To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tribal Welfare Engineering Department - TWED Tender
Building Construction
Opening Date3 Jan 2021
Closing Date18 Jan 2021
Tender Amount₹ 31,20,635 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
367827Bid Award Id
ViewTender No
05/2020-21/EE/TW/NelloreTender Authority
Tribal Welfare Engineering Department ViewPurchaser Address
-Website
http://http://www.aptribes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings for Compound wall
12
-
110498
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for plinth beams for Compound wall
15
-
175863
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Column for Compound wall
3
-
34078
... More
Construction of Girijan Bhavan Balance work;Brick Masonry in superstructure with CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Compound Walls.
5.01
-
29415
... More
Construction of Girijan Bhavan Balance work;Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid blocks of size 290 x 110/120 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Compound Walls.
48.44
-
289848
... More
Construction of Girijan Bhavan Balance work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126) for Compound wall
3.35
-
211994
... More
Construction of Girijan Bhavan Balance work;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Compound wall
459.9
-
157743
... More
Construction of Girijan Bhavan Balance work;Plastering to even surfaces of wall with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Compound wall
390.7
-
137536
... More
Construction of Girijan Bhavan Balance work;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls for Compound wall
850
-
35318
... More
Construction of Girijan Bhavan Balance work;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310 for CC Pavement
23
-
16036
... More
Construction of Girijan Bhavan Balance work;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) path way
4
-
15184
... More
Construction of Girijan Bhavan Balance work;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete path way
2
-
11270
... More
Construction of Girijan Bhavan Balance work;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation Kitchen Cum Dining
77.62
-
26371
... More
Construction of Girijan Bhavan Balance work;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed for Kitchen Cum Dining
20.12
-
76378
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings for Kitchen Cum Dining
5.93
-
54605
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal for Kitchen Cum Dining
1.7
-
16632
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Column for Kitchen Cum Dining
3.82
-
43393
... More
Construction of Girijan Bhavan Balance work;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) for Kitchen Cum Dining
26.37
-
100097
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for plinth beams for Kitchen Cum Dining
7.85
-
92035
... More
Construction of Girijan Bhavan Balance work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310 for Kitchen Cum Dining
89.08
-
3038
... More
Construction of Girijan Bhavan Balance work;Brick Masonry in superstructure with CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Superstructure Walls for Kitchen Cum Dining
67.57
-
446253
... More
Construction of Girijan Bhavan Balance work;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Kitchen Cum Dining
55.35
-
18985
... More
Construction of Girijan Bhavan Balance work;Plastering to even surfaces of wall with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Kitchen Cum Dining
100.45
-
35361
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams for Kitchen Cum Dining
6.8
-
64730
... More
Construction of Girijan Bhavan Balance work;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 115mm thick for Kitchen Cum Dining
118.29
-
128765
... More
Construction of Girijan Bhavan Balance work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126) for Kitchen Cum Dining
6
-
379691
... More
Construction of Girijan Bhavan Balance work;Flooring with ceramic tiles Non-skid red or white full body Ceramic floor tiles of size 300x300mm and thickness between 7-8 mm 1st quality conforming to IS:13711,IS:13712, IS:13630(Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work for Kitchen Cum Dining
163.08
-
151820
... More
Construction of Girijan Bhavan Balance work;Providing Skirting to internal walls to height of 15cm and Risers with ceramic tiles Non-skid red or white full body Ceramic floor tiles of size 300x300mm and thickness between 7-8 mm 1st quality conforming to IS:13711,IS:13712, IS:13630(Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete etc., complete for finished item of work for Kitchen Cum Dining
18.26
-
11340
... More
Construction of Girijan Bhavan Balance work;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) for Kitchen Cum Dining
96.88
-
20181
... More
Construction of Girijan Bhavan Balance work;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911) for Kitchen Cum Dining
55.35
-
7485
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of Door size 1.20 x 2.10 M Double Leaf with Door Frame of Medium Teak wood Section 100 mm x 65 mm along with Double flush door shutters solid bond wood block board type with commercial ply on both faces 35mm thick including fixtures such as Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 125 mm Long 2 Nos, MSPC Tower Bolt 150mm long 2 Nos, MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and Heavy Duty Door Stopper 2 Nos., including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work for Kitchen Cum Dining
2
-
18969
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of Door size 0.98 x 1.98 M Single Leaf with Door Frame of Medium Teak wood Section 100 mm x 65 mm, and Single flush door shutter solid bond wood block board type with commercial ply on both faces 35mm thick Hardware fixtures ie., MSPC Butt Hinges 150mm Long 3 nos, MSPC Handles 125 mm Long 1 No, MSPC Tower Bolt 150mm long 2 Nos, MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos, and Heavy Duty Door Stopper 1 Nos., Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work for Kitchen Cum Dining
2
-
15049
... More
Construction of Girijan Bhavan Balance work;Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for finished item of work Centre fixed both side openable shutter window 5?0?x4?0? (1524mm x1219.2mm). Outer frame section size of 72x50mm. Shutter frame section size of 48 x 25 mm. Mullion section size of 72x50mm. Fixed beading section size of 12 x 12 mm.
10.8
-
80212
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe Sudhakar / Macoplast / Modi make concealed in wall with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan pointand seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.
50
-
5272
... More
Construction of Girijan Bhavan Balance work;Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper Cable GM/L&T/RPG/Havells/V-Guard/Power Flex/Polycab/Gold Medal/ Standard /Milion/ Vimal/ Suncab/ Paragaon/FortuneArt make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work for light, bell, fan and exhaust fan points in Non-Residential Buildings
30
-
18244
... More
Construction of Girijan Bhavan Balance work;Supply and run of 1of 36/0.3mm (2.5 sq.mm) FR / FRLS P.V.C. insulated ISI Copper Cable of makes KEI / Polycab/ Havells /GM / Million/ HPL / Gold Medal / Power Flex/ RPG/ Anchor / Sun Cab / Fortune Art / Great white in existing metallic / non-metallic conduit pipe for earth continuity including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
25
-
1835
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor / Gold medal olive / Million zoom make with ISI mark on a common switch board with earth continuity including wire leads, earth connections including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
3
-
450
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of batten holder /Pendent Holder/ slanting holder Anchor / Gold medal olive / Million zoom make with ISI mark in lieu of ceiling rose of light point with 40W bulb all connections including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
10
-
971
... More
Construction of Girijan Bhavan Balance work;Supply and Fixing of 1x36W Box type tube light luminaire powder coated CRCA sheet steel housing with Electronic Ballast Chokes and all standard accessories. Makes: Crompton / Bajaj / Surya / RK / Million / Gold Medal voltage range of 90 volts to 350 volts power factor > 0.98 current less than 130ma crest factor and total hormonic distortion shall be as per IS Specification with auto cut off at high voltage suitable for 36/40W tube on Teak Wood round block including all labour charges etc., complete including interconnections.
15
-
16111
... More
Construction of Girijan Bhavan Balance work;Supply and errecting ceiling fan of Crompton / Orient atom make as per IS 374 - 1979 and with 3 blades and double ball bearings and with condenser AC 250V 50 C/S of 48" 1200mm sweep completely erected in position without regulator, canopy down rod up to 301.80 mm in length is provided with hook/clamps nuts and bolts and 24/02 flexible copper wire etc., complete and pointed with lettering by enamil paint the Sr. No. and date of errection including cost and conveyance of all materials and labour chargers etc., complete including 4% tornover tax on cost of all materials for finished item of work.
8
-
22786
... More
Construction of Girijan Bhavan Balance work;Supply and fixing of Stepped type Electronic Regulator of makes GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry / Great white Omega make with ISI mark on a common switch board including wire leads, including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
10
-
2911
... More
Construction of Girijan Bhavan Balance work;Supply and fixing 8 way SPN Distribution board with IP-20 protection of make Siemens / GE/ ABB/ GM /Standard/ Havells / HPL / Hager suitable for single phase 40A Double pole Isolator of make Siemens / GE/ ABB/ GM /Standard/ Havells / HPL / Hager as incomer and 10KA-6-32A range single pole miniature circuit breakers Six numbers (6Nos) as out going with internal connections including cost and conveyance of all materials to site, labour charges for surface / flush mounting etc., sales tax complete for finished item of work.
1
-
4077
... More
Construction of Girijan Bhavan Balance work;Supply and Fixing of 16A flush type switch socket socket (2 in 1) make of GM G Home /Gold Medal Olive / Million Zoom / Anchor Penta Cherry /Great white Omega with ISI mark duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth ontinuity including cost and conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
2
-
839
... More
Construction of Girijan Bhavan Balance work;Supply and run of 2 of 84/0.3mm (6.0 sqmm) FRLS / HFFR PVC insulated ISI Copper cable of makes KEI / Polycab/ Havells /GM / Million/ HPL / Gold Medal / Power Flex/ RPG/ Anchor / Sun Cab / Fortune Art / Great white in existing metallic / non-metallic conduit pipe for mains including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
20
-
3332
... More
Construction of Girijan Bhavan Balance work;Supply and run of 2 of 56/0.3mm (4Sq.mm) Fire Retardant P.V.C. insulated flexible copper cable of KEI/GM/Anchor/ RPG/ Havells / Sun Cab /Power Flex/ Polycab/ Gold Medal/ Great White / Milion/ Vimal/ Suncab/FortuneArt/HPL in existing metallic / non metallic pipe with run of 1 of 14/0.3mm (1Sq.mm) of above makes of wires, Fire Retardant P.V.C. insulated flexible copper cable including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
20
-
2673
... More
Construction of Girijan Bhavan Balance work;Supply and transportation of 45W LED Flood light Luminaire made of pressure diecast alluminium housing with powder coated,having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >95lm/W and junction temprature < 70°C, with Ingrees protection IP65, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK05, Driver surge protection 4KV, external Surge protection = 5KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, etc., complete a) LUMINAIRE MAKE : WIPRO / PHILIPS / Lighting Technologies(LT) / GE /CROMPTON / BAJAJ / VIN / HAVELLS/CAPART(PREMIUM) b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.
1
-
6312
... More
Construction of Girijan Bhavan Balance work;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
6
-
22073
... More
Construction of Girijan Bhavan Balance work;Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , Overheads & Contractors profit etc., complete for finished item of work.
10
-
3272
... More
Construction of Girijan Bhavan Balance work;Supplying & Fixing 12.7mm N.P bib tap Indian make 400 grams Seiko / Nice/ Senior or equivalent including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
30
-
11897
... More
Construction of Girijan Bhavan Balance work;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work.
1000
-
5700
... More
Construction of Girijan Bhavan Balance work;Supplying and fixing 25mm dia Nominal Bore G.I. Medium grade pipes properties & weight confirming to relevant IS code 1239 including ISI mark with GI fittings tees, elbows, bends, reducers, couplings, union flanges etc., with necessary excavation in all types of soils except rock requiring blasting, refilling chasing walls, chasing masonry and making good the walls and floors to the original surface and fixing M.S. clamps and T. W. block on walls complete including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
25
-
7330
... More
Construction of Girijan Bhavan Balance work;Supplying and fixing 40mm dia Nominal Bore G.I. Medium grade pipes properties & weight confirming to relevant IS code 1239 including ISI mark with GI fittings tees, elbows, bends, reducers, couplings, union flanges etc., with necessary excavation in all types of soils except rock requiring blasting, refilling chasing walls, chasing masonry and making good the walls and floors to the original surface and fixing M.S. clamps and T. W. block on walls complete including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
10
-
4556