Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Opening Date21 Jan 2021
Closing Date4 Feb 2021
Tender Amount₹ 39,83,994 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of bridge work;Vibrated plain / reinforced cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work for footings of Abutments, Piers, Wing walls and Raft foundations

98

-

569213

... More
Construction of bridge work;Vibrated reinforced cement concrete design mix M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRTH specification 1500,1600,1700 & 2200 (4th revision ) and 800, 1205.4, 1205.5 MORD and as directed by the Engineer-in-Charge for deck slab & Bed blocks.

46

-

369398

... More
Construction of bridge work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per technical specification MoRT&H 1500, 1600,1700, & 2702 (4th Revision) and 800, 1206.3 MORD as directed by the Engineer-in-Charge complete for finished item of work for wearing coat over Deck Slab

21

-

146784

... More
Construction of bridge work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (4th Revision) and 1204.3.8 MORD complete for finished item of work

10

-

20032

... More
Construction of bridge work;Providing and fixing in position 25 mm thick mastic pad in expansion joint 650mm deep for fixed ends of simply supported spans, covered with sealant including cost and conveyance of all material to site and labour charges as per drawing and technical specifications 1207.2 MORD / 2600 MORTH complete for finished item of work.

12

-

7544

... More
Construction of bridge work;Providing weep holes in plain / reinforced concrete Abutments, Return walls and wing walls with 100mm Diameter AC pipe Class-25 extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., as per technical specification MoRT&H 2706 & 2200 (4th Revision), 614, 709, 1204.3.7 MORD complete for finished item of work for weep holes.

12

-

6763

... More
Construction of bridge work;Back filling behind Abutments with gravel including cost and conveyance of all materials to site, and seigniorage charges of all materials and labour charges etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (4th Revision) and 1204.3.8 MORD as per Drawing and complete for finished item of work.

54

-

35516

... More
Construction of bridge work;Bailing out water for earth work excavation /concrete for foundation below water level. (For building items only) - Other than sandy soil - 2.0 M to 3.0 M

836

-

279224

... More
Construction of bridge work;Bailing out water for earth work excavation /for concrete foundation below water level. (For building items only) Sandy soil - 1.0 M to 2.0 M

132.62

-

79174

... More
Construction of bridge work;Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars upto 36mm diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per technical specification MoRT&H 1600 & 2200 (4th revision) and 1002, 1005, 1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Super structure.

5.5

-

302262

... More
Construction of bridge work;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H (4th Revision) Specification Clauses 2900, 2905 & 2906, IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.

5

-

31526



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.