Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Opening Date1 Oct 2020
Closing Date15 Oct 2020
Tender Amount₹ 39,11,757 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Leveling Course and Flooring Bed)

60.94

-

226267.17

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) Ground Floor

0.48

-

2215.37

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.

146.87

-

1284040.35

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal

6.78

-

63031.63

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam. Ground floor

10.55

-

118245.98

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard supplie rs approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns GROUND FLOOR

9.75

-

104852.96

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Ground Floor

15.36

-

141204.48

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick GROUND FLOOR

186.6

-

206603.52

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 140mm thick GROUND FLOOR

27.83

-

33151.1

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick Waist slab GF

34.06

-

47673.78

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels Shelves & Chajjas GROUND FLOOR

1.13

-

11723.47

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels Shelves & Chajjas

0.07

-

768.09

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels For Study Platforms

1.95

-

1394.93

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 50mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work GROUND FLOOR

25

-

19611.25

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 50mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work FIRST FLOOR

0.9

-

757.8

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Brick Masonry in superstructure with CM (1:8) prop: with flyash cement solid blocks of size 290 x200 x 140 mm for manufacturing of flyash solid blocks using flyash of80 kgs cement of 15 kgs Gypsum of 5kgs and stone dust with a compressive strength not lessthan 50kg/sqm including cost and conveyance of all materials labour charges seiniorage charges scaffolding and curing etc., for superstructure walls forr. Ground FLOOR

40

-

246294

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Brick Masonry in superstructure with CM (1:8) prop: with flyash cement solid blocks of size 290 x200 x 140 mm for manufacturing of flyash solid blocks using flyash of80 kgs cement of 15 kgs Gypsum of 5kgs and stone dust with a compressive strength not lessthan 50kg/sqm including cost and conveyance of all materials labour charges seiniorage charges scaffolding and curing etc., for superstructure walls forr. First Floor

14

-

93229.5

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of Door size1.20x2.10 Mts Double Leaf with Door Framemedium take wood section 100x65mm, along with double flush door shutter solid bond wood block board type with commercial ply on both faces 35mm thick with Lamination 1mm thick on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 3 nos, MSPC Handles 125 mm Long 1 No MSPC Tower Bolt 150mm long 2 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and heavy duty door stopper 1 No including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.Ground floor

4

-

37629.28

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) GROUND FLOOR

178.28

-

58798.53

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Ground FLOOR

245.15

-

75953.6

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) First FLOOR

105

-

35365.05

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering to even surfaces of wall with CM(1:4) Prop: 20 mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for bAsement

31.5

-

9897.14

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering to new external walls with two coats of Polymer Plastic Emulsion pain of Asian/Berger/Nerolac/Saicoat/Endocem or equalent quality of approved brand and shade as approved by the Engineer-in charge over base coat of cement primer water base Grade-II exterior making three coats in all give an even shade after throughly brushing the surface to remove all lose powdered materials including cost and conveyance of all materials including cost and conveyance of all materials cost of brushes, water to site etc., sales& other taxes all operational incidental and labour charges such as in all floors external wall (APSS no.911)

291.36

-

51535.76

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) Ground FLOOR

244.07

-

102459.37

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plastering 20mm thick in two coats with base coat of 16mm thick CM(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) First floor

120.04

-

54647.61

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls for Ground floor

225.41

-

6248.37

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Flooring with Polished black kadapa stone minimum 15 mm thick of size not less than (0.457m x0.457m) set over base coat of CM (1:8) over already laid CC bed/RCC roof slab. including neat cement slurry of honey like consistency spread @ 3.3@kgs, per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost of all materials like cement sand water and tiles etc., complete etc, completed for finished iteam of work

179.65

-

104188.92

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Providing Skirting to internal walls to 15 cm height with polished shade/Tandur stone minumim 15 to 18 mm thick of size (0.254 mx 0.254m) length equal to flooring stone set over base coat of CM (1:3) 12 mm thiick with cement slurry oh honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with materials like tiles cement sand and water ete., complete including seigniorage charge cost of all etc complete for finished item of work GROUND FLOOR

14.86

-

9517.98

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in Ground floor

22.68

-

4186.5

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for Ground FLOOR

1

-

7776.2

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)

344.5

-

42390.72

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in All floor. (APSS No.126)

6

-

342344.7

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Roofing will be providing with 0.5mm thick galvanized / pre painted GI profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washers side laps are stitched with self tapping /drilling screws End laps are to be sealed with 25x3 mm B

21.6

-

18650.95

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Providing and fixing of open able Window made of pre-painted steell (base steel as per IS 513 of 0.6 mm thick galvanized as per IS 277 with zinc of 150 GSM) Primer coated with epoxy prime of 7-7 microns thick. finish painted with a polyester paint of 12-16 micron thick and back coated with 5-7 microns thick allkyd backer section for outer feame should be of 72x55mm center mullion should be of 72 x50 mm,section for fixed glass beading section should be 12 x 12 mm and section for shutters should be of 47x20 mm outer frame & Mullion section to have rebate for glazed shutter fly mesh and a 20mm provision for guard bars/grill fly mesh shutter section should be of 20x40 mm.the section are to becut to length metre joined with corner bracket centre mullion are to be fixed with mullion cap,seccotr stay seccolor handles seccolor handles,seccolor latch 2 nos of heavy duty stainless steel pivot hinges shall be provided per shutter .the window should be panelled with 5mm thick plain float glass and SS mesh for fly mesh shutter (304 grade) Rubber Gaskets are provided all arounded the glass.the above frame should be to the concrete/masonry wall by means of self expanding crews including 10 mm square guard bars with 6 (152.4 mm) completed finished item work.

16.2

-

132520.86

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.

150

-

12504

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of ISI mark 25mm dia 1.80 mm thick PVC conduit pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.

100

-

9272

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant FRLS P.V.C. insulated 1100v grade as per IS:694/1990 sepacification of flexible copper cable (ISI MARK) in existing pipe with modular type 6A/10A switch with cover frame and ceiling rose & 12 module covering plate, 12 module metal box to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

40

-

19980

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of 6A 3/2 Pin 2 Module Modular Socket with shutter with 6A 1 Way 1 Module Modular Switch control on a Common switch board/Separate board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

8

-

1118.88

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of Batten Holder/Slanting holder in lieu of ceiling rose of light point complete with allconnetions and all labour charges with 40 Watt LED bulb etc., complete for new installation.

10

-

1053.9

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and fixing of 8way SPN Distribution Board with IP-20 Protection of make Standard / Havells suitable for Single phase 40A DP Isolator and 6Nos 6-32A MCB's of make Standard / Havells as out going with internal connections, including cost and conveyance of all materials to site, labour charges for surface / flush mounting etc., sales tax complete for finished item of work.

2

-

7357.26

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and Run of 2 of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade Copper cable for mains/circuits/MV Lamp/Security light points and one run of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade Copper cable for earthing in existing conduit pipe, including cost and conveyance of all materials and all labour charges etc., complete. (Phase, Neutral and earth)

100

-

9266

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and Run of 2 of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade Copper cable for mains/circuits/MV Lamp/Security light points and one run of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade Copper cable for earthing in existing conduit pipe, including cost and conveyance of all materials and all labour charges etc., complete. (Phase, Neutral and earth)

100

-

11902

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and errecting Ceiling fan Orient make with 3 blades and double ball bearings and with condenser AC 250V 50 C/S of 48" 1200mm sweep completely erected in position, canopy down rod up to 301.80 mm in length is provided with hook/clamps nuts and bolts and 24/02 flexible copper wire etc., complete and pointed with lettering by enamil paint the Sr. No. and date of errection including cost and conveyance of all materials and labour chargers etc., complete : High Speed Fans

12

-

29821.92

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and erecting stepped type Electronic Regulator for ceiling fans 900/1200/1400mm sweep complete erected on existing board including cost and conveyance of all materials and all labour charges etc., complete.

12

-

3600.72

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply, transportation and fixing of 1x36W Box type tube light 1600/2000 lumens, ,1200mm length LED batten light luminaire powder coated CRCA Sheet steel housing with electronic ballast chokes and all standard accessories and , input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Phillips / GE / Crompton / Bajaj / VIN / Renesola b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.

11

-

11605.99

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Providing independent earthing by excavating a trench to a depth of 2.1m in all soils as per size specified in data, using 40mm dia 'B' class GI Pipe of 2.5 m length with necessery accessories duly providing 12mm dia 16 Nos. holes and rewired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No. 8 SWG inclkuding filling with equal preparation of salt and charcoal in layers and all labour charges etc., complete.

1

-

3887.56

... More
Construction of Post metric hostel (Boys)Building at Guduru(V,M) in SPSR Nellore District,Est Cost R;Supply and transportation and Fixing of 30W LED Street light Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having efficacy >120 lumines/watt, System efficacy >95lm/W and junction temprature < 70??C, with Ingrees protection IP65, Driver surge protection 4KV, external Surge protection . 5KV with optics distribution Type II medium, THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., complete.

2

-

8328.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.