER TANK TOP SLAB
22.63
-
32692
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 140mm thick SECOND FLOOR
60
-
86118
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for shelves of of 50mm thick SF
11
-
9446
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 75mm thick slab FOR WINDOW BOX PLANKS
15.22
-
15770
... More
Augmentation of Infrastructure;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick Waist slab SF
19
-
31998
... More
Augmentation of Infrastructure;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels Third FLOOR
0.05
-
673
... More
Augmentation of Infrastructure;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels SECOND FLOOR
1.15
-
14345
... More
Augmentation of Infrastructure;Brick Masonry in superstructure with CM (1:6) prop with flyash cement solid blocks of size 290 x 200 x 140mm for manufacturing of flyash solid blocks usingflyash of 80kgs, cement of 15 kgs Gypsum of 5kgs and stone and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials labour charges, seiniorage charges,scaffolding and curing etc., for superstructure walls for Community work. Toilet Block
43.82
-
261855
... More
Augmentation of Infrastructure;Brick Masonry in superstructure with CM (1:6) prop with flyash cement solid blocks of size 290 x 200 x 140mm for manufacturing of flyash solid blocks usingflyash of 80kgs, cement of 15 kgs Gypsum of 5kgs and stone and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials labour charges, seiniorage charges,scaffolding and curing etc., for superstructure walls for houses work. Third FLOOR
7.5
-
56561
... More
Augmentation of Infrastructure;Brick Masonry in superstructure with CM (1:8) prop: with flyash cement solid blocks of size 290 x200 x 140 mm for manufacturing of flyash solid blocks using flyash of80 kgs cement of 15 kgs Gypsum of 5kgs and stone dust with a compressive strength not lessthan 50kg/sqm including cost and conveyance of all materials labour charges seiniorage charges scaffolding and curing etc., for superstructure walls forr. SECOND FLOOR
60
-
419784
... More
Augmentation of Infrastructure;Reinforced Brick Masonry in Walls 7cm CM (1:6) prop: with using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 35 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. SECOND FLOOR
52
-
42131
... More
Augmentation of Infrastructure;Reinforced Brick Masonary walls of 11.50cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. Third FLOOR
70
-
85005
... More
Augmentation of Infrastructure;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks having a crushing strength of not less than35.00kg/cm2 and using two mild steel bars of 6m dia in evey third layer of brick masonry, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved source to work site and all operational incidental labour charges such as scaffoldings maxing mortor constructing masonary lift charges curing etc. complete but exclusing the cost of steel and its fabrication charges
48
-
45892
... More
Augmentation of Infrastructure;Supply and fixing of Door size1.20x2.10 Mts Double Leaf with Door Framemedium take wood section 100x65mm, along with double flush door shutter solid bond wood block board type with commercial ply on both faces 35mm thick with Lamination 1mm thick on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 3 nos, MSPC Handles 125 mm Long 1 No MSPC Tower Bolt 150mm long 2 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and heavy duty door stopper 1 No including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of Second floor
10.5
-
39207
... More
Augmentation of Infrastructure;Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm anglazed shutters fly mesh and a 20 mm provisions cut to length metrejointed with corner bracket centre mullion fixed with mullion cap, stay, handles, latch 2 no;sof hpivot hinges per shutter and panelled with 5mm thick plain float glass and SS mesh for fly mesh shutter (304 grade) fitted using rubber gaskets including fixing the window in the concrete/masnory wall bymeans of self expanding screws including 10 mmsquare guard bars with 6"(152.4mm) pitch 3.0x4.0(914.4mmx1219.2mm) and 4'0"x4'0"(1219.2mm)x 1219.2 mm) outer frame section size of 72x 50 mm shutter frame section size of 48x 25 mm Mullion section size of 72x50 mm Second Floor item of work double shutter
23
-
188147
... More
Augmentation of Infrastructure;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Toilet Block
55
-
18856
... More
Augmentation of Infrastructure;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for SECOND FLOOR
325
-
132657
... More
Augmentation of Infrastructure;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Third FLOOR
60
-
26452
... More
Augmentation of Infrastructure;Accoproof Plastering with CM(1:3) Prop: 20mm thick in single coat spong finishincluding mixing kg of Accoproof powder per bag of cement including cost and conveyance of all materials like cement sand,water,etc, to site including seigniorage charges, sales& other taxes on all materials all operrational incidental charges and labour charges such as mixing mortar, finishing curing etc.complete. for finished item of work (APSS 901,906) Third FLOOR
45
-
24371
... More
Augmentation of Infrastructure;Plastering to even surfaces of wall with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Toilet Block
86
-
27419
... More
Augmentation of Infrastructure;Plastering to even surfaces of wall with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) second FLOOR
430
-
160472
... More
Augmentation of Infrastructure;Plastering to even surfaces of wall with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Third FLOOR
40
-
16015
... More
Augmentation of Infrastructure;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) Toilet Block
89
-
39024
... More
Augmentation of Infrastructure;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)Third FLOOR
190
-
103628
... More
Augmentation of Infrastructure;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) Second floor
320
-
163123
... More
Augmentation of Infrastructure;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls for Second floor
819
-
23489
... More
Augmentation of Infrastructure;Flooring with Nano Polished stain free full body orcelain vitrified tiles with of soze 600 x 600 mm,and thickness between 8-10 mm 1st quality conforming to IS 13711,IS:13712,IS:1360(parts 1 to 15) of any colour and finish in all Shades and designs set over base coat of cement morter (1:8), 12 mm thick over CC bed already laid or RCC roof slab including neat cement slurry of honey like consistency spread@ 3.3@kgs, per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost of all materials like cement sand water and tiles etc., complete etc, completed for Second Floor
245
-
249469
... More
Augmentation of Infrastructure;Providing Skirting to internal walls to height of 15 cm and Risers with Nano polished vitrified tiles with Jhonson & Jhonson,Kajaria,Nitco and Marbonite set over base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.3okgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., completed for finished item of work., SECOND FLOOR
27
-
27730
... More
Augmentation of Infrastructure;Flooring with ceramic tiles 7.3 mm thick of 1st qulaity all shades of makes Jhonson & Jhonson, Kajaria,Nitco and Marbonite, set over base coat of cement mortar (1:8) ,12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3 kgs per sqm & jointed neatly with white cemetn paste to full depth mixed with pigment of matching shade,including cost of all materials like cement sand, water and tiles etc., complete, including seigniorage charges etc., complete for finisehd item of work. Toilet block
37
-
33130
... More
Augmentation of Infrastructure;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All floor
45
-
8547
... More
Augmentation of Infrastructure;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)
440
-
55964
... More
Augmentation of Infrastructure;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 40mm,20 mm,10mm, size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all material like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges sale& other taxes on all materials, all operational, incidental and labour charges such as mixing concrate in concrete mixer, laying curing concrete, etc., complete for finished item of work (APSS No.402) fpr septic tank concrete, etc, complete for finished item of work (APSS No.402)
1.8
-
8913
... More
Augmentation of Infrastructure;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for SECOND FLOOR
0.75
-
6864
... More
Augmentation of Infrastructure;Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st. quality of any bramd as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work. Toilet Block
82
-
69235
... More
Augmentation of Infrastructure;Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) Second Floors
430
-
78202
... More
Augmentation of Infrastructure;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in All floor. (APSS No.126)
11.55
-
665050
... More
Augmentation of Infrastructure;Supply and fixing of SWR PVC pipes (prince/Sudhakar) 4kg/sq.cm and fixing all special such as plain bends. Off sets, door bends, signle junctions double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges overheads & contractors profit complete for finished item of work at all floor level (APSS No.1302,1319 & 1326) for 75 mm dia
50
-
8067
... More
Augmentation of Infrastructure;Supply and fixing of SWR PVC pipes (prince/Sudhakar) 4kg/sq.cm and fixing all special such as plain bends. Off sets, door bends, signle junctions double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges overheads & contractors profit complete for finished item of work at all floor level (APSS No.1302,1319 & 1326) for 110mm dia
50
-
11743
... More
Augmentation of Infrastructure;Supplying & fixing CI Nahani traps 1st qulaity ISI marked conforming to IS:1729-1979 with CP Grating fixing with white cement as per site requirement with standard practice 100 mm dia Inlet -75 mm (3") outlet pipe - 4 kgs with NP cover for all floors, including cost and conveyance of all materials to site, all labour charges. sales and other taxes on all materials etc., complete for finished item of work(APSS No.1326) for all floors
18
-
5891
... More
Augmentation of Infrastructure;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, sales and other taxes on all materials etc., complete for finished item of work. (A.P.S.S. No. 1325).
4
-
25077
... More
Augmentation of Infrastructure;Supplying & fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper tubes size( 1/2 to 2) for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work all floors levels 34.90mm OD Pipe
50
-
10965
... More
Augmentation of Infrastructure;Supplying & fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper tubes size( 1/2 to 2) for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work all floors levels 28.60mm OD Pipe
100
-
13975
... More
Augmentation of Infrastructure;Supplying & fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper tubes size( 1/2 to 2) for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work all floors levels 15.90 OD Pipe
100
-
6025
... More
Augmentation of Infrastructure;Supplying and fixing 580 mm x 440 mm long Orisa pan white glazed Water Closet 1st quality ISI marked confirming to IS 2556-3-1981 with "P" or "S" trap, ISI marked and providing masonry seat, CC squatting plate and 10 litres capacity signle flush PVC low level cistern with internal components fixed on 2 No's of teak wood blocks of size 76.20 mm x 101.60 mm using required size of nails , screwas as approved by ENginee-in-Chief angle stop cock 12.70 mm dia. first quality indian make heavy duty, 12..70 PVC connection with PVC connection with brass union nuts CP coated, 31.75 mm brass plumbers union P traps or S trap of Indian WC shall be encased on CC (1:2:4) 150 mm alround well above the joint to stop leakage at the joint etc, complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges overheads& contractors profit etc., complete for finished item of work.
14
-
26675
... More
Augmentation of Infrastructure;Constructing 457.2 x 457.2 mm (1'6"x 1'6") brick in CM 1:6 prop: Masonry inspection chamber upto 914.4 mm (3'0") and fitted with ligh weight 457.2 mm x 457.2 mm (1'6"x1'6") CI frame and cover of 20 kg including cost and conveyance of all materials like cement,sand, bricks, water etc., to site, cost of seigniorage charges on all materials adn all incidental and opertional, labour charges like mixing cement mortar, constructing masonry lift charges curing overheads & contractors profit etc., complete for finished item of work as per standard specification
4
-
14715
... More
Augmentation of Infrastructure;Supplying and fixing ceramic Soap dish duly embeded in the Brick Masonry wall complete for finished item of work for all floors. Including cost and conveyance of all materials to site, all labour charges sales and other taxes on all materials etc., complete for finished item of work for all floors
18
-
2454
... More
Augmentation of Infrastructure;Supplying and fixing TV shape mirror with plastic frame size 609.6 x 457.20mm including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
4
-
2055
... More
Augmentation of Infrastructure;Supplying and fixing of 25.4 mm dia and 609.6 mm long allumininum anodized towel rods with brackets and allumininium screwes fixed into the wall over wooden gutties etc., incluidng cost and conveyance of all materials to site, all labour charges sales, and other taxes on all materials etc., complete for finished item of work for all floors.
20
-
3318
... More
Augmentation of Infrastructure;Supplying and fixing INDIAN FLAT make hand wash basin of size 550 x 400 mm of PARRYWARE company or other approved brands including all fixtures and connections
4
-
10394
... More
Augmentation of Infrastructure;Supplying & Fixing N.P bib taps of size:12.70 mm dia of Indian make heavy duty as approved by the Engineer-in-Chief including cost and conveyance of all materials labour charges, oveheads 300 grams Seiko / Nice/ Senior or equivalent including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors. 300 grams Seiko
36
-
9122
... More
Augmentation of Infrastructure;Supply and Fixing European Water Closet of 1st quality conforming to IS:2556-part-2-1973 of white Glazed with"S" ' trap, Supplying and fixing best Indian make plastic seat and lid for European water closets with rubbers or plastic Buffers as per IS 2548-1996 and 10 litres capacity signle flush PVC low level cistern with internal components and fixed using required size of nails and screws, angle stop cock 12.70 mm dia. first quality Indian make heavy duty, 12 mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site. overheads & contractors profit etc., complete for finished item of work for all floors
2
-
8460
... More
Augmentation of Infrastructure;Making Green Chalk Boards of size 3.00x1.20 mts including border with plastering in CM(1:2) 12 mm thick as base coat and 3 mm top coat with cement green oxide powder (1:1)and making border in CM(1:2) of 50 x 20 mm thick allrounded the chalk board over existing plastered and painting the chalk board surface with chalk board paint as per direction of Engineer-in-Charge including cost, conveyance of all materials sales and other taxes on cost of all materials and all operational incidental and labour charges etc., complete for finished item of work (APSS No:1603)
4
-
12840
... More
Augmentation of Infrastructure;providing impervious coat to exposed RCC roof slab surfface with CM(1:3),20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials seigniorage,excluding conveyance charges of materials and including all operational,incidental and labour charges for mixing mortar,laying,rendering smooth and thread,lining curing, rounding off junctions of wall and slab etc., complete for finished item of work
270
-
138275
... More
Augmentation of Infrastructure;providing impervious coat to exposed RCC roof slab surfface to required slopes with CM(1:3),20mm thick (average) mixed with water proofing compound laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45 x 45 cm incluidng cost and conveyance of all materials like sand, water proofing compound, water, etc, to site, including seigniorage charges, sales& otehr taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining curing including rounding off juncitons of wall and slab etc., complete for finished item of work( APSS No.901& 903) for impervision coat CM(1:3) ,20 mm F-1 Centering with wood upto 3.66 lift Machinery
76.23
-
34549
... More
Augmentation of Infrastructure;Cost supply and fixing of RCC precast ventilators of 50 mm thick
2.88
-
1113
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements