Tirumala Tirupati Devasthanams Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Opening Date27 Apr 2021
Closing Date12 May 2021
Tender Amount₹ 29,89,233 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
399503Bid Award Id
ViewTender No
05/EE-VI/TTD/VJA/2021-22Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Cement Concrete (1:4:8) using 40 mm ( 0.54 cu.m), 20mm (0.27 cu.m) and 12 mm (0.09 cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete.
21
-
92340.52
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Cement Concrete (1:3:6) using 20 mm ( 0.54 cu.m) and 12 mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete.
12
-
58256.64
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Earthwork excavation and conveying the same with intial lead of 8.0 KM including all lifts, loading, un loading, all Operational, incidental,labour charges such as shoring, sheeting, planking, strutting and filling the same at the specified low level areas in layers of not more than 15 cms. thick each well watered to saturation and consolidated and leveling the filling area etc., complete for finished item of work.
1940
-
421872.4
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Supply and placing of M 25 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cu.m (707 kg),. 10 mm HBG crushed metal, 0.362 cu.m (471 kg) , sand 0.407 cu.m (616 kg.) and cement 380 kg with water cement ratio of 0.48 ( 182.40 ltrs/ cu.m of CC) etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete with cement from standard suppliers approved by the department but excluding cost of centering, shuttering charges and excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix if mixing is done by volume mixing.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Note : The design mix shall be got designed by furnishing the information required as per clause 19.1.1 &19.1.2 of IS 456-2000 by the contractor at his own cost and get approved from the competent authority before execution. The cement considered for above M25 grade concrete is 380 kg/cu.m and the rate is arrived accordingly in the estimate. After the mix is designed and approved, if there is any variation in the quantity of cement, over the cement content adopted in the estimate, the same will be considered and paid/recovered at estimate rate + T.P ( Either increase or decrease in quantity adopted in the estimate). Payment will not be made for variation in the quantity of other materials such as coarse & Fine aggregates.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;For pile caps / footings
25
-
195090.23
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;For Plinth Beams
11
-
109307.82
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Columns up to basemnt
8
-
66010.35
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Columns in First floor
8
-
81065.82
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Supply and placing of M 30 Design Mix Concrete corresponding to IS 456 using concrete mixer using of 20 mm HBG crushed metal 0.530 cum (707 kgs),. 10 mm HBG crushed metal, 0.362 cum (471 kgs) , sand 0.407 cum (616 kgs.) and cement 400 kgs with water cement ratio of 0.45 (188 ltrs/ cum of CC)etc., to site and including Seignoirage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, vibrating, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges, centering, shuttering charges for finished item of work (APSS No. 402) with cement from standard suppliers approved by the department. Note: Measurement boxes shall be used for measuring the quantities of cement, aggregate and water required for the given concrete mix if mixing is done by volume mixing.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Note : The design mix shall be got designed by furnishing the information required as per clause 19.1.1 &19.1.2 of IS 456-2000 by the contractor at his own cost and get approved from the competent authority before execution. The cement considered for above M25 grade concrete is 380 kg/cu.m and the rate is arrived accordingly in the estimate. After the mix is designed and approved, if there is any variation in the quantity of cement, over the cement content adopted in the estimate, the same will be considered and paid/recovered at estimate rate + T.P ( Either increase or decrease in quantity adopted in the estimate). Payment will not be made for variation in the quantity of other materials such as coarse & Fine aggregates.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;for culvert sab
6
-
34485
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Providing centering, shuttering and scaffolding with props and steel plates using casurina Ballies and Wooden runners & staging including all bracings, cross members as per the approved shuttering plan and other accessories as per the norms and stability calculations including cost and conveyance of all accessories etc., complete for R.C.C. Roof slabs above 150mm up to 300mm depth and up to 3.66 m of floor height including curing of RCC roof slabs removing of centering etc.,complete as directed during execution complete. (proper slopes to drain off wash/ rain water shall be provided as directed )
20
-
7369.6
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Construction of Brick Masonry in CM (1:6) using well burnt Bricks 2nd class or ground moulded (Non- modular or traditional size) from approved kilns (230 x 110 x 70 mm)including curing, cost and conveyance of all materials as directed during execution and complying with standard specifications etc., complete.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;-do- Up to Basement
53
-
285500.71
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;-do- in First floor
65
-
356401.73
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Plastering in cement mortar using best river sand from approved source including cost and conveyance of all materials, Screening, curing, rounding of corners, incidental charges as directed during execution complying with standard specifications etc., complete.
-
-
-
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;- do- In CM(1:3) 12 mm thick
20
-
3979
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;- do - in CM(1:5) 12 mm thick in first Floor
490
-
91880.65
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;- do - in CM(1:5)20 mm thick in First floor
590
-
170014.4
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Supplying & fixing in position HYSD steel bars of Fe 500 grade ( as per IS 1786-1979) of different diametres for RCC works including labour chargers for straightening, cutting,bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings. Includingcost and conveyance of steel bars including all wastage such as over laps,couplings , chairs,spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc.,completye for finished item of work in all floors
5
-
297677.95
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Supplying and fixing in position M.S. Ornamental grills for windows and ventilators or for verandah openings using M.S. Flats, square rods, angles sheets etc., of approved design weighing at the rate of 20 to 25 kg per sqm. including necessary cuttings, bending, fabrication, welding grinding and finishing smooth including painting the grills with two coats over a primary coat (total three coats) with synthetic enamel paint of approved make and color including cost of making holes in RCC or masonry works and making good the same where ever necessary, including cost and conveyance of all materials, incidental charges etc., complete.
650
-
53956.5
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Painting to new walls with two coats of Acrylic Exterior Emulsion paint - (external) over a coat of cement primer (total three coats) of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for external walls.
1500
-
256470
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Writing the sign boards, Direction boards and painting Rangolies over M.S sheet / C.C road etc., with two coats of back ground one coat primary & one coat synthetic enamel paint over the sign boards with printing two coats with synthetic enamel paint over the back ground. The rate includes cost of paint, labour charges, scaffolding etc., required for the work. The paint should be done with first quality synthetic enamel paint of approved colour and make as directed during execution.
10
-
1660.3
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Providing and fixing precast concrete blocks (interlocking pavers) for paving of M40 grade and thickness not less than 80 mm for medium traffic areas conforming to IS 15658-2006 in all shapes and designs as per the specification over sand bed of 50 mm average thickness and compacting with vibrating plate compactor having 3 tone compaction force there by forcing part of sand undeneath to come up in between joints. final compaction of paver surface to be done after spreading and brushing the fine sand into joints to its final level. The work includes cost of all materials such as cobbel stone. inter lock pavers, sand etc., Labour and equipments such as cutting machine, lift, loading & unloading to work site clearing,bringing required for the successful completion of work as per drawings and Technical Specification Clause 1504 MORD and as directed during execution by the Engineer-in- charge of the work.
680
-
400275.2
Construction of Compound wall, filling of low level areas and Providing false ceiling to TTD Kalyana;Providing and fixing in true horizontal level 600 mm x 600 mm 15 mm thick Arm strong false ceiling system manufactured by M/s Arm strong world Industries using hot dipped Galvanised Steel section exposed surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire laying fine fissured butt edge ceiling tiles of 15 mm thick mineral fiber Board manufactured by M/s Arm Strong World Industries Ltd., having RH 99% and for finished of size 600 x 600 mm including Cost & conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof making complete for finished item of work.
410
-
457076.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements