South Central Railway Tender

... More
The SCR has issued a formal invitation for competitive bids for the South Central Railway project, for Provision Of At Supply For Automatic Block Signalling (abs) Huts In Guntakal-wadi Section. in Anantapur, Andhra Pradesh, with an estimated contract value of Rs. 3,84,95,044. The bid opening date for this tender is 04-04-2024 and the last date for bid submission is 26-04-2024. Interested bidders for South Central Railway tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

South Central Railway - SCR Tender

Works
Civil And Construction
Telecommunication Services
Construction Material
Ireps
Opening Date4 Apr 2024
Closing Date26 Apr 2024
Tender Amount₹ 3,84,95,044.04 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
31 (a)-Transfer of equipment from one mast or support to other

-

-

54651.6

... More
31(t)(iii)-Dismantling of anti-creep with galv.steel wire

-

-

2034.9

... More
15(a)(iv)-Supply of 50 sq.mm Annealed stranded copper jumper wire as per latest RDSO specification

-

-

668904

... More
30(b)(iii)-Supply and erection of anti climbing device for LT supply transformer

-

-

105685.6

... More
13(ax)-Supply of 25 kV post & operating rod insulators for item 13 (a)

-

-

22088.64

... More
32/40-Supply and erection of Number Plates

-

-

96900

... More
32/7(e)-Erection of copper cross feeder wires (37/2.25 mm HDBC)

-

-

534.89

... More
8(bx)(i)-Supply of insulators for item no 8(b)(i)(ii)(iii)(v)(vi)(vii)(viii)(ix)

-

-

133851.2

... More
"Supply of MS flat of size 40 mm x 6 mm"

-

-

224000

... More
17(c)-Supply and erection of earth bus

-

-

155040

... More
31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

45220

... More
31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

80750

... More
31(t)(iv)-Dismantling of copper jumper

-

-

936.7

... More
32/31(t)(i)-Dismantling of a regulating equipment with counter weight assembly for conv. OHE

-

-

5491

... More
28(x)-Supply of 25 kV Post insulators for item 28

-

-

696068.8

... More
15(a)(i)-Supply of 160 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

413130

... More
32/8(a)(v)-Supply and erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE.

-

-

10982

... More
32/13(a) -Supply without insulators and erection of 25 kV Single Pole Isolator without earth contact assembly.

-

-

4031.04

... More
32/28-Supply without insulators and erection of 25 kV drop out fuse switch for all type of AT's

-

-

29716

... More
31(t)(v)-Dismantling of material of termination of double OHE

-

-

2894.08

... More
15(a)(iii)-Supply of 105 sq.mm Annealed Stranded copper jumper as per latest RDSO specification

-

-

82626

... More
31(s)-Dismantling of fabricated steel & SPS

-

-

729.98

... More
31(e) -Dismantling of feeder wire/Return conductor

-

-

4199

... More
32/3(a)-Erection of traction masts and main masts of Switching stations and LT supply transformer station.

-

-

70853.28

... More
16(b) -Supply and erection of longitudinal bond

-

-

22933

... More
31(i)-Dismantling of an Isolator

-

-

1931.54

... More
32/31(t)(v)-Dismantling of material of termination of double OHE

-

-

2894.08

... More
32/11(a)(i)-Supply without Insulator and erection of 25 kV solid core cut-in insulator.

-

-

69768

... More
27(a)-Oil filtration, erection, testing and commissioning of 25 KV/240 volts, 5/10/25/50 kVA LT supply transformer

-

-

313439.2

... More
32/31(n)-Dismantlement of Guy Rod

-

-

1459.96

... More
32/8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

478.04

... More
34(f)(i)-Earth work in excavation and filling including compaction in Normal soil

-

-

12274

... More
11(b)-Supply without Insulator and erection of 25 kV Post insulator.

-

-

27648.8

... More
32/17(d)-Supply and erection of copper strips for equipment earthing

-

-

20672

... More
32/11(b)-Supply without Insulator and erection of 25 kV Post insulator.

-

-

6976.8

... More
3(b)-Erection of fabrication steel work such as TTC, portals, sps etc.

-

-

37354.95

... More
8(a)(xii)-Marking of "Y"- Measurement at BWA locations.

-

-

478.04

... More
Supply, fixing, connecting, installation, testing and commissioning of Automatic changeover panel 106 complete for color light signalling system having 3 phase supply 160Amps capacity with all connected accessories suitable for 25 KVA AT viz.Rotary selector switch, air break contactor, MCCBs, MCBs, LEDs, alarmbuzzer, alarm reset microswitch etc meeting RDSO technincal specification No. TI/SPC/PSI/CLS /0020 with A&C slip1 to 4 or latest.

-

-

5406539.2

... More
32/27(a)-Oil filtration, erection, testing and commissioning of 25 KV/240 volts, 5/10/25/50 kVA LT supply transformer

-

-

304653.6

... More
32/7(d)-Manual erection of all Aluminum 25 kV Feeder / Return conductor (spider)

-

-

7693.86

... More
17(b)-Extra for special embedment of earth electrode

-

-

20914.25

... More
31(n)-Dismantlement of Guy Rod

-

-

1459.96

... More
8(b)(iii)-Supply without Insulator and erection of material for termination of all aluminum 25 kV Feeder/ Return conductor (single SPIDER)

-

-

14522.08

... More
3(b)-Supply of fabricated steel work other than masts such as TTC's portal sets (with all components ) etc as per latest RDSO drawings and IS specifiations.

-

-

436659.4

... More
3(c)-Supply of fabricated steel work other than mast, ttcs, portals, such as SPS, special fabricated steel etc.

-

-

1602146.34

... More
32/3(c)-Erection of fabricated small part steel work etc

-

-

134477.82

... More
16(a)-Supply and erection of structure bonds

-

-

258400

... More
32/31(t)(iv)-Dismantling of copper jumper

-

-

936.7

... More
31(t)(i)-Dismantling of a regulating equipment with counter weight assembly for conv. OHE

-

-

5491

... More
4(ax)(i)-Supply of insulators for item 4(a)(i)(iii)(v)

-

-

24769.92

... More
17(a)-Supply and erection of earth electrode

-

-

214213.6

... More
32/8(b)(iii)-Supply without Insulator and erection of material for termination of all aluminum 25 kV Feeder/ Return conductor (single SPIDER)

-

-

2532.32

... More
32/31(s)-Dismantling of fabricated steel & SPS

-

-

729.98

... More
32/3(b)-Erection of fabrication steel work such as TTC, portals, sps etc.

-

-

29883.96

... More
32/4(a)(i)-Supply without Insulator and Erection of Single bracket assembly for conventional OHE.

-

-

25581.6

... More
3(a)-Erection of traction masts and main masts of Switching stations and LT supply transformer station.

-

-

70853.28

... More
32/8(b)(ii)-Supply without Insulator and erection of material for termination of Double Overhead equipment conductor.

-

-

5788.16

... More
32/31(t)(iii)-Dismantling of anti-creep with galv.steel wire

-

-

2034.9

... More
4(a)(i)-Supply without Insulator and Erection of Single bracket assembly for conventional OHE.

-

-

382948.8

... More
11(ax)(i)-Supply of insulators for item no 11(a)(i)(ii)

-

-

327935.44

... More
32/31 (a)-Transfer of equipment from one mast or support to other

-

-

54651.6

... More
PTFE Short Neutral Section Assembly Complete [Phase Break] Suitable for 107 Sq. mm Grooved Copper Contact Wire and 65 Sq. mm Cadmium Copper Catenary Wire as per RDSO Specification no. TI/SPC/OHE/ SNS/0000 Rev.1 with A& C slip no.1 or latest.

-

-

2419000

... More
Supply of 25 KVA, 25 KV/240V single phase oil filled Auxiliary Transformer as per RDSO specification no. Spec: ETI/PSI /15 (08- 2003)

-

-

10950400

... More
15(a)-Supply of material excluding copper wire and erection of all types of copper jumpers.

-

-

499422.6

... More
11(a)(i)-Supply without Insulator and erection of 25 kV solid core cut-in insulator.

-

-

13126.72

... More
32/31(l)(i)-Retrieval of traction masts, main masts, TTC uprights etc

-

-

80750

... More
32/3(e)-Supply and Erection of Guy Rod Assembly

-

-

2919.92

... More
32/4(a)(ii)-Extra on 4 (a) (i) for supporting two OHEs.

-

-

1905.7

... More
Designing, modification, printing and installation of Traction 25 KV SWR schematic diagrams with 104 media replaced as per incharge guidelines and remove old existing media and paste new modified diagram on existing board with all necessary pasting materials and printing in UV print and designing in corel draw package with different colours codes included isolator, BM, AT numbers, Signal numbers and UP and DN direction etc., of main station and towards either end station.

-

-

92400

... More
4(a)(ii)-Extra on 4 (a) (i) for supporting two OHEs.

-

-

27164.3

... More
32/31(k)(i)-Dismantlement of OHE mast/structure by cutting

-

-

45220

... More
28(a)-Supply of link pull rod for 25 kV DO Fuse switch as per latest RDSO specification

-

-

312873.6

... More
31(h)-Slewing of equipment

-

-

43508.1

... More
32/30(b)(iii)-Supply and erection of anti climbing device for LT supply transformer

-

-

18604.8

... More
41-Supply and erection of various types Caution boards for 25 KV AC Traction

-

-

46512

... More
1(a)-Preparation of designs and drawing for OHE

-

-

83773.28

... More
9(a)-Supply without Insulators and erection of anti creep with galvanised steel wire for conventional OHE.

-

-

38204.44

... More
32/31(i)-Dismantling of an Isolator

-

-

1931.54

... More
7(d)-Manual erection of all Aluminum 25 kV Feeder / Return conductor (spider)

-

-

8372.16

... More
16(c)-Supply and erection of transverse and special bonds

-

-

151164

... More
7(e)-Erection of copper cross feeder wires (37/2.25 mm HDBC)

-

-

534.89

... More
40-Supply and erection of Number Plates

-

-

445740

... More
32/31(t)(xii)-Re-adjustment of OHE spans including erection of droppers

-

-

96900

... More
2(b)(i)-Concrete for foundations & plinth other than hard soil and rock (including foundation for AT/BT)

-

-

2714492

... More
34(f)(ii)-Earth work in excavation and filling including compaction in Hard soil

-

-

8075

... More
32/31(h)-Slewing of equipment

-

-

43508.1

... More
32/9(a)-Supply without Insulators and erection of anti creep with galvanised steel wire for conventional OHE.

-

-

4069.8

... More
13(a) -Supply without insulators and erection of 25 kV Single Pole Isolator without earth contact assembly.

-

-

55420.34

... More
8(b)(ii)-Supply without Insulator and erection of material for termination of Double Overhead equipment conductor.

-

-

49225.2

... More
32/11(a)(ii)-Supply without Insulator and erection of 25 kV solid core suspension insulator.

-

-

23546.7

... More
11(a)(ii)-Supply without Insulator and erection of 25 kV solid core suspension insulator.

-

-

136338.3

... More
32/15(a)-Supply of material excluding copper wire and erection of all types of copper jumpers.

-

-

33721.2

... More
34(l)-Pitching and grouting on side slopes with contractors stone including plastering of 20 mm thick over stone masonry

-

-

123386

... More
17(d)-Supply and erection of copper strips for equipment earthing

-

-

249356

... More
6(a)(iii)-Supply of 7 mm dia. Solid round hard drawn copper wire as per latest RDSO specification

-

-

418065

... More
Designing, UV printing, supply and installation of traction 25 KV SWR schematic diagrams in 103 molded aluminum channel with elegant and stainless steel star bracket for hanging arrangement. Printing in UV print and designing in corel draw package with different colours codes included isolator, BM, AT numbers, Signal Numbers and UP & DN direction etc., of main station and towards either end station.

-

-

604200

... More
3(c)-Erection of fabricated small part steel work etc

-

-

134477.82

... More
11(bx)-Supply of 25 kV post insulator for item 11(b)

-

-

174017.2

... More
28-Supply without insulators and erection of 25 kV drop out fuse switch for all type of AT's

-

-

628170.4

... More
32/31(e) -Dismantling of feeder wire/Return conductor

-

-

4199

... More
1(c)-Preparation of station working rules diagram and working instructions

-

-

159497.4

... More
16(aa)-Drilling of holes on rails

-

-

25840



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.